Summary of Le Mars Maintenance Garage Sealant Replacement Project Specifications
This document comprises the technical specifications and administrative requirements for the Le Mars Maintenance Garage Sealant Replacement project, issued by the Iowa Department of Transportation (Iowa DOT) under Contract Number BG-2L21(004)--80-75. The project involves the removal and replacement of approximately 1,650 linear feet of existing building sealant and backer rods at control joints, expansion joints, window penetrations, and around building penetrations, along with approximately 350 linear feet of sealant in joints between the existing building and existing paving at the Le Mars Maintenance Garage facility in Warren County, Iowa. The contract is structured as a single prime contract based on stipulated pricing under Iowa DOT's Standard Bid Terms and Conditions. Pierce Coady of the Design Team, Support Services Bureau serves as the Owner Project Manager. The project timeline extends to June 30, 2026, with a preconstruction meeting to be scheduled by the Owner following the Notice of Award. Bidders are strongly encouraged to schedule a site visit to assess existing conditions.
The specifications establish comprehensive requirements for sealant materials, installation procedures, quality assurance, and project administration. Nonsag gunnable sealants (Type EXT-1, nonstaining silicone) and self-leveling pourable sealants (Type EXT-2, silicone) are specified, with all sealants and primers required to have lower volatile organic compound (VOC) content than required by SCAQMD 1168. The contractor must perform preinstallation field adhesion testing using destructive testing methods per ASTM C1521 prior to general installation. The specifications mandate comprehensive project documentation including record drawings, operation and maintenance manuals, warranties, bonds, waste management reports, and demonstration and training for Owner personnel. Contractors are responsible for temporary utilities, facilities, site security, waste management with emphasis on recycling and salvage, and progressive site cleaning. The project requires compliance with applicable federal, state, and local regulations, and contractors must maintain one-year maintenance service from the Date of Substantial Completion or the warranty period, whichever is longer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Le Mars Maintenance Garage - Sealant Replacement/Iowa DOT
BG-2L21(004)--80-75
Page
01 10 00 Summary
SECTION 01 10 00
SUMMARY
PART 1 GENERAL
PROJECT
1.01 PROJECT NAME:
A. Le Mars Maintenance Garage - Sealant Replacement
1.02 OWNER'S NAME:
A. State of Iowa, Iowa Department of Transportation.
1.03 OWNER PROJECT MANAGER'S NAME: PIERCE COADY
A. Design Team, Support Services Bureau, Iowa Department of Transportation.
1.04 THE PROJECT CONSISTS OF THE FOLLOWING BUILDING STRUCTURES AND SITEWORK:
A. Removal and replacement of appproximately 1,650 linear feet of existing building sealant and backer rods at control joints, expansion joints and around penetrations and windows..
B. Removal and replacement of approximately 350 linear feet of existing sealant in joints between the existing building and existing paving.
1.05 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price as described in
IOWADOT's Standard Bid Terms and Conditions.
1.06 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to the boundaries of the property line indicated on the plans.
1. Locate and conduct construction activities in ways that will limit disturbance to site.
B. Arrange use of site and premises to allow:
1. Work by Others.
2. Work by Owner.
C. Provide access to and from site as required by law and by Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
BG-2L21(004)--80-75
Page
01 30 00 Administrative Requirements
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Preconstruction meeting.
B. Progress meetings.
C. Construction progress schedule.
D. Submittals for review, information, and project closeout.
E. Number of copies of submittals.
F. Requests for Interpretation (RFI) procedures.
G. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 00 72 00 - General Conditions: Dates for applications for payment.
B. Section 00 73 00 - Supplementary Conditions:
C. Section 01 60 00 - Product Requirements: General product requirements.
D. Section 01 78 00 - Closeout Submittals: Project record documents; operation and maintenance data; warranties and bonds.
1.03 REFERENCE STANDARDS
A. AIA G716 - Request for Information; 2004.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Owner Project Manager will schedule a meeting after Notice of Award.
B. Attendance Required:
1. Owner.
2. Owner Project Manager/Engineer.
3. General Contractor.
4. All major Sub-Contractors.
C. Agenda:
1. Review Owner-Contractor Agreement and contract conditions.
2. Submission of executed bonds and insurance certificates.
3. Designation of personnel representing the parties to Contract, Owner and Architect .
4. Review procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
5. Coordinate commencement of contstruction.
6. Use of premises by Owner and Contractor.
7. Temporary utilities provided by Contractor.
8. Security and housekeeping procedures.
9. Procedures for testing.
10. Procedures for maintaining record documents.
11. Scheduling.
D. Record minutes and distribute copies within two days after meeting to participants, with copies to Owner Project Manager, Owner, participants, and those affected by decisions made.
BG-2L21(004)--80-75
Page
01 30 00 Administrative Requirements
3.02 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-weekly intervals.
B. General Contractor will make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
C. Attendance Required: Job Superintendent, major Subcontractors and suppliers, Owner, Architect/Engineer, as appropriate to agenda topics for each meeting.
1. Contractor.
2. Owner.
3. Owner Project Manager.
4. Contractor's superintendent.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of Work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of RFIs log and status of responses.
7. Review of off-site fabrication and delivery schedules.
8. Maintenance of progress schedule.
9. Corrective measures to regain projected schedules.
10. Planned progress during succeeding work period.
11. Coordination of projected progress.
12. Status of Proposal Requests, Change Orders, Architect's Supplemental Instructions and
Requests For Information. Maintenance of quality and work standards.
13. Maintenance of quality and work standards.
14. Effect of proposed changes on progress schedule and coordination.
15. Other business relating to work.
E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Owner Project Manager, Owner, participants, and those affected by decisions made.
3.03 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of work, with a general outline for remainder of work.
B. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
D. Within 10 days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
3.04 REQUESTS FOR INTERPRETATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
2. A resolution to an issue which has arisen due to field conditions and affects design intent.
BG-2L21(004)--80-75
Page
01 30 00 Administrative Requirements
B. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
2. Prepare in a format and with content acceptable to Owner.
a. Use AIA G716 - Request for Information .
C. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Unacceptable Uses for RFIs: Do not use RFIs to request the following::
a. Approval of submittals (use procedures specified elsewhere in this section).
b. Approval of substitutions (see Section - 01 60 00 - Product Requirements)
c. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).
d. Different methods of performing work than those indicated in the Contract Drawings and Specifications (comply with provisions of the Conditions of the Contract).
2. Frivolous RFIs: Requests regarding information that is clearly indicated on, or reasonably inferable from, Contract Documents, with no additional input required to clarify the question. They will be returned without a response, with an explanatory notation.
a. The Owner reserves the right to assess the Contractor for the costs (on time-and-materials basis) incurred by the Owner Project Manager, and any of its consultants, due to processing of such RFIs.
D. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
E. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
F. RFI Log: Prepare and maintain a tabular log of RFIs for the duration of the project.
1. Indicate current status of every RFI. Update log promptly and on a regular basis.
2. Note dates of when each request is made, and when a response is received.
3. Highlight items requiring priority or expedited response.
4. Highlight items for which a timely response has not been received to date.
G. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to Owner.
1. Response may include a request for additional information, in which case the original RFI will be deemed as having been answered, and an amended one is to be issued forthwith.
Identify the amended RFI with an R suffix to the original number.
2. Do not extend applicability of a response to specific item to encompass other similar conditions, unless specifically so noted in the response.
3.05 SUBMITTAL SCHEDULE
A. Submit to Owner Project Manager for review a schedule for submittals in tabular format.
1. Submit at the same time as the preliminary schedule.
2. Format schedule to allow tracking of status of submittals throughout duration of construction.
3. Account for time required for preparation, review, manufacturing, fabrication and delivery when establishing submittal delivery and review deadline dates.
a. For assemblies, equipment, systems comprised of multiple components and/or requiring detailed coordination with other work, allow for additional time to make corrections or revisions to initial submittals, and time for their review.
3.06 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
BG-2L21(004)--80-75
Page
01 30 00 Administrative Requirements
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Owner Project Manager for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 78 00 - Closeout Submittals.
3.07 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Other types indicated.
7. Manufacturer's field reports.
8. Other types indicated.
B. Submit for Owner Project Manager's knowledge as contract administrator or for Iowa Department of Transportation. No action will be taken.
3.08 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 78 00 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
D. Submit for Owner's benefit during and after project completion.
3.09 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Samples: Submit the number specified in individual specification sections; one of which will be retained by Owner Project Manager.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.10 SUBMITTAL PROCEDURES
General Requirements:
1. Use a separate transmittal for each item.
2. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix.
3. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
BG-2L21(004)--80-75
Page
01 30 00 Administrative Requirements
a. Submittals from sources other than the Contractor, or without Contractor's stamp will not be acknowledged, reviewed, or returned.
4. Schedule submittals to expedite the Project, and coordinate submission of related items.
a. For each submittal for review, allow 21 days excluding delivery time to and from the
Contractor.
b. For sequential reviews involving Owner Project Manager's consultants, Owner, or another affected party, allow an additional 7 days.
c. For sequential reviews involving approval from authorities having jurisdiction (AHJ), in addition to Owner Project Manager's approval, allow an additional 30 days.
5. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed work.
6. Provide space for Contractor and Owner Project Manager review stamps.
7. Distribute reviewed submittals. Instruct parties to promptly report inability to comply with requirements.
8. Incomplete submittals will not be reviewed, unless they are partial submittals for distinct portion(s) of the work, and have received prior approval for their use.
A. Product Data Procedures:
1. Submit only information required by individual specification sections.
2. Collect required information into a single submittal.
3. Do not submit (Material) Safety Data Sheets for materials or products.
B. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting
Contract Documents and coordinating related work.
2. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
C. Transmit each submittal with AIA Form G810.
D. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.
E. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate on each copy.
F. Apply Contractor's Stamp, signed or initialed certifying that review, approval, verification of
Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirments of the Work and Contract Documents.
G. Deliver submittals to Owner in electronic format only.
1. Only physical samples to be submitted to Owner's address.
H. Schedule submittals to expedite the Project, and coordinate submission of related items.
I. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.
J. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of the completed Work.
K. Provide space for Contractor and Architect review stamps.
L. When revised for resubmission, identify all changes made since previous submission.
M. Distribute reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.
N. Submittals not requested will not be recognized of processed.
3.11 SUBMITTAL REVIEW
A. Submittals for Review: Owner Project Manager will review each submittal, and approve, or take other appropriate action.
BG-2L21(004)--80-75
Page
01 30 00 Administrative Requirements
B. Submittals for Information: Owner Project Manager will acknowledge receipt and review. See below for actions to be taken.
C. Owner Project Manager's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
D. Owner Project Manager's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. "Approved", or language with same legal meaning.
b. "Approved as Noted, Resubmission not required", or language with same legal meaning.
1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.
c. "Approved as Noted, Resubmit for Record", or language with same legal meaning.
2. Not Authorizing fabrication, delivery, and installation:
a. "Revise and Resubmit".
1) Resubmit revised item, with review notations acknowledged and incorporated.
b. "Rejected".
1) Submit item complying with requirements of Contract Documents.
E. Owner Project Manager's and consultants' actions on items submitted for information:
1. Items for which no action was taken:
a. "Received" - to notify the Contractor that the submittal has been received for record only.
2. Items for which action was taken:
a. "Reviewed" - no further action is required from Contractor.
BG-2L21(004)--80-75
Page
01 40 00 Quality Requirements
SECTION 01 40 00
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. References and standards.
D. Inspection agencies and services.
E. Contractor's construction-related professional design services.
F. Contractor's design-related professional design services.
G. Control of installation.
H. Mock-ups.
I. Tolerances.
J. Manufacturers' field services.
K. Defect Assessment.
1.02 RELATED REQUIREMENTS
A. Document 00 31 00 - Available Project Information: Soil investigation data.
B. Document 00 72 00 - General Conditions: Inspections and approvals required by public authorities.
C. Section 01 30 00 - Administrative Requirements: Submittal procedures.
D. Section 01 60 00 - Product Requirements: Requirements for material and product quality.
1.03 REFERENCE STANDARDS
1.04 DEFINITIONS
A. Contractor's Professional Design Services: Design of some aspect or portion of the project by party other than the design professional of record. Provide these services as part of the Contract for Construction.
1. Design Services Types Required:
a. Construction-Related: Services Contractor needs to provide in order to carry out the Contractor’s sole responsibilities for construction means, methods, techniques, sequences, and procedures.
b. Design-Related: Design services explicitly required to be performed by another design professional due to highly-technical and/or specialized nature of a portion of the project. Services primarily involve engineering analysis, calculations, and design, and are not intended to alter the aesthetic aspects of the design.
B. Design Data: Design-related, signed and sealed drawings, calculations, specifications, certifications, shop drawings and other submittals provided by Contractor, and prepared directly by, or under direct supervision of, appropriately licensed design professional.
1.05 CONTRACTOR'S CONSTRUCTION-RELATED PROFESSIONAL DESIGN SERVICES
A. Coordination: Contractor's professional design services are subject to requirements of project's
Conditions for Construction Contract.
B. Provide such engineering design services as may be necessary to plan and safely conduct certain construction operations, pertaining to, but not limited to the following:
1. Temporary sheeting, shoring, or supports.
2. Temporary hoist(s) and rigging.
3. Investigation of soil conditions to support construction equipment.
BG-2L21(004)--80-75
Page
01 40 00 Quality Requirements
1.06 CONTRACTOR'S DESIGN-RELATED PROFESSIONAL DESIGN SERVICES
A. Coordination: Contractor's professional design services are subject to requirements of project's
Conditions for Construction Contract.
B. Base design on performance and/or design criteria indicated in individual specification sections.
C. Scope of Contractor's Professional Design Services: Provide for the following items of work:
1. Structural Design of Formwork: As described in Section 03 10 00 - Concrete Forming and Accessories.
2. Sprinkler Layout: Coordinate with ceiling installation, detailed pipe layout, and hydraulic calculations as described in Section 21 13 00 - Fire-Suppression Sprinkler Systems.
1.07 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Designer's Qualification Statement: Submit for Owner Project Manager's knowledge as contract administrator, or for Owner's information.
1. Include information for each individual professional responsible for producing, or supervising production of, design-related professional services provided by Contractor.
a. Full name.
b. Professional licensure information.
c. Statement addressing extent and depth of experience specifically relevant to design of items assigned to Contractor.
C. Design Data: Submit for Owner Project Manager's knowledge as contract administrator for the limited purpose of assessing compliance with information given and the design concept expressed in the Contract Documents, or for Owner's information.
1. Include calculations that have been used to demonstrate compliance to performance and regulatory criteria provided, and to determine design solutions.
2. Include required product data and shop drawings.
3. Include signature and seal of design professional responsible for allocated design services on calculations and drawings.
D. Test Reports: After each test/inspection, promptly submit two copies of report to Owner Project
Manager and to Contractor.
E. Certificates: When specified in individual specification sections, submit certification by the manufacturer and Contractor or installation/application subcontractor to Owner Project Manager, in quantities specified for Product Data.
1. Indicate material or product complies with or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
F. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the Owner's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
G. Manufacturer's Field Reports: Submit reports for Owner Project Manager's benefit as contract administrator or for Owner.
1. Submit for information for the limited purpose of assessing compliance with information given and the design concept expressed in the Contract Documents.
H. Erection Drawings: Submit drawings for Owner Project Manager's benefit as contract administrator or for Owner.
1. Submit for information for the limited purpose of assessing compliance with information given and the design concept expressed in the Contract Documents.
1.08 QUALITY ASSURANCE
A. Designer Qualifications: Where professional engineering design services and design data submittals are specifically required of Contractor by Contract Documents, provide services of a
BG-2L21(004)--80-75
Page
01 40 00 Quality Requirements
Professional Engineer experienced in design of this type of work and licensed in the State in which the Project is located.
1.09 REFERENCES AND STANDARDS
A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.
C. Obtain copies of standards where required by product specification sections.
D. Maintain copy at project site during submittals, planning, and progress of the specific work, until
Substantial Completion.
E. Should specified reference standards conflict with Contract Documents, request clarification from Owner Project Manager before proceeding.
F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Owner Project Manager shall be altered from Contract Documents by mention or inference otherwise in any reference document.
1.10 TESTING AND INSPECTION AGENCIES AND SERVICES
A. Owner will employ and pay for services of an independent testing agency to perform specified testing and inspection.
B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
PART 3 EXECUTION
2.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from
Owner Project Manager before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
2.02 MOCK-UPS
A. Before installing portions of the Work where mock-ups are required, construct mock-ups in location and size indicated for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work. The purpose of mock-up is to demonstrate the proposed range of aesthetic effects and workmanship.
B. Accepted mock-ups establish the standard of quality the Owner Project Manager will use to judge the Work.
C. Integrated Exterior Mock-ups: Construct integrated exterior mock-up as indicated on drawings.
Coordinate installation of exterior envelope materials and products as required in individual
BG-2L21(004)--80-75
Page
01 40 00 Quality Requirements
Specification Sections. Provide adequate supporting structure for mock-up materials as necessary.
2.03 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with
Contract Documents, request clarification from Owner Project Manager before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
2.04 TESTING AND INSPECTION
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with Owner Project Manager and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Owner Project Manager and Contractor of observed irregularities or non-compliance of Work or products.
5. Perform additional tests and inspections required by Owner Project Manager.
6. Submit reports of all tests/inspections specified.
B. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract
Documents.
2. Agency may not approve or accept any portion of the Work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the Work.
C. Contractor Responsibilities:
1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.
3. Provide incidental labor and facilities:
a. To provide access to Work to be tested/inspected.
b. To obtain and handle samples at the site or at source of Products to be tested/inspected.
c. To facilitate tests/inspections.
d. To provide storage and curing of test samples.
4. Notify Owner Project Manager and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.
5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
6. Arrange with Owner's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
D. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by Owner Project Manager.
E. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.
2.05 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of
BG-2L21(004)--80-75
Page
01 40 00 Quality Requirements surfaces and installation, quality of workmanship, start-up of equipment, test, adjust, and balance equipment, and ________ as applicable, and to initiate instructions when necessary.
B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
2.06 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
BG-2L21(004)--80-75
Page
01 50 00 Temporary Facilities and
Controls
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Dewatering B. Temporary utilities.
C. Temporary telecommunications services.
D. Temporary sanitary facilities.
E. Waste removal facilities and services.
F. Field offices.
1.02 RELATED REQUIREMENTS
1.03 DEWATERING
A. Provide temporary means and methods for dewatering all temporary facilities and controls.
1.04 TEMPORARY UTILITIES
A. Provide and pay for all electrical power, lighting, water, heating and cooling, and ventilation required for construction purposes.
B. New permanent facilities may be used. Reference plans for when permanent utilities will be available to the site. Offsite water and sanitary to be completed summer/fall 2022.
C. Use trigger-operated nozzles for water hoses, to avoid waste of water.
1.05 TELECOMMUNICATIONS SERVICES
A. Provide equivalent equipment and connections for Owner's field office.
B. Telecommunications services shall include:
1. Internet Connections: Minimum of one; DSL modem or faster.
2. Email: Account/address reserved for project use.
1.06 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.
B. New permanent facilities may be used during construction operations.
C. Maintain daily in clean and sanitary condition.
D. At end of construction, return facilities to same or better condition as originally found.
1.07 SECURITY
A. Provide security and facilities to protect Work, existing facilities, and Owner's operations from unauthorized entry, vandalism, or theft.
1.08 WASTE REMOVAL
A. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.
B. Provide containers with lids. Remove trash from site periodically.
C. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction.
D. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.
BG-2L21(004)--80-75
Page
01 50 00 Temporary Facilities and
Controls
1.09 FIELD OFFICES
A. Office: Weathertight, with lighting, electrical outlets, heating, cooling equipment, and equipped with sturdy furniture, drawing rack, and drawing display table.
B. Provide space for Project meetings, with table and chairs to accommodate 8-10 persons.
C. Locate offices a minimum distance of 30 feet from existing and new structures.
1.10 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior to Date of Substantial
Completion inspection.
B. Remove underground installations to a minimum depth of 2 feet. Grade site as indicated.
C. Clean and repair damage caused by installation or use of temporary work.
D. Restore new permanent facilities used during construction to specified condition.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
BG-2L21(004)--80-75
Page
01 60 00 Product Requirements
SECTION 01 60 00
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General product requirements.
B. Sustainable design-related product requirements.
C. Transportation, handling, storage and protection.
D. Product option requirements.
E. Substitution limitations and procedures.
F. Procedures for Iowa Department of Transportation-supplied products.
G. Maintenance materials, including extra materials, spare parts, tools, and software.
1.02 RELATED REQUIREMENTS
A. Document 00 2113 - Instructions to Bidders: Product options and substitution procedures prior to bid date.
B. Section 01 10 00 - Summary: Lists of products to be removed from existing building.
1. Section 01 10 00 - Summary: Identification of Owner-supplied products.
Section 01 25 00 - Substitution Procedures: Substitutions made during procurement and/or construction phases.
C. Section 01 40 00 - Quality Requirements: Product quality monitoring.
Section 01 61 16 - Volatile Organic Compound (VOC) Content Restrictions:
Requirements for VOC-restricted product categories.
D. Section 01 74 19 - Construction Waste Management and Disposal: Waste disposal requirements potentially affecting product selection, packaging and substitutions.
E. Section 22 05 13 - Common Motor Requirements for Plumbing Equipment: Motors for plumbing equipment.
F. Section 23 05 13 - Common Motor Requirements for HVAC Equipment: Motors for HVAC equipment.
1.03 REFERENCE STANDARDS
A. 16 CFR 260.13 - Guides for the Use of Environmental Marketing Claims; Federal Trade
Commission; Recycled Content; Currnent Edition.
B. NEMA MG 1 - Motors and Generators; 2014.
C. GreenSeal GS-36 - Commercial Adhesives; Green Seal, Inc.; 2000.
D. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
1.04 SUBMITTALS
A. Proposed Products List: Submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.
1. Submit within 15 days after date of Agreement.
2. For products specified only by reference standards, list applicable reference standards.
B. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
BG-2L21(004)--80-75
Page
01 60 00 Product Requirements
C. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.
PART 2 PRODUCTS
2.01 NEW PRODUCTS
A. Provide new products unless specifically required or permitted by Contract Documents.
B. See Section 01 40 00 - Quality Requirements, for additional source quality control requirements.
C. DO NOT Use products having any of the following characteristics:
1. Made using or containing CFC's or HCFC's.
2. Made of wood from newly cut old growth timber.
D. Where other criteria are met, Contractor shall give preference to products that:
If used on interior, have lower emissions, as defined in Section 01 61 16.
If wet-applied, have lower VOC content, as defined in Section 01 61 16.
1. Are extracted, harvested, and/or manufactured closer to the location of the project.
2. Have longer documented life span under normal use.
3. Result in less construction waste. See Section 01 74 19
4. Are made of vegetable materials that are rapidly renewable.
E. Adhesives and Joint Sealants:
1. Definition: This provision applies to gunnable, trowelable, and liquid-applied adhesives, sealants, and sealant primers used anywhere on the interior of the building inside the weather barrier, including duct sealers.
2. Provide only products having lower volatile organic compound (VOC) content than required by South Coast Air Quality Management District Rule No. 1168.
a. Require each installer to certify compliance and submit product data showing product content.
3. Specific Product Categories: Comply with limitations specified elsewhere.
F. Aerosol Adhesives:
1. Provide only products having lower volatile organic compound (VOC) content than required by GreenSeal GS-36.
2. Specific Product Categories: Comply with limitations specified elsewhere.
G. Provide interchangeable components of the same manufacture for components being replaced.
H. Motors: Refer to Section 22 0513 - Common Motor Requirements for Plumbing Equipment, NEMA MG 1 Type. Specific motor type is specified in individual specification sections.
I. Motors: Refer to Section 23 0513 - Common Motor Requirments for HVAC Equipment, NEMA
MG 1 Type. Specific motor type is specified in individual specification sections.
J. Wiring Terminations: Provide terminal lugs to mach branch circuit conductor quantities, sizes, and materials indicated. Size terminal lugs to NFPA 70, include lugs for terminal box.
K. Cord and Plug: Provide minimum 6 foot cord and plug including grounding connector for connection to electric wiring system. Cord of longer length is specified in individual specification sections.
2.02 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.
BG-2L21(004)--80-75
Page
01 60 00 Product Requirements
B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:
Submit a request for substitution for any manufacturer not named.
2.03 MAINTENANCE MATERIALS
A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.
B. Deliver to Project site; obtain receipt prior to final payment.
PART 3 EXECUTION
3.01 SUBSTITUTION PROCEDURES
A. Instructions to Bidders specifies time restrictions for submitting requests for substitutions during the bidding period and the documents required. Comply with requirements specified in Section 00 2113.
B. Substitutions may be considered when a product becomes unavailable through no fault of the Contractor.
C. Document each request with complete data substantiating complianc of proposed substitution with Contract Documents.
D. A request for substitution constitutes a representation othat the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Will coordinate installation and make changes to other Work that may be required for the
Work to be complete with no additional cost to owner.
4. Waives claims for additional costs or time extension that may subsequently become apparent.
5. Will reimburse Owner and Architect/Engineer for review or redesign servies associated with re-approval by authorities.
E. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without seperate written request, or when acceptance will require revision to the Contract Documents.
F. Substitution Submittal Procedure (after contract award)
1. Submitt three copies of request for substitution for consideration. Limit each request to one proposed substitution.
2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. Burden of proof is on proposer.
3. Architect will notify Contractor in writing of decision to accept or reject request.
3.02 OWNER-SUPPLIED PRODUCTS
A. See Section 01 10 00 - Summary for identification of Iowa Department of Transportation-supplied products.
B. Iowa Department of Transportation's Responsibilities:
1. Arrange for and deliver Iowa Department of Transportation reviewed shop drawings, product data, and samples, to Contractor.
2. Arrange and pay for product delivery to site.
3. On delivery, inspect products jointly with Contractor.
4. Submit claims for transportation damage and replace damaged, defective, or deficient items.
5. Arrange for manufacturers' warranties, inspections, and service.
C. Contractor's Responsibilities:
BG-2L21(004)--80-75
Page
01 60 00 Product Requirements
1. Review Iowa Department of Transportation reviewed shop drawings, product data, and samples.
2. Receive and unload products at site; inspect for completeness or damage jointly with Iowa Department of Transportation.
3. Handle, store, install and finish products.
4. Repair or replace items damaged after receipt.
3.03 TRANSPORTATION AND HANDLING
A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.
B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.
C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.
D. Transport and handle products in accordance with manufacturer's instructions.
E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.
F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.
G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.
H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.04 STORAGE AND PROTECTION
A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. See Section 01 74 19.
B. Store and protect products in accordance with manufacturers' instructions.
C. Store with seals and labels intact and legible.
D. Store sensitive products in weathertight, climate-controlled enclosures in an environment favorable to product.
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. Provide bonded off-site storage and protection when site does not permit on-site storage or protection.
G. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.
H. Comply with manufacturer's warranty conditions, if any.
I. Do not store products directly on the ground.
J. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
K. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.
L. Prevent contact with material that may cause corrosion, discoloration, or staining.
M. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
BG-2L21(004)--80-75
Page
01 60 00 Product Requirements
N. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
BG-2L21(004)--80-75
Page
01 70 00 Execution and Closeout
Requirements
SECTION 01 70 00
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Pre-installation meetings.
C. Cutting and patching.
D. Surveying for laying out the work.
E. Cleaning and protection.
F. Starting of systems and equipment.
G. Demonstration and instruction of Iowa Department of Transportation personnel.
H. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.
I. General requirements for maintenance service.
1.02 RELATED REQUIREMENTS
A. Section 01 10 00 - Summary: Limitations on working in existing building; continued occupancy;
work sequence; identification of salvaged and relocated materials.
B. Section 01 30 00 - Administrative Requirements: Submittals procedures, Electronic document submittal service.
C. Section 01 40 00 - Quality Requirements: Testing and inspection procedures.
D. Section 01 74 19 - Construction Waste Management and Disposal: Additional procedures for trash/waste removal, recycling, salvage, and reuse.
E. Section 01 78 00 - Closeout Submittals: Project record documents, operation and maintenance data, warranties, and bonds.
F. Section 01 79 00 - Demonstration and Training: Demonstration of products and systems to be commissioned and where indicated in specific specification sections G. Section 07 84 00 - Firestopping.
1.03 REFERENCE STANDARDS
A. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations;
2013.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Survey work: Submit name, address, and telephone number of Surveyor before starting survey work.
1. On request, submit documentation verifying accuracy of survey work.
2. Submit a copy of site drawing signed by the Land Surveyor, that the elevations and locations of the work are in compliance with Contract Documents.
3. Submit surveys and survey logs for the project record.
C. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:
1. Structural integrity of any element of Project.
2. Integrity of weather exposed or moisture resistant element.
3. Efficiency, maintenance, or safety of any operational element.
4. Visual qualities of sight exposed elements.
5. Work of Iowa Department of Transportation or separate Contractor.
6. Include in request:
BG-2L21(004)--80-75
Page
01 70 00 Execution and Closeout
Requirements
a. Identification of Project.
b. Location and description of affected work.
c. Necessity for cutting or alteration.
d. Description of proposed work and products to be used.
e. Effect on work of Iowa Department of Transportation or separate Contractor.
f. Written permission of affected separate Contractor.
g. Date and time work will be executed.
D. Project Record Documents: Accurately record actual locations of capped and active utilities.
1.05 QUALIFICATIONS
A. For surveying work, employ a land surveyor registered in the State in which the Project is located and acceptable to Owner Project Manager. Submit evidence of surveyor's Errors and Omissions insurance coverage in the form of an Insurance Certificate. Employ only individual(s) trained and experienced in collecting and recording accurate data relevant to ongoing construction activities, B. For field engineering, employ a professional engineer of the discipline required for specific service on Project, licensed in the State in which the Project is located. Employ only individual(s) trained and experienced in establishing and maintaining horizontal and vertical control points necessary for laying out construction work on project of similar size, scope and/or complexity.
1.06 PROJECT CONDITIONS
A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.
B. Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion.
C. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.
D. Dust Control: Execute work by methods to minimize raising dust from construction operations.
Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property.
1. Provide dust-proof enclosures to prevent entry of dust generated outdoors.
2. Provide dust-proof barriers between construction areas and areas continuing to be occupied by Iowa Department of Transportation.
E. Erosion and Sediment Control: Plan and execute work by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.
1. Minimize amount of bare soil exposed at one time.
2. Provide temporary measures such as berms, dikes, and drains, to prevent water flow.
F. Pest and Rodent Control: Provide methods, means, and facilities to prevent pests and insects from damaging the work.
G. Rodent Control: Provide methods, means, and facilities to prevent rodents from accessing or invading premises.
H. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations.
1.07 COORDINATION
A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions…