Specifications_-_Roof_Replacement.pdf
PDF 2 MB Posted
- Attached to
- Roof Replacement @ CUVA Federal contract opportunity
- Solicitation number
- 140P6425Q0035
About this file
This document is a detailed project specification for a roof replacement project at the Rockside Train Depot in Cuyahoga Valley National Park, located in Brecksville, Ohio. The project involves a complete roof system replacement, including removing the existing cedar shingle roof and installing new synthetic cedar shake shingles over approximately 2,760 square feet. Additional work includes replacing 244 linear feet of drip edge, 184 linear feet of gutters, and 40 linear feet of downspouts. The project specifications require the contractor to conduct a thorough roof deck inspection, potentially replace up to 20% of the existing 2"x6" tongue and groove decking, and ensure the roof remains watertight throughout the construction process.
The project is scheduled for completion within 120 calendar days of the Notice to Proceed, with specific requirements for material selection, installation techniques, and quality control. The synthetic shake shingles must be from an approved manufacturer like BRAVA, with a 50-year manufacturer warranty and specific performance characteristics including Class A fire rating, impact resistance, and no water absorption. The contractor must also follow stringent safety protocols, conduct weekly safety meetings, and comply with National Park Service regulations. The project is set up as a firm-fixed price contract, with provisions for potential change orders if unforeseen deck damage is discovered during the roof removal process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6425Q0035_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Site_Visit_Attendees_List_0001.pdf | ||
| Attachment_-_Construction_Contract_Administration.pdf | ||
| Price_Schedule_-_Roof_Replacement.xlsx | XLSX spreadsheet | |
| Technical_Questionnaire.pdf | ||
| Price_Schedule_-_Roof_Replacement.pdf | ||
| Wage_Determination_-_Cuyahoga_Co.pdf | ||
| Attachment_-_Provisions_to_be_Completed.pdf | ||
| Sol_140P6425Q0035.pdf | ||
| Technical_Questionnaire.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Div. 1 V. 2023-11-11 Page | 1
Cuyahoga Valley National Park Brecksville, Ohio
Rockside Train Depot Roof Replacement
PMIS 344653
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
February 20, 2025
Page | 2
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 31 36 - Synthetic Shake Shingles
DRAWINGS AND PHOTOGRAPHS
Appendix A- Photographs Appendix B- Location and Site Plan Appendix C- Submittal Log
Page | 3
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: Located in Northeastern Ohio, Cuyahoga Valley National Park consists of 33,000 acres and is situated along 22 miles of the Cuyahoga River Valley between the cities of Akron and Cleveland. The Rockside Train Depot provides shelter at the Cuyahoga Valley Scenic Railroad Rockside Station. The current roof exhibits material failure, cedar shingles are severely decayed and broken or missing in numerous locations. The aging and failing roof system and associated components must be replaced. This roofing project will extend the asset life cycle and reduces service-wide maintenance backlog.
1.2 Work Covered by the Contract Documents:
A. Project Location: Cuyahoga Valley National Park Rockside Station, 7900 Old Rockside Rd, Independence, OH 44131
B. Work consists of: This project will replace the roof and gutters on the Rockside Train Depot.
The cedar shingle roof will be replaced with new synthetic cedar shake shingles laid over synthetic underlayment, and ice and water shield. Roof work will also include removal and installation of new drip edge, gutters, gutter guards, and downspouts. This project will replace approximately: 2,760 square feet of synthetic cedar shake shingles, 244 lineal feet of drip edge, 184 lineal feet of gutters, and 40 lineal feet of downspouts.
1. Work includes removal of existing roof system and installation of new system including:
i. 2,760 SF Synthetic Cedar Shake Shingles
ii. 92 LF Ridge Cap
iii. 2760 SF Synthetic Underlayment
iv. 184 LF Ice & Water Shield
v. 244 LF Drip Edge
vi. 184 LF 6” Half Round Gutters, Mill Finish Aluminum, Standard Bead
vii. 40 LF 4” Smooth Round Downspouts, Mill Finish Aluminum
viii. Gutter and downspout accessories including mill finish aluminum endcaps, elbows, outlets, downspout brackets, and hangers.
ix. Leaf guards/filters on all gutters.
x. Replacement of up to 20% of existing 2”x6” T&G roof decking, as necessary. Limits of replacement to be determined by contractor and COR after removal of existing roof system. Roof decking to be replaced in kind.
xi. Avoid replacing materials when stormy or inclement weather is eminent or prevents good workmanship. Ensure that areas of work are not left exposed or demo-ed before the materials are on site and ready for installation of that product/ material. The removal of the current roof shingles is not to be removed unless the materials are onsite and ready to be installed appropriately.
Page | 4
Temporary roofing during construction where required. Temporary roofing shall maintain the project roof is watertight and able to prevent leaks and damage to the building and structure until the reroofing work is completed. Contractor is to make sure that at the completion of work each day the projects roof is 100% watertight.
xii. Contractor receiving award is expected to field verify conditions prior to commencing work.
2. Work includes checking all drains, confirm flow and exit locations.
3. Removal of existing roof system down to existing roof deck includes 100% removal of nails and protrusions.
C. All work will be performed under a single contract.
D. Period of performance: Work shall be completed within 120 calendar days of the start date provided on the Notice to Proceed.
a. Clarification: The Notice to Proceed will be issued with a period of performance that is all inclusive of supply lead times, material deliveries, decommissioning, installation, anticipated average weather days for location, final commissioning, and acceptance of completed work. The contractor will be expected to provide a project schedule with adequate critical path details to ensure all work is completed within the stated calendar days from issuance of the Notice to Proceed. If weather impacts project beyond typical average weather patterns, contractor shall provide documentation in request for additional days.
ITEM 2 – PROTECTING EXISTING UTILITIES
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative (COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
Page | 5
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
Superintendent's Compendium - Cuyahoga Valley National Park (U.S. National Parks Service)
A. Communications: Contractor shall provide the Contracting Officer and COR with methods of communications including land and/or cell phone numbers (note some areas of work have limited service coverage), email and in case of emergency 24-hour contact options for duration of time operations.
B. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
C. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
D. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Parking, staging, and dumpster placement on site map.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of
8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding
Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
Page | 6
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Do Not disturb site outside of noted disturbance area, including earthwork and clearing of vegetation, to: N/A
D. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.
2. Water Service: Water from existing water system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from existing system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Waste Operation:
a. Toilets: Contractor must provide toilets for contractor personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.
b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate as shown on site plan or coordinated with COR.
E. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
Page | 7
3. Tree and Plant Protection: N/A
4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
5. Temporary Enclosures: Provide temporary enclosures such as snow fence as required for protection of construction in progress and completed, from access by visitors or staff, other construction operations, and similar activities.
6. Site Enclosure Fence: N/A
7. Hot Work Permit: N/A
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage units shall be provided by the contractor and exact location within staging area may be discussed at the preconstruction briefing. All storage units provided by the contractor shall be in a clean and acceptable condition to the COR. Security of the materials and equipment on site is the Contractor’s responsibility.
3.5 Preservation of Natural Features: N/A
3.6 Hauling Restrictions: Contractor shall verify and be responsible for the path accessing the site and obtaining / maintaining all local, state and federal permits/licenses associated with hauling/road requirements and dumping of materials associated with the project.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3. Contractor shall sweep entire area around building to 20’ beyond building perimeter with a magnet at the end of each workday that removal or nailing activities take place.
Contractor shall complete a minimum of 1 sweep of entire project site with magnets prior to demobilizing.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
Page | 8
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
c.
B. New /Existing Buildings Unoccupied: N/A
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted preferably electronically by email or optional via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
D. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
Page | 9
A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management: N/A
A. Contractor shall not have personal radios or other media sources, and they shall not be broadcast within NPS property.
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items visible during site visit will be allowed. Contractor is responsible to verify all NPS quantities and materials estimates to complete the project.
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the
Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
Page | 10
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
Page | 11
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA
29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain 2 sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the local 911 Emergency Response, COR and or the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items are to be submitted prior to the Preconstruction Conference or as specified at the CO’s discretion. The timeline for the documents to be submitted will be addressed at the pre-construction conference for those items that were not received and approved prior. Notice to Proceed may not be issued, and
Page | 12 the Contracting Officer will consider other contractual remedies if not resolved as directed.
Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Quality Control Plan.
8. Waste Management Plan: Contractor is required to provide and maintain dumpsters for construction debris through the duration of the project. Location of these dumpsters is identified on the attached site plan.
9.2 Project Submittal Process (Shop Drawings, Product Data, and Samples): Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all product color selections.
Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the
Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
Page | 13
9.3 Approved Equals: All brand names noted are subject to ‘or equal’ products. If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification. Contractor shall incorporate and be responsible for all collateral costs due to the or equal proposed as required to provide a complete project.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that General Contractor:
1. Has investigated and shall provide documentation in request showing that the proposed item is equal or superior in all respects to the salient characteristics specified.
2. Will meet or exceed warranties for the proposed item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the
Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.
9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.
Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
Page | 14
B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the
CO.
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
Page | 15
F. Disposition of any permits and warranties required by the specifications in this section.
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of
Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.
B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
C. Information shall include operation and maintenance manuals for each warranted product.
END OF SECTION
Page | 16
PART 1-GENERAL
1.1 SCOPE OF WORK
A. Project Location: Cuyahoga National Park, 15610 Vaughn Rd. Brecksville OH 44141
B. Building(s) Name/Identifier: Rockside Train Station 9807 Old Rockside Rd. Independence OH
C. Work consists of the following:
1. Full tear-off of roof system at areas indicated on Drawings or in Photographs provided. Removal of existing roofing system down to existing roof deck.
a. Removal of existing roof system down to existing roof deck includes 100% removal of nails and protrusions.
2. Re-cover preparation of entire roof area where tear-off occurs, including installation of new roofing system.
3. Removal of flashings and counter flashings.
4. Temporary roofing during construction where required. Temporary roofing shall maintain the project roof is watertight and able to prevent leaks and damage to the building and structure until the reroofing work is completed. Contractor is to make sure that at the completion of work each day the projects roof is 100% watertight.
5. Remove and replace the existing roof system and associated roof flashings, down to deck and patch any openings in the 2”x6” T&G decking to the nearest rafters to securely nail to structure as required before installing the new roof system, associated metal roof flashings and trims.
Replace existing roof gutters and downspouts.
6. Paint underside of any replaced roof decking exposed from below to match existing color.
Cuyahoga Valley National Park will provide paint specification if needed.
7. National Park Service (NPS) requires the existing roof decks to be walked after demolition has been completed with the onsite Contracting Office Representative (COR) or designated Project Inspector prior to installation of any new roof materials to ascertain if any water penetration has caused deterioration or corrosion of the existing 2”x6” T&G decking which are to remain. If there are areas of concern the COR may require the Contractor to perform pull out tests to determine if the existing decking in question can remain or if it will need to be replaced. This can include visible areas of water damage or insect related damage. Testing and replacement of these types of unforeseen damaged areas will be by Change Order if required.
D. Roof Area:
1. Roof area for project is 2760 SF with approximately 224 LF of gutters and downspouts.
2. Note the Contractor is encouraged to field verify roof dimensions prior to bidding.
1.2 SUMMARY
A. Section Includes:
1. Selective Demolition.
Page | 17
2. Synthetic shake shingles.
3. Underlayment and shake interlayment materials.
4. Sheet metal flashing and trim.
5. Gutter and downspouts.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.4 ACTION SUBMITTALS
A. Product Data: For the following:
1. Synthetic shake shingles.
2. Underlayment materials.
3. Sheet metal flashing and trim.
4. Elastomeric flashing sealant.
B. Shop Drawings: For metal flashing and trim.
C. Samples: For each exposed product and color.
1. Aesthetic match by any manufacturer submitting as an approved equal to the Name Brand Product must be approved in writing by the COR.
1.5 INFORMATIONAL SUBMITTALS
A. Sample warranty.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.7 SUBMITTAL COORDINATION
A. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of the submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
1.8 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in the manufacture of synthetic shake shingle.
B. Installer Qualifications: Minimum 3 years’ experience in work of this Section.
C. Mockup:
1. Provide mockup of shingles, underlayment, and related flashings.
2. Size: Minimum of 8 x 8 feet.
3. Approved mockup may remain as part of the Work.
1.9 DELIVERY, STORAGE AND HANDLING
Page | 18
A. Ship shingle in bundles:
1. Collate in sequence of widths and colors as required for selected color blend.
2. Assemble bundles so that sorting at job site is not required.
B. Deliver shingles to site in manufacturer’s unopened, labeled bundles.
1. Verify quantities and conditions upon delivery.
2. Remove damaged products from site.
C. Store products in protected environment, off ground, protected from moisture, traffic, and construction activities.
D. Store shingles flat. Do not store on site for prolonged period.
E. Store products at temperature between 40 & 120 degrees F (4 degrees C & 49 degrees C).
F. Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of authorities having jurisdiction.
1.10 SITE CONDITIONS
A. Environmental Requirements:
1. Observe manufacturer’s temperature, humidity, and moisture limits.
2. Do not install products under environmental conditions outside manufacturer’s absolute limits.
1.11 WARRANTY
A. Furnish manufacturer’s 50-year warranty against breakage and deterioration resulting in leaks under normal weather and use conditions.
B. Furnish installer’s 1-year total roof system warranty against water penetration, including underlayment, flashings, trims, and other roof components.
PART 2-PRODUCTS
2.1 MANUFACTURES
A. Acceptable manufacturers are as follows:
1. BRAVA Synthetic Polymer Shake Roofing Tile. (Color: Sierra 521)
2. Brand name or “or equal” requirement, must meet, based on the following specifications:
a. Quantity: 28 squares (2800 square feet)
b. Shingles will be a length of 22 inches +- 1/8 inch per shingle.
c. Varying widths with minimum of 5 inches and maximum of 12 inches.
d. Starter shingles to be included to cover at least 184 linear feet.
e. 92 linear feet of Hip/Ridge Shingle accessory for 8/12 pitch to be included.
f. Specification sheet shall be submitted with quote.
Page | 19
2.2 PERFORMANCE REQUIREMENTS
A. Exterior Fire-Test Exposure: Provide roofing materials identical to those of assemblies tested for fire resistance in accordance with American Society of Testing Materials (ASTM) E108 or UL 790 by Underwriters Laboratories or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing agency.
B. Method of attachments designed to adequately resist wind uplift for roof configuration project location.
1. Certified to 115 mph wind speeds.
2.3 MATERIALS
A. Synthetic Shake Shingles:
1. Description: Lightweight, synthetic shake shingles with appearance, color, texture, and thickness of natural wood shakes.
2. Product: Multi-Width Shake by one of the manufacturers listed above.
3. Material: Engineered polymer formulated from 100 percent virgin plastic resins;
recycled materials not acceptable.
a. Solid core product.
b. Impact resistant.
c. Deep gain patterns.
d. No water absorption.
e. No mold or mildew growth.
f. No splitting, rotting, decay, or risk to fire.
4. Performance Characteristics:
a. Class A fire rated.
b. Water absorption: 0.18 percent by weight, tested to ASTM D471.
c. Impact resistance: Class 4, tested to UL 2218
d. Freeze-thaw resistance: No crazing, cracking, delamination of coating, or other deleterious surface changes after one month exposure with temperature cycled from minus 40 to plus 180 degrees F (0 degrees to 82 degrees C) in 22 hours, tested to International Code Council (ICC) ES Acceptance Criteria AC07 Section 4.9, or equal.
e. Accelerated weathering: Little change after 2,500 hours exposure to ultraviolet radiation, elevated temperature, moisture, and thermal shock.
f. Fungus resistance: No algae growth when inoculated with blue green algae in warm, damp environment for 4 to 6 weeks, tested to ASTM G21.
g. Installed approximate weight:
1. 9-inch (229 mm) exposure: 342 pounds per 100 square feet (16.5 kg/sq.
m).
h. Profile:
1. Rectangular shape with exposed-to-view upper surface and edges textured to resemble natural wood shake.
i. Size:
Page | 20
1. Thickness varies from approximately 1/8 inch (3 mm) to 1/4 inch (6mm) at the top, to 5/8 inch (16 mm) to 3/4 inch (19 mm) at bottom.
2. Length: Minimum 22 inches (559 mm).
3. Variable Widths: Provide a minimum of at least 3 different widths for the multi-width blend from the following nominal sizes 4, 5, 6, 7, 8, 9, and 12 inches (102, 127, 152, 178, 203, 229 and 305 mm) to create appearance of random sized natural wood shake installation.
j. Starter shingle: Minimum 12 inches (305 mm) long x 12 inches (305 mm) wide.
k. Hip and ridge units: Manufacturers standard refabricated units as required for roof pitches indicated in the drawings or photographs.
l. Markings: Form shingles with markings on upper surface to indicate nailing locations and provide alignment guidelines for different exposure lengths.
m. Color:
1. Color as selected by COR from manufacturer’s full range.
2. Provide internal ultraviolet stabilizers.
n. Shingle pattern:
1. Provide shingles factory blended in multiple widths.
2. Blend to be selected by COR from manufacturer’s full range.
2.4 UNDERLAYMENT AND SHAKE INTERLAYMENT MATERIALS
A. Provide underlayment and interlayment products from one of the following manufacturers and products listed below and complying with the following. Approved products include but are not limited to the following:
1. Versashield underlayment by GAF, in addition to the required self-adhered membrane noted below in paragraph 2.4.B. ASTM E108 or UL 790.
2. VulcaSeal G40 underlayment by Fontana, in addition to the required self-adhered membrane noted below in paragraph 2.4.B. ASTM E108 or UL 790.
3. Solarhig (ESR-4035) underlayment by Eco Chief, in addition to the required self-adhered membrane noted below in paragraph 2.4.B. ASTM E108 or UL 790.
B. Valleys, Eaves, Rake, and Roof/Wall Intersections: Install Self-Adhering, Polymer-Modified
Bitumen Sheet: ASTM D1970/D1970M, minimum 55-mil- (1.4-mm-) thick sheet; glass-fiber-mat-reinforced, polymer-modified asphalt; with slip-resistant top surface and release backing;
cold applied. Provide primer for adjoining concrete, masonry, and metal surfaces to receive underlayment. Approved product includes but is not limited to the following:
1. Grace Ice & Water Shield; Grace Construction Products.
2. WinterGuard Waterproofing underlayment; CertainTeed.
3. RhinoRoof Granulated Self-Adhered underlayment.
2.5 ACCESSORIES
A. Asphalt Roofing Cement: ASTM D4586/D4586M Type II, asbestos free.
B. Roofing Nails: ASTM F1667, stainless steel, Type 304, or stainless steel, Type 316 box-type wire nails, sharp pointed, and of sufficient length to penetrate a minimum of 3/4 inch (19 mm) into sheathing or decking.
1. Underside of 2”x6” T&G roof decking is exposed, nails should not protrude or be visible from underneath the structure.
2. Where nails are in contact with metal flashing, use nails made from same metal as flashing.
Page | 21
C. Synthetic Underlayment Fasteners: As recommended in writing by synthetic-underlayment manufacturer for application indicated.
2.6 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Full Roof Tear-off: Removal of existing roofing system down to existing roof deck or structure.
2. Temporarily protect existing roofing system and components that are to remain as required from damage.
3. Existing roof drains and roof drainage shall be protected during each stage of reroofing, and roof-drain plugs shall be installed when demolition is taking place so that debris cannot be lost down the drains. Contractor shall remove all drain plugs when demolition is completed in the area affecting the drain.
4. Do not remove more roof than can be replace in a day, and the roof will be made watertight each night.
5. Remove debris and materials so as not to impose excessive loads on supporting roof, structure or framing.
6. Dispose of demolished items and materials promptly.
B. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Reinstall items in locations indicated, or in original locations as required. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
3. Lightning protection to be removed and reinstalled by a certified installer.
C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.
D. Inspect deck after tear-off of roofing system.
1. If broken or loose fasteners that secure deck panels to one another or to structure are observed, or if deck appears or feels inadequately attached, immediately notify COR.
a. Do not proceed with installation until directed by COR.
2. If deck surface is unsuitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify COR.
a. Do not proceed with installation until directed by COR.
3. Ensure the roof deck is 100% free of nails and protrusions.
E. Disposal of Demolished Materials:
1. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain NPS's property, remove demolished materials from Project site.
a. Do not allow demolished materials to accumulate on-site.
b. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
Page | 22
2. Burning: Do not burn demolished materials.
3. Disposal: Transport demolished materials off NPS's property and legally dispose of them.
F. Cleaning:
1. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
G. Underlayment Materials:
1. Synthetic Underlayment: Laminated or reinforced, woven polyethylene or polypropylene, synthetic roofing underlayment; bitumen free; slip resistant; suitable for high temperatures over 111 deg C (220 deg F); and complying with physical requirements of ASTM D 22/D 226M for Type I and Type II felts.
H. Miscellaneous Materials:
1. General: Provide materials and types of fasteners, solder, protective coatings, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation and as recommended by manufacturer of primary sheet metal or manufactured item unless otherwise indicated.
2. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads and recommended by manufacturer of primary sheet metal or manufactured item.
a. General: Blind fasteners or self-drilling screws, gasketed, with hex-washer head.
1) Exposed Fasteners: Heads matching color of sheet metal using plastic caps or factory-applied coating. Provide metal-backed Ethylene Propylene Diene Monomer (EPDM) or Polyvinyl Chloride (PVC) sealing washers under heads of exposed fasteners bearing on weather side of metal.
2) Blind Fasteners: High-strength aluminum or stainless-steel rivets suitable for metal being fastened.
b. Fasteners for Zinc-Coated (Galvanized) or Aluminum-Zinc Alloy-Coated Steel Sheet:
Series 300 stainless steel or hot-dip galvanized steel according to ASTM A 153/A 153M or
ASTM F 2329.
3. Sealant Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound sealant tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape 13 mm (1/2 inch) wide and 3 mm (1/8 inch) thick.
4. Elastomeric Sealant: ASTM C 920, elastomeric polymer sealant; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.
5. Butyl Sealant: ASTM C 1311, single-component, solvent-release butyl rubber sealant;
polyisobutylene plasticized; heavy bodied for hooked-type expansion joints with limited movement.
I. Fabrication General:
1. General: Custom fabricate sheet metal flashing and trim to comply with details shown and recommendations in cited sheet metal standard that apply to design, dimensions, geometry, metal thickness, and other characteristics of item required. Fabricate sheet metal flashing and trim in shop to greatest extent possible.
a. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with performance requirements, but not less than that specified for each…