Price_Schedule_-_Roof_Replacement.pdf

PDF 140 KB Posted

Attached to
Roof Replacement @ CUVA Federal contract opportunity
Solicitation number
140P6425Q0035
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document is a Price Schedule for a Roof Replacement project at Cuyahoga Valley National Park in Brecksville, Ohio. The pricing template provides a detailed breakdown of construction items including mobilization/demobilization, demolition of existing roof components, installation of new synthetic cedar shake shingles, gutters, and downspouts, with line items for materials, labor, overhead, profit, and bonds. The schedule allows for a 20% decking replacement as necessary and requires the contractor to verify all quantities and measurements to provide a firm fixed price covering the entire project's completion. The quantities are listed as lump sum (LS) with spaces for unit prices and subtotals, though no specific dollar amounts are filled in on this template.

View the file

Other files for this federal contract opportunity

Other files attached to Roof Replacement @ CUVA, newest first.
File Type Posted
Site_Visit_Attendees_List_0001.pdf PDF
Sol_140P6425Q0035_Amd_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Wage_Determination_-_Cuyahoga_Co.pdf PDF
Attachment_-_Provisions_to_be_Completed.pdf PDF
Sol_140P6425Q0035.pdf PDF
Technical_Questionnaire.docx DOCX document
Attachment_-_Construction_Contract_Administration.pdf PDF
Price_Schedule_-_Roof_Replacement.xlsx XLSX spreadsheet
Specifications_-_Roof_Replacement.pdf PDF
Technical_Questionnaire.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

-$ Grand Total (Roof Replacement + Decking Replacement)

Overhead Profit Bonds

Grand Total (Decking Replacement)

Install: Installation of new synthetic cedar shake shingles/gutters/downspouts and all associated work/items

- Labor

** It is the responsibility of the contractor to verify all the quantities/measurements and to provide a price that will cover the completion of the entire project for this firm fixed price contract. **

- Materials

Grand Total

Overhead

Subtotal

Bonds Profit

Decking Replacement: 20% decking replacement as necessary

- Materials/Labor

- Labor

Mobilization/Demobilization

- Mob/Demob Costs

Demolition: Removal and disposal of the existing shingles/gutters/downspouts and all associated work/items

- Materials

Construction Items

National Park Service U.S. Department of Interior

Cuyahoga Valley National Park

15610 Vaughn Rd Brecksville, OH 44141

PRICE SCHEDULE

PROJECT: Roof Replacement

Sheet1

File details come from the government source that posted it. Updated .