Plans - Le Mars Maintenance Garage Sealant Repair_Sheet A7_9-22-25.pdf

PDF 214 KB Posted

Attached to
Sealant Replacement at Le Mars Maintenance Garage
Solicitation number
645-RFQ-2219-2026
Issued by
Warren County, Iowa

About this file

This is an architectural plan document prepared by Ota Architectural Services for the Iowa Department of Transportation (Iowa DOT) related to sealant replacement work at the Le Mars Maintenance Garage in Warren County, Iowa. The document is Sheet A-7 dated September 22, 2025, and provides detailed specifications for the removal of existing sealant and backer rod from control, panel, and expansion joints at the facility, with replacement using new backer rod and sealant materials as specified in project documentation. The plan includes four elevation drawings (East, North, South, and West) at a scale of 1/8" = 1'-0", showing the First Floor at 0'-0" and Parapet at 24'-0" for each side of the building. The solicitation for this work, RFQ 645-RFQ-2219-2026, was open from October 13, 2025, at 8:00 AM CDT through October 27, 2025, at 1:00 PM CDT, with a project completion target of June 30, 2026.

Evaluation of bids will be based on cost, compliance with mandatory requirements, proposed staffing, and work performance history. Prospective bidders must be registered with the Division of Labor in the Iowa Department of Workforce Development and may be required to provide performance and payment bonds if the contract value reaches or exceeds $25,000. The Iowa DOT is a tax-exempt agency and Davis-Bacon wages do not apply to this project. Bidders must demonstrate appropriate insurance coverage and contractual capabilities, with payment terms offered on a Net 60 basis. A site visit was strongly recommended and could be scheduled by contacting Julie Brown. No specific budget range was stated in available documentation, requiring bidders to submit competitive pricing for the sealant replacement work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

First Floor 0' - 0"

Parapet 24' - 0"

First Floor 0' - 0"

Parapet 24' - 0"

First Floor 0' - 0"

Parapet 24' - 0"

REMOVE EXISTING SEALANT AND BACKER ROD

AND REPLACE WITH NEW BACKER ROD AND

SEALANT AS SPECIFIED (TYP AT ALL CONTROL,

PANEL, AND EXPANSION JOINTS)

First Floor 0' - 0"

Parapet 24' - 0"

SCALE

PROJECT NUMBER

DATE

DRAWN BY

APPROVED

ID

O

T A

R C

H

IT

E C

T U

R A

L S

E R

V

IC

E S

L

IN

C O

LN

W

A Y

A M

E S

IO

W A

(5

9-

1/8" = 1'-0"

/2

2/

:2

:5

A M

A-7

BG-752L21-(004)

Checker

Author

9/19/2025

L in co ln S t.

N

.E

L e

M ar s, I

A

1/8" = 1'-0" 1 East

1/8" = 1'-0" 2 North

1/8" = 1'-0" 3 South

1/8" = 1'-0" 4 West

NO. DATE

File details come from the government source that posted it. Updated .