Questions_and_Answers_0001.pdf
PDF 91 KB Posted
- Attached to
- Roof Replacement @ CUVA Federal contract opportunity
- Solicitation number
- 140P6425Q0035
About this file
This document is a Questions and Answers amendment for a Roof Replacement project at Cuyahoga Valley National Park (CUVA). The amendment addresses four key questions: confirmation of a site visit list, job site egress points, permission to use a 5-yard trailer for waste transportation, and specific requirements for synthetic cedar shake shingles. The answers clarify that the site visit list will be attached, the main egress is the Rockside Train Depot Boarding Area entrance with a secondary exit at the Lock 39 Trailhead Parking Lot, a 5-yard trailer is permitted for waste transport, and synthetic cedar shake shingles are specifically required for the roof replacement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6425Q0035_Amd_0001.pdf | ||
| Site_Visit_Attendees_List_0001.pdf | ||
| Attachment_-_Construction_Contract_Administration.pdf | ||
| Price_Schedule_-_Roof_Replacement.xlsx | XLSX spreadsheet | |
| Specifications_-_Roof_Replacement.pdf | ||
| Technical_Questionnaire.pdf | ||
| Price_Schedule_-_Roof_Replacement.pdf | ||
| Wage_Determination_-_Cuyahoga_Co.pdf | ||
| Attachment_-_Provisions_to_be_Completed.pdf | ||
| Sol_140P6425Q0035.pdf | ||
| Technical_Questionnaire.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140P6425Q0035
Amendment #: 0001
Roof Replacement – CUVA
Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response 1.
Will the site visit list be posted?
See attached document posted in this amendment
2.
What are the points of egress of the job site?
The main point of egress of the jobsite is the main entrance/exit of the Rockside Train Depot Boarding Area, and the secondary point of egress is across the path and bridge to the Lock 39 Trailhead Parking Lot.
3.
Since the dumpster location is a distance away from the job site, would permission be granted to allow for up to a 5-yard trailer to be used for transporting of the waste material to the dumpster site?
Yes
4.
Could you please clarify whether the shingles required for this project must specifically be synthetic cedar shake shingles?
Yes, shingles for this project must specifically be synthetic cedar shake shingles.