DLNR General Conditions-DLNR General Conditions.pdf

PDF 6 MB Posted

Attached to
B19001517 Port Allen Small Boat Harbor New Harbor Office
Solicitation number
B19001517
Issued by
Kauai County, Kaanapali CDP, Hawaii

About this file

The provided document is the DLNR General Conditions related to a state and local contract opportunity for the construction of a new 14' x 44' (616 square foot) wooden framed harbor office building with concrete footing, stairs, water and sanitary piping, HVAC system, and electrical work at the Port Allen Small Boat Harbor in Kauai County, Hawaii. The project requires furnishing and paying for all necessary materials, tools, equipment, labor, and other incidental work as specified in the Detailed Specifications, General Conditions, Construction Notes, and any related addenda.

The document outlines the proposal requirements and conditions, award and execution of the contract, scope of work, control of work and materials, prosecution and progress, measurement and payment, and other general conditions. Pricing terms, set asides, incumbent information, funding requirements and sources are not provided in the document.

View the file

Other files

File Type Posted
Proposal Form-PROPOSAL.pdf PDF
103D-1 General Conditions.pdf PDF
Addendum No. 3-Addendum No. 3 w attachments.pdf PDF
Addendum No. 4-Addendum No. 4 w attachment.pdf PDF
Plans-PLANS.pdf PDF
Specifications-SPECS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER PAGE

TITLE PAGE
TABLE OF CONTENTS
SECTION 1-- DEFINITIONS
SECTION 2-- PROPOSAL REQUIREMENTS AND CONDITIONS
Qualification of Bidders
Interpretation of Quantities in Bid Schedule
Contents of Proposal Form
Bidders Responsibility for Examination of Plans, Specifications, Site of Work, Etc
Addenda and Interpretations
Preparation of Proposal
Bid Security
Delivery of Proposals
Withdrawal or Revision of Proposals
Public Opening of Proposals
Disqualification of Bidders
SECTION 3-- AWARD AND EXECUTION OF CONTRACT
Consideration of Proposals
Irregular Proposal
Award of Contract
Cancellation of Award
Return of Bid Security
Requirement of Performance and Payment Bonds
Execution of the Contract
Failure to Execute the Contract
Notice to Proceed
SECTION 4-- SCOPE OF WORK
Intent of Contract
Changes and Claims for Adjustment
SECTION 5-- CONTROL OF WORK
Authority of the Engineer
Shop Drawings and Other Submittals
Coordination of Contract Documents
Interpretation of Plans and Specifications
Cooperation Between the Contractor and the Department
Inspection
Removal of Defective and Unauthorized Work
Value Engineering Incentive
SECTION 6-- CONTROL OF MATERIALS AND EQUIPMENT
Materials and Equipment
Source of Supply and Quality of Materials
Substitution of Materials and Equipment
Asbestos Containing Materials
Test Samples
Material Samples
Non-Conforming Materials
Handling Materials
Storage of Materials
Property Rights in Materials
Assignment of Antitrust Claims for Overcharges for Goods and Materials Purchased
SECTION 7-- PROSECUTION AND PROGRESS
Prosecution of the Work
Commencement Requirements
Normal Working Hours
Hours of Labor
Prevailing Wages
Failure to Pay Required Wages
Payrolls and Payroll Records
Overtime and Night Work
Overtime and Night Time Payment for State Inspection Service
Limitations of Operations
Assignment or Change of Name
Laws to be Observed
Patented Devices, Materials and Processes
Sanitary, Health and Safety Provisions
Preservation and Restoration Of Property, Trees, Monuments, Etc
Responsibility for Damage Claims
Character of Workers or Equipment
Contract Time
Statement of Working Days
Suspension of Work
Disputes and Claims
Failure to Complete the Work on Time
Termination of Contract
Correcting Defects
Final Cleaning Up
Final Inspection
Project Acceptance Date
Final Settlement Of Contract
Contractor's Responsibility for Work
Personal Liability of Public Officials
Guarantee Of Work
Closing Contracts
Termination for Convenience of the State
Service Charge for Permanent Utility Connection
Right to Audit Records
SECTION 8--MEASUREMENT AND PAYMENT
Measurement of Quantities
No Waiver of Legal Rights
Payment and Compensation for Altered Quantities
Payment for Additional Work
Progress and/or Partial Payments
Deduction from Payment
Final Payment
Prompt Payment
APPENDIX
Estimate for Change Order
Name of Corporation Form
Contract Form
Surety Bid Bond Form
Surety Performance Bond Form
Performance Bond Form
Surety Labor and Material Payment Bond Form
Labor and Material Payment Form
Contractor Acknowledgement Form
Surety Acknowledgement Form
Certification of Recycled Content

File details come from the government source that posted it. Updated .