This document is a detailed technical specification for site clearing and earth moving work for the Hill AFB Burger King Image Update project. The specifications cover comprehensive requirements for site preparation, including excavation, grading, soil management, and landscaping preparation. Key technical requirements include:
Site preparation involves removing existing vegetation, excavating to specified depths, managing soil materials, and preparing subgrades for pavements and structures. The specifications outline precise compaction requirements, with different density standards for various areas like building foundations (95% compaction), walkways, and unpaved areas (85% compaction). Soil management is detailed, specifying acceptable soil types, moisture content, and placement techniques. The document also includes requirements for drainage, crushed gravel base installation, utility trench backfilling, and final grading to ensure proper surface drainage and site preparation for subsequent construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications 3 of 3.pdf | ||
| Agreement.pdf | ||
| Drawings.pdf | ||
| Proposal Package.pdf | ||
| Specifications 1 of 3.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 09 51 13
ACOUSTICAL PANEL CEILINGS
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes acoustical panels and exposed suspension systems for ceilings.
B. Related Sections include the following:
1. Division 7 Section "Joint Sealants" for acoustical sealants.
1.2 DEFINITIONS
A. AC: Articulation Class.
B. CAC: Ceiling Attenuation Class.
C. LR: Light Reflectance coefficient.
D. NRC: Noise Reduction Coefficient.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Samples for Verification: For each component indicated and for each exposed finish required, prepared on Samples of size indicated below.
1. Acoustical Panel: Set of 6-inch- (150-mm-) square Samples of each type, color, pattern, and texture.
C. Maintenance Data: For finishes to include in maintenance manuals.
1.4 QUALITY ASSURANCE
A. Source Limitations:
1. Acoustical Ceiling Panel: Obtain each type through one source from a single manufacturer.
2. Suspension System: Obtain each type through one source from a single manufacturer.
B. Seismic Standard: Provide acoustical panel ceilings designed and installed to withstand the effects of earthquake motions according to the following:
1. Standard for Ceiling Suspension Systems Requiring Seismic Restraint:
Comply with ASTM E 580.
2. UBC Standard 25-2, "Metal Suspension Systems for Acoustical Tile and for Lay-in Panel Ceilings."
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver acoustical panels, suspension system components, and accessories to Project site in original, unopened packages and store them in a fully enclosed, conditioned space where they will be protected against damage from moisture, humidity, temperature extremes, direct sunlight, surface contamination, and other causes.
B. Before installing acoustical panels, permit them to reach room temperature and a stabilized moisture content.
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
C. Handle acoustical panels carefully to avoid chipping edges or damaging units in any way.
1.6 PROJECT CONDITIONS
A. Environmental Limitations: Do not install acoustical panel ceilings until spaces are enclosed and weatherproof, wet work in spaces is complete and dry, work above ceilings is complete, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use.
1.7 COORDINATION
A. Coordinate layout and installation of acoustical panels and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire-suppression system, and partition assemblies.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply for product selection:
1. Products: Subject to compliance with requirements, provide one of the products specified.
2.2 ACOUSTICAL PANELS, GENERAL
A. Acoustical Panel Standard: Provide manufacturer's standard panels of configuration indicated that comply with ASTM E 1264 classifications as designated by types, patterns, acoustical ratings, and light reflectances, unless otherwise indicated.
1. Mounting Method for Measuring NRC: Type E-400; plenum mounting in which face of test specimen is 15-3/4 inches (400 mm) away from test surface per ASTM E 795.
2.3 WATER-FELTED, MINERAL-BASE ACOUSTICAL PANELS FOR ACOUSTICAL PANEL
CEILING
A. Products: USG Interiors – Refer to drawings.
B. Classification: Class A.
C. Color: Per Drawings.
D. LR: .81.
E. NRC: .55.
F. CAC: 35
G. Edge Detail: Square.
H. Thickness: 5/8”
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
I. Size: 2’ x 4’.
J. Location/Finish: See Finishes Legend and Finish Schedule on individual drawing sheets.
2.4 WATER-FELTED, MINERAL-BASE ACOUSTICAL PANELS, VINYL LAMINATED FACE
WITH SEALED BACK AND EDGES FOR ACOUSTICAL PANEL CEILING
A. Products: USG Interiors Clean Room Climaplus
B. Color: White.
C. LR: .79.
D. NRC: 0.
E. CAC: 35.
F. Edge Detail: Square.
G. Thickness: 5/8”.
H. Size: 2’ x 4’.
I. Location: See Finishes Legend and Finish Schedule on individual drawing sheets for location
2.5 METAL SUSPENSION SYSTEMS, GENERAL
A. Metal Suspension System Standard: Provide manufacturer's standard direct-hung metal suspension systems of types, structural classifications, and finishes indicated that comply with applicable requirements in ASTM C 635.
B. Finishes and Colors, General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. Provide manufacturer's standard factory-applied finish for type of system indicated.
C. Attachment Devices: Size for five times the design load indicated in ASTM C 635, Table 1, "Direct Hung," unless otherwise indicated.
D. Wire Hangers, Braces, and Ties: Provide wires complying with the following requirements:
1. Zinc-Coated Carbon-Steel Wire: ASTM A 641/A 641M, Class 1 zinc coating, soft temper.
2. Size: Select wire diameter so its stress at three times hanger design load (ASTM C 635, Table 1, "Direct Hung") will be less than yield stress of wire, but provide not less than 0.106-inch- (2.69-mm-) diameter wire.
E. Seismic Struts: Manufacturer's standard compression struts designed to accommodate seismic forces.
F. Seismic Clips: Manufacturer's standard seismic clips designed and spaced to secure acoustical panels in-place.
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
G. Impact Clips: Where indicated, provide manufacturer's standard impact-clip system designed to absorb impact forces against acoustical panels.
2.6 METAL SUSPENSION SYSTEM FOR ACOUSTICAL PANEL CEILING
A. Manufacturers:
1. Armstrong World Industries, Inc.
2. Celotex Corporation
3. Chicago Metallic Corp.
4. USG Interiors, Inc.
B. Steel Suspension Systems:
1. USG DONN-DX Grid 15/16”.
C. Aluminum Suspension Systems:
1. USG DONN-DXLA 15/16”.
2.7 METAL EDGE MOLDINGS AND TRIM
A. Manufacturers:
1. Armstrong World Industries, Inc.
2. Celotex Corporation; Architectural Ceilings Marketing Dept.
3. Chicago Metallic Corporation.
4. USG Interiors, Inc.
B. Roll-Formed Sheet-Metal Edge Moldings and Trim: Type and profile indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations that fit acoustical panel edge details and suspension systems indicated; formed from sheet metal of same material, finish, and color as that used for exposed flanges of suspension system runners.
1. For lay-in panels with reveal edge details, provide stepped edge molding that forms reveal of same depth and width as that formed between edge of panel and flange at exposed suspension member.
2. For circular penetrations of ceiling, provide edge moldings fabricated to diameter required to fit penetration exactly.
2.8 ACOUSTICAL SEALANT
A. Products: See Section 07 92 00.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, including structural framing to which acoustical panel ceilings attach or abut, with Installer present, for compliance with requirements specified in this and other Sections that affect ceiling installation and anchorage and with requirements for installation tolerances and other conditions affecting performance of acoustical panel ceilings.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
A. Measure each ceiling area and establish layout of acoustical panels to balance border widths at opposite edges of each ceiling. Avoid using less-than-half-width panels at borders, and comply with layout shown on reflected ceiling plans.
3.3 INSTALLATION, GENERAL
A. General: Install acoustical panel ceilings to comply with UBC Standard 25-2 and seismic requirements indicated, per manufacturer's written instructions and CISCA's "Ceiling Systems Handbook."
B. Suspend ceiling hangers from building's structural members and as follows:
1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structure or of ceiling suspension system.
2. Splay hangers only where required to miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means.
3. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with location of hangers at spacings required to support standard suspension system members, install supplemental suspension members and hangers in form of trapezes or equivalent devices. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced standards and publications.
4. Secure wire hangers to ceiling suspension members and to supports above with a minimum of three tight turns. Connect hangers directly either to structures or to inserts, eye screws, or other devices that are secure and appropriate for substrate and that will not deteriorate or otherwise fail due to age, corrosion, or elevated temperatures.
5. Do not attach hangers to steel deck tabs.
6. Do not attach hangers to steel roof deck. Attach hangers to structural members.
7. Space hangers not more than 48 inches (1200 mm) o.c. along each member supported directly from hangers, unless otherwise indicated;
provide hangers not more than 8 inches (200 mm) from ends of each member.
C. Install edge moldings and trim of type indicated at perimeter of acoustical ceiling area and where necessary to conceal edges of acoustical panels.
1. Apply acoustical sealant in a continuous ribbon concealed on back of vertical legs of moldings before they are installed.
2. Screw attach moldings to substrate at intervals not more than 16 inches
(400 mm) o.c. and not more than 3 inches (75 mm) from ends, leveling with ceiling suspension system to a tolerance of 1/8 inch in 12 feet (3.2 mm in 3.66 m). Miter corners accurately and connect securely.
3. Do not use exposed fasteners, including pop rivets, on moldings and trim.
a. Pop rivets acceptable at 9/16” grid only. Painted to match grid.
D. Install suspension system runners so they are square and securely interlocked with one another. Remove and replace dented, bent, or kinked members.
E. Install acoustical panels with undamaged edges and fit accurately into suspension system runners and edge moldings. Scribe and cut panels at borders and penetrations to provide a neat, precise fit.
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
1. For square-edged panels, install panels with edges fully hidden from view by flanges of suspension system runners and moldings.
2. For reveal-edged panels on suspension system runners, install panels with bottom of reveal in firm contact with top surface of runner flanges.
3. Paint cut edges of panel remaining exposed after installation; match color of exposed panel surfaces using coating recommended in writing for this purpose by acoustical panel manufacturer.
3.4 CLEANING
A. Clean exposed surfaces of acoustical panel ceilings, including trim, edge moldings, and suspension system members. Comply with manufacturer's written instructions for cleaning and touchup of minor finish damage. Remove and replace ceiling components that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage.
END OF SECTION
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
THIS PAGE INTENTIONALLY LEFT BLANK
Section 09 90 00
PAINTING
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
PART 1 - PRODUCTS
1.1 SUMMARY
A. This Section includes surface preparation, painting and finishing of exposed inte-rior and exterior items and surfaces as defined in the Master Painters Institute (MPI) Architectural Painting Manual and the following:
1. Surface preparation, priming and finish coats specified in this Section are in addition to shop-priming and surface treatment specified under other Sections.
2. Special Preparation and repainting of existing surfaces.
B. Related Sections: The following Sections contain requirements that relate to this Section:
1. Division 7 Section "Sealants" for caulking of interior joints at or adjacent to surfaces to be painted.
2. Division 5 Section, "Metal Fabrications" for shop-priming ferrous metal.
3. Division 8 Section, "Steel Door and Frames" for shop-priming steel doors and frames.
C. Paint exposed surfaces whether or not colors are designed in schedules, except where a surface or material is specifically indicated not to be painted or is to re-main natural. Where an item or surface is not specifically mentioned, paint the same as similar adjacent materials or surfaces. If color or finish is not designat-ed, the Architect will select from standard colors or finishes available.
1. Painting includes field-painting exposed bare and covered pipes and ducts, hangers, exposed steel and iron work and primed metal surfaces of mechanical and electrical equipment.
2. In general, conduit, ducts, piping and like material exposed in a room or area scheduled to be painted shall be painted, same color as the adja-cent surface unless otherwise indicated.
3. Painting includes field natural finishing of wood doors.
4. Painting includes new and existing masonry as indicated o the drawings.
D. Painting is not required on prefinished items (except as noted), finished metal surfaces, concealed surfaces, operating parts and labels.
1. Prefinished items not to be painted include the following factory-finished components:
a. Acoustic materials.
b. Plastic laminated architectural casework.
c. Finished mechanical and electrical equipment.
d. Light fixtures.
e. Switchgear.
f. Distribution cabinets.
g. Prefinished toilet compartments.
2. Concealed surfaces not to be painted include wall or ceiling surfaces in inaccessible areas.
3. Finished metal surfaces not to be painted include:
a. Anodized aluminum
b. Stainless steel and Chromium plate.
c. Copper, bronze and brass
4. Operating parts not to be painted include moving parts of operating equipment such as the following:
a. Valve and damper operators
b. Linkages
c. Sensing devices
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
d. Motor and fan shafts
5. Labels: Do not paint over Underwriters Laboratories, Factory Mutual or other code-required labels or equipment name, identification, perfor-mance rating or nomenclature plates.
1.2 SUBMITTALS
A. General: Submit the following in accordance with Conditions of the Contract and Division 1 Specification Sections.
B. Product data for each paint system specified, including block fillers and primers.
1. Provide the manufacturer's technical information including label analysis and instructions for handling, storage and application of each material proposed for use.
2. List each material and cross-reference the specific coating, finish system and application. Identify each material by the manufacturer's catalog number and general classification.
3. Submit Material Safety Data Sheets to Owner's Representative at least two weeks before material is delivered to the site.
C. Samples for Verification Purposes: Provide samples of each color and material to be applied, with texture to simulate actual conditions on representative sam-ples of the actual substrate.
1. Provide stepped samples, defining each separate coat, including block fillers and primers. Use representative colors when preparing samples for review. Resubmit until required sheen, color and texture are achieved.
2. Provide a list of material and application for each coat of each sample.
Label each sample as to location and application.
3. Submit samples on the following substrates for the Architect's review of color and texture only.
a. Gypsum Board: Submit two 8-inch-square samples for each color and finish.
b. Painted Wood: Submit two 12-inch square samples of each col-or and material on hardboard.
c. Natural Finish Wood: Submit two 12-inch-square samples of each color and material on wood of species indicated for finish.
d. Ferrous Metal: Submit two 4-inch-square samples of flat metal and two 8-inch-long samples of solid metal for each color and finish.
1.3 QUALITY ASSURANCE
A. Applicator Qualifications: Engage an experienced applicator who has completed painting system applications similar in material and extent to those indicated for the Project that have resulted in a construction record of successful in-service performance.
B. Single-Source Responsibility: Provide primers and other undercoat paint pro-duced by same manufacturer as finish coats. Use only thinners approved by paint manufacturer, and use only within recommended limits.
C. Coordination of Work: Review other sections of these specifications in which prime paints are to be provided to ensure compatibility of total coatings system for various substrates. Upon request from other trades, furnish information or
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050 characteristics of finish materials provided for use, to ensure compatible prime coats are used.
D. Paint Grade: ‘Premium’ as defined by the MPI.
E. Employ only qualified journeymen in this painting and decorating work; appren-tices may be employed on the project to work under the direction of qualified journeymen.
F. Conform to the standards contained in the Master Painters Institute Architectural
Painting Specification Manual, latest edition (hereafter referred to as MPI Paint-ing Specification Manual) for all painting products including preparation and ap-plication of materials. MPI Painting Specification Manual as issued by the local MPI Accredited Quality assurance Association having jurisdiction.
G. All paint manufacturers and products used shall be as listed under the “Approved
Products” section of the MPI Architectural Painting Specification Manual.
1.4 BENCHMARK SAMPLES (MOCK-UPS)
A. Provide a full-coat benchmark finish sample for each interior and exterior coating and color required. Comply with procedures specified in PDCA P5. Duplicate finish of approved sample Submittals.
1. Architect will select one surface to represent surfaces and conditions for application of each type of coating and color.
a. Wall Surfaces: Provide samples on at least 100 sq. ft. of each new and existing wall.
2. Apply benchmark samples, according to requirements for the completed
Work. Provide required sheen, color and texture on each surface.
a. After finishes are accepted, Architect will use the surface to evaluate coating systems of a similar nature.
3. Final approval of colors will be from benchmark samples.
1.5 DELIVERY, STORAGE AND HANDLING
A. Deliver materials to the job site in the manufacturer's original, unopened pack-aged and containers bearing manufacturer's name and label, and the following information:
1. Product name or title of material.
2. Product description (generic classification or binder type)
3. Manufacturer's stock number and date of manufacture.
4. Contents by volume, for pigment and vehicle constituents.
5. Thinning instructions.
6. Application instructions.
7. Color name and number.
B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain containers used in storage in a clean condition, free of foreign materials and residue.
1. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing and application.
1.6 JOB CONDITIONS
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50 deg F (10 deg C) and 90 deg F (32 deg C).
B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperature are between 45 deg F (7 deg C) and 95 deg F (35 deg C).
C. Do not apply paint in snow, rain, fog or mist; or when the relative humidity ex-ceeds 85 percent; or at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces.
1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by the manufacturer during application and drying periods.
D. Do not proceed with any work under this Section unless a lighting level of a min-imum of 15 candlepower per square foot is provided on the surfaces to be fin-ished.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. All materials (primers, paints, coatings, varnishes, stains, lacquers, fillers, thin-ners, solvents, etc.) shall be in accordance with the MPI Architectural Painting Specification Manual “Approved Product” listing and shall be from a single manu-facturer for each system used.
B. Other paint materials such as linseed oil, shellac, etc. shall be the highest quality product of an approved manufacturer listed in the MPI Architectural Painting Specification Manual and shall be compatible with other coating materials as re-quired.
C. All materials and paints shall be lead and mercury free and shall have low VOC content where possible.
D. Manufacturer: Provide products according to the manufacturer and product iden-tification listed in the paint schedules below. Subject to conformance with re-quirements and properties of the products listed, products of the following manu-facturers will be considered.
1. Benjamin Moore & Co. (Moore)
2. Columbia Paint Co. (Columbia)
3. Fuller (Fuller)
4. Parker Paint Mfg. Company (Parker)
5. PPG Industries, Pittsburgh Paints (PPG)
6. Rodda Paint Co. (Rodda)
7. The Sherwin-Williams Company (S-W)
2.2 PAINT MATERIALS, GENERAL
A. Material Compatibility: Provide block fillers, primers, finish coat materials and re-lated materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by the manufactur-er based on testing and field experience.
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
B. Material Quality: Provide the manufacturer's product as specified. Paint material containers not displaying manufacturer's product identification shall not be brought to the job site.
C. Paints shall comply with Green Seal Standard GS-11 points.
D. Chemical Components of Field-Applied Interior Paints and Coatings: Provide products that comply with the following limits for VOC content, exclusive of color-ants added to a tint base, when calculated according to 40 CFR 59, Subpart D (EPA Method 24) and the following chemical restrictions; these requirements do not apply to primers or finishes that are applied in a fabrication or finishing shop:
1. Flat Paints and Coatings: VOC not more than 50 g/L.
2. Non-Flat Paints and Coatings: VOC not more than 150 g/L.
3. Anti-Corrosive Coatings: VOC not more than 250 g/L.
4. Varnishes and Sanding Sealers: VOC not more than 350 g/L.
5. Stains: VOC not more than 250 g/L.
6. Aromatic Compounds: Paints and coatings shall not contain more than
1.0 percent by weight total aromatic compounds (hydrocarbon com-pounds containing one or more benzene rings).
7. Restricted Components: Paints and coatings shall not contain any of the following:
a. Acrolein.
b. Acrylonitrile.
c. Antimony.
d. Benzene.
e. Butyl benzyl phthalate.
f. Cadmium.
g. Di (2-ethylhexyl) phthalate.
h. Di-n-butyl phthalate.
i. Di-n-octyl phthalate.
j. 1, 2-dicholorbenzene.
k. Diethyl phthalate.
l. Dimethyl phthalate.
m. Ethylbenzene.
n. Formaldehyde.
2.3 COLOR SCHEDULE
A. Where colors are identified by product names and numbers, provide perfect color match to the listed colors. See "P" numbers in the Finishes Legend and Finish Schedule and the finish chart on the exterior elevation drawing.
2.4 GLOSS
A. MPI Gloss and Sheet Standards are now as follows:Gloss @ 60 Sheen @ 85
1. Gloss Level 1: A traditional matte finish – flatMax. 5 units Max. 10 units
2. Gloss Level 2: A high side sheen flat – ‘a velvet-like’ finish Max. 10 units
10 – 35 units
3. Gloss Level 3: A traditional ‘eggshell-like’ finish10 – 25 units 10 – 35 units
4. Gloss Level 4: A ‘satin-like’ finish 20 – 35 units Min. 35 units
5. Gloss Level 5: A traditional semi-gloss 35 – 70 units
6. Gloss Level 6: A traditional gloss 70 – 85 units
7. Gloss Level 7: A high gloss More than 85 units
2.5 PAINT SCHEDULE
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
A. Interior Surfaces: Paint interior surfaces in accordance with the following MPI Architectural Painting Specification Manual requirements:
1. Concrete Horizontal Surfaces: Exposed floors.
a. INT.3.2G: Concrete Floor Sealer (water-based).
2. Metal Fabrications: For steel exposed to view.
a. INT 5.1B: High performance acrylic (Gloss Level 5) finish.
3. Galvanized Metal: Doors, frames, miscellaneous steel, pipes, ducts, etc.
a. INT 5.3B: High performance acrylic (Gloss Level 5) finish.
4. Dressed Lumber: Including trim, casings, etc.
a. INT 6.3A: Latex (Gloss Level 3) finish.
5. Gypsum Board: Gypsum wallboard, drywall, “sheet rock type material,” etc.
a. INT 9.2B: High performance acrylic (Gloss Level 3, except in
Toilet Rooms, Custodial Rooms, IDF Rooms, Tech. Closets and Electrical Room where Level 5 is required. Gloss Level 2 at ceil-ings except for Gloss Level 5 where Gloss Level 5 is required on walls) finish.
6. Concrete Masonry Units:
a. Int 4.2.D: High Performance Architectural Latex; (gloss level 3) finish.
B. Exterior Surfaces: Paint exterior surfaces in accordance with the following MPI Architectural Painting Specification Manual requirements:
1. Existing Metal Awning: For steel exposed to view.
a. Sherwin Williams, Macropoxy 646-100 (Fast Cure Epoxy), Color as specified on drawings.
2. New or Existing masonry: PPG or Sherwin Williams per the Finish Schedule and drawings.
3. New or Existing Exterior Building: PPG or Sherwin Williams per the Fin-ish Schedule and drawings.
A. Examine substrates and conditions under which painting will be performed for compliance with paint application requirements. Surfaces receiving paint must be thoroughly dry before paint is applied.
1. Do not begin to apply paint until unsatisfactory conditions have been cor-rected.
2. Start of painting will be construed as the Applicator's acceptance of sur-faces and conditions within a particular area.
3.2 PREPARATION
A. General: Remove hardware and hardware accessories, plates, machined sur-faces, lighting fixtures and similar items already installed that are not to be paint-ed, or provide surface-applied protection prior to surface preparation and paint-ing. Remove these items, if necessary, to completely paint the items and adja-cent surfaces. Following completion of painting operations in each space or ar-ea, have items reinstalled by workers skilled in the trades involved.
B. Cleaning: Before applying paint or other surface treatment, clean the substrates of substances that could impair the bond of the various coatings. Remove oil and grease prior to cleaning. Schedule cleaning and painting so dust and other
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050 contaminants from the cleaning process will not fall on wet, newly painted sur-faces.
C. Surface Preparation: Clean and prepare surfaces to be painted according to the manufacturer's instructions for each particular substrate condition and as speci-fied.
1. Provide barrier coats over incompatible primers or remove and reprime.
Notify Architect in writing about anticipated problems using the specified finish-coat material with substrates primed by others.
2. Wood: Clean surfaces of dirt, oil and other foreign substances with scrapers, mineral spirits and sandpaper as required. Sand surfaces ex-posed to view smooth and dust off.
a. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in fin-ish surfaces with putty or plastic wood filler. Sand smooth when dried.
b. Prime, stain or seal wood to be painted immediately upon deliv-ery. Prime edges, ends, faces, undersides and backsides of wood including cabinets, trim, counters, cases and paneling.
c. When transparent finish is required, backprime with spar varnish.
d. Backprime paneling on interior partitions where masonry, plaster or other wet wall construction occurs on backside.
e. Seal tops, bottoms and cutouts of primed or unprimed wood doors with a heavy coat of varnish, primer or sealer immediately upon delivery.
3. Ferrous Metals: Clean ungalvanized ferrous metal surfaces that have not been shop-coated; remove oil, grease, dirt, loose mill scale, and oth-er foreign substances. Use solvent or mechanical cleaning methods that comply with recommendations of the Steel Structures Painting Council
(SSPC).
a. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by the paint manufacturer, and touch up with the same primer as the shop coat.
4. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so that the surface is free of oil and surface contami-nants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.
5. Cementitious Materials: Prepare concrete, cement plaster and rein-forced concrete panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve cur-ing, use mechanical methods of surface preparation.
a. Use abrasive blast-cleaning methods if recommended by the coating manufacturer.
b. Determine alkalinity and moisture content of surfaces by per-forming appropriate tests. If surfaces are sufficiently alkaline to cause the finish coating to blister and burn, correct this condition before coating application. Do not paint surfaces where moisture content exceeds that permitted in the manufacturer's printed di-rections.
6. Masonry Substrates:
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
a. Remove efflorescence and chalk. Do not paint surfaces if mois-ture content or alkalinity of surfaces or mortar joints exceeds that permitted in manufacturer's written instructions.
b. Moisture content to be less than 12 percent.
3.3 ADDITIONAL REQUIREMENTS FOR EXISTING SURFACES SCHEDULED FOR
REPAINT
A. General: Reference is made to the MPI Architectural Painting Specification Manual for the terminology used to describe the existing conditions. This infor-mation is not intended to permit or encourage the Bidder/Contractor to forgo site visits and inspections to determine actual conditions before the Contract is awarded.
B. Existing Metal Awning: Refer to manufacturer’s recommendations for cleaning and surface preparation of existing metal surfaces.
C. New or Existing Masonry:
1. Manufacturer’s recommended Primer:
a. Prime Coat: Primer sealer, latex.
1) S-W Loxon Concrete & Masonry Primer Sealer, A24W8300, at 8.0 mils (0.203 mm) wet, 3.2 mils (0.081 mm) dry.
2) S-W A-100 Exterior Latex Satin, A89 Series, at 4.0 mils (0.102
mm) wet, 1.5 mils (0.038 mm) dry, per coat.
3)
3.4 MATERIALS PREPARATION
A. General: Carefully mix and prepare paint materials according to manufacturer's directions.
1. Maintain containers used in mixing and applying paint in a clean condi-tion, free of foreign materials or residue.
2. Stir material before application to produce a mixture of uniform density;
stir as required during application. Do not stir surface film into material.
Remove film and, if necessary, strain material before using.
3. Use only thinners approved by the paint manufacturer and only within recommended limits.
B. Tinting: Tint each undercoat a lighter shade to facilitate identification of each coat where multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat.
3.5 APPLICATION
A. General: Apply paint according to manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied.
B. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces or condi-tions detrimental to formation of a durable paint film.
1. Paint surface treatments and finishes are indicated in the schedules.
2. Provide finish coats that are compatible with primers used.
3. The number of coats and the film thickness required are the same re-gardless of the application method. Do not apply succeeding coats until the previous coats has cured as recommended by the manufacturer.
Sand between applications where sanding is required to produce a smooth even surface according to the manufacturer's directions.
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
4. Apply additional coats if undercoats, stains or other conditions show through final coat of paint until paint film is of uniform finish, color and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.
5. The term exposed surfaces includes areas visible when permanent or built-in fixtures, convector covers, covers for finned tube radiation, grilles and similar components are in place. Extend coating in these areas, as required, to maintain the system integrity and provide desired protection.
6. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before the final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only.
7. Paint interior surfaces of ducts, where visible through registers or grilles, with a flat, nonspecular black paint.
8. Paint back sides of access panels and removable or hinged covers to match exposed surfaces.
9. Omit primer on metal surfaces that have been shop-primed and touch-up painted.
10. Paint unfinished wood cleats, underside of casework, desk tops and similar items.
C. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pre-treated, or otherwise prepared for painting as soon as practicable after prepara-tion and before subsequent surface deterioration.
1. Allow sufficient time between successive coats to permit proper drying.
Do not recoat until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure and where application of another coat of paint does not cause the undercoat to lift or lose adhe-sion.
D. Application Procedures: Apply paints and coatings by brush, roller, spray or oth-er applicators according to the manufacturer's directions and requirements of the surface to be painted.
1. Brushes: Use brushes best suited for the material applied.
2. Rollers: Use rollers of carpet, velvet back or high-pile sheep's wool as recommended by the manufacturer for the material and texture required.
3. Spray Equipment: Use airless spray equipment with orifice size and rec-ommended by the manufacturer for the material and texture required.
E. Minimum Coating Thickness: Apply materials no thinner than the manufacturer's recommended spreading rate. Provide the total dry film thickness of not less than
4.0 mils for the entire system of prime and finish coats for three coat work, or 2.5 mils where two coat work is specified.
F. Prime Coats: Before applying finish coats, apply a prime coat of material, as recommended by the manufacturer, to material that is required to be painted or finished and that has not been prime-coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn-through or other defects due to in-sufficient sealing.
G. Stipple Enamel Finish: Roll and redistribute paint to an even and fine texture.
Leave no evidence of rolling such as laps, irregularity in texture, skid marks or other surface imperfections.
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001/Quorum Project No. 23050
H. Pigmented (Opaque) Finishes: Completely cover to provide a smooth, opaque surface of uniform finish, color, appearance and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness or other surface imperfections will not be acceptable.
I. Transparent (Clear) Finishes: Use multiple coats to produce a glass-smooth sur-face film of even luster. Provide a finish free of laps, cloudiness, color irregulari-ty, runs, brush marks, orange peel, nail holes or other surface imperfections.
1. Provide satin finish for final coats.
J. Completed Work: Match approved samples for color, texture and coverage.
Remove, refinish or repaint work not complying with specified requirements.
3.6 CLEANING
A. Cleanup: At the end of each work day, remove empty cans, rags, rubbish and other discarded paint materials from the site.
1. After completing painting, clean glass and paint-spattered surfaces.
Remove spattered paint by washing and scraping. Be careful not to scratch or damage adjacent finished surfaces.
3.7 PROTECTION
A. Protect work of other trades, whether being painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing and repainting as acceptable to the Architect.
B. Provide "Wet Paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others to protect their work after completing painting operations.
1. At completion of construction activities of other trades, touch up and re-store damaged or defaced painted surfaces.
Section 10 14 00
PLASTIC SIGNS
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001 / Quorum Project No. 23050
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this section.
1. The Contract Documents as defined in Section 01 10 13 – Summary of Work, apply to the
Work of this Section.
2. Section 01 25 00 – Substitution Request Form.
1.2 SCOPE
A. Furnish all material, labor and engineering services necessary to program facility and to fabricate and install signage.
1.3 REFERENCES
A. Signs and their installation shall comply with applicable provisions of the latest edition of the following standards and with requirements of authorities having jurisdiction:
1. ADAAG – Americans with Disabilities Act Accessibility Guidelines; US Architectural and
Transportation Barriers Compliance Board.
2. International Code Council/American National Standards Institute A117.1-Standard on Accessible and Usable Buildings Facilities.
3. 2012 Texas Accessibility Standards of the Architectural Business Act Article 9102 Texas Civil Statutes.
4. National Fire Protection Association 101 Life Safety Code.
1.4 SUBMITTALS
A. Signage schedule in manufacturer's format for verification of text/copy.
B. Approval drawings showing materials, construction detail, lay-out, copy, size and mounting methods.
C. Sample of two sign types for verification of materials, color, pattern, overall quality, and for adherence to drawings and requirements indicated.
1.5 QUALIFICATIONS
A. Manufacturer specializing in manufacturing the products specified in this section with minimum five years experience. Obtain signs from one source and a single manufacturer.
1.6 WARRANTY
A. Provide manufacturer’s warranty against defects in materials or workmanship for minimum 5 years.
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001 / Quorum Project No. 23050
PART 2 – PRODUCTS
2.1 MANUFACTURER
A. Signage shall be Fusion 04 as manufactured by Takeform Architectural Graphics, One Mahar Way, Medina, NY 14103, 1.800.528.1398 or Architect approved equal.
B. Substitutions: Section 01600.
2.2 SIGN STANDARDS
A. Typography
1. Type style: Refer to Drawings. Copy shall be a true, clean, accurate reproduction of typeface(s) specified. Upper and lower case or all caps as indicated in Sign Type drawings and Signage Schedule. Letter spacing to be normal and interline spacing shall be set by manufacturer.
2. Arrows, symbols and logo art: To be provided in style, sizes, colors and spacing to match existing.
3. Grade II Braille utilizing perfectly round, clear insertion beads.
B. Color and Finishes
1. Typography: Match Existing
2. Message Background: Confirm actual wording and spelling of each sign with architect during submittals.
3. Finishes are to meet current Federal ADA and any State requirements, including TDLR for Texas.
2.3 SIGNS
A. Architectural Signage System
1. The signage shall incorporate a decorative laminate face with applied graphics including all tactile requirements in adherence to TAS/ADA specifications.
2. All signs, including work station and room ID's, overheads and flag mounts, directionals and directories shall have a matching appearance and constructed utilizing the same manufacturing process to assure a consistent look throughout.
B. Materials
1. Sign face shall be 1/16" (nominal) standard grade, high pressure surface laminate. A painted sign face shall not be acceptable.
2. Tactile lettering shall be precision machined, raised 1/32", matte PETG and subsurface colored for scratch resistance.
3. Sign and backer edge shall be treated with a hot wax seal for moisture integrity.
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001 / Quorum Project No. 23050
C. Standard Colors
1. Face/background color – Submit standard offerings for review.
2. Standard tactile colors shall match manufacturer's ADA/TAS standard color selection.
D. Construction
1. The signage shall be capable of accepting paper or acetate inserts to allow changing and updating as required. Insert components shall have a 0.080” thickness non-glare acrylic window and shall be inlayed flush to sign face for a smooth, seamless appearance.
2. The signage shall, with the exception of directories and directionals, be a uniform 8½" width to facilitate inserts printed on standard width paper.
3. The signage contractor shall provide and install all signage inserts and provide software templates to Owner as part of close-out documents.
4. Manufacturer shall provide a template containing layout, font, color, artwork and trim lines to allow Owner to produce inserts on laser or ink jet printer. The template shall be in an Acrobat or Word format (.pdf).
5. The signage shall include modules allowing for inserts, notice holders, occupancy sliders, marker, magnetic, and cork pin boards. All modules shall be flush to sign face for a smooth, seamless appearance.
6. The laminates (front and back) shall be pressure laminated and precision machined together to a 90-degree angle. Edges shall be smooth, void of chips, burrs, sharp edges and marks.
7. The signage shall utilize an acrylic sphere for Grade II Braille inserted directly into a scratch resistant, high pressure laminate sign face. Braille dots are to be pressure fit in high tolerance drilled holes.
8. Braille dots shall meet 2012 TAS, Section 703.3.
9. The signage shall utilize a water based adhesive. The adhesive shall be nonhazardous and shall allow for flexing and deflection of the adhered components due to changes in temperature and moisture without bond failure.
10. All signs shall be provided with appropriate mounting hardware. Hardware shall be finished and architectural in appearance and suitable for the mounting surface.
PART 3 – EXECUTION
A. Verify that substrate surfaces are ready to receive work.
3.2 INSTALLATION
A. Install in accordance with manufacturer’s instructions. Installation shall be performed by manufacturer's personnel trained and certified in manufacturer's methods and procedures.
B. Install signs after doors and surfaces are finished, in locations scheduled.
C. Position sign 2 inches from latch side of door at 48" A.F.F. minimum to 60” A.F.F. maximum to
IMAGE UPGRADE: BURGER KING, HILL AFB, UT
EXCHANGE Project No: 4560-23-001 / Quorum Project No. 23050 lettering, in compliance with accessibility standards. Install all signage in accordance to 2012 TAS.
D. Locate sign on wall surface, level.
E. Installer to conduct a pre-installation survey prior to manufacturing to verify message schedule copy and sign location. Each location shall be noted using low tack vinyl. Full scale renderings of directions and directionals shall also be provided. Any location discrepancy or message issues shall be submitted to architect for review.
F. Signs shall be level, plumb, and at heights indicated with sign surfaces free from defects.
G. If any signs are placed on transparent surfaces such as a sidelight, provide a corresponding laminate back on the inside of the room with the same profile and size to conceal adhesive mounting strips.
H. Upon completion of the work, signage contractor shall remove unused or discarded materials, containers and debris from the site.
3.3 SCHEDULES
A. Provide Takeform Fusion 04, signage at all toilet rooms. Locate 1 unisex handicap graphic sign at each respective toilet room door. Locate 1 men and 1 women at each respective toilet rooms
B. Provide exterior signage in accordance with the local fire Marshall requirements for Fire Riser equipment, FDC, Haz Mat, Gas, and other related required locations.
C. Confirm actual wording and spelling of each sign with architect during submittals.
3.4 STANDARDS MANUAL
A. Manufacturer shall provide a comprehensive Standards Manual in both a paper and PDF format.
The manual shall include all renderings, drawings, location plan, message schedule, insert templates, mounting detail, and reorder information.
Section 10 21 13.16
PLASTIC-LAMINATE-CLAD TOILET COMPARTMENTS
1.01 RELATED DOCUMENTS
Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specifications sections, apply to work of this section.
1.02 DESCRIPTION OF WORK
A. Extent of toilet partitions or screens is indicated on drawings.
B. Types of toilet partitions required include the following: NOT USED
C. Types of screens required include the following:
Plastic Laminate, Wall Mounted with manufacturer’s required concealed blocking.
D. Toilet accessories are specified elsewhere in Division 10.
1.03 QUALITY ASSURANCE
A. Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication where possible, to ensure proper fitting of work. However, allow for adjustments within specified tolerances wherever taking field measurements before fabrication might delay work.
B. Coordination: Furnish inserts and anchorages that must be built into other work for installation of toilet screens and related work; coordinate delivery with other work to avoid delay.
C. ADA Compliance: Partitions and related items shall be installed per ADA requirements where applicable and in compliance with ADA Clearances.
1.04 SUBMITTALS
A. Product Data: Submit manufacturer’s detailed technical data for materials, fabrication, and installation, including catalog cuts of anchors, hardware, fastenings, and accessories.
B. Shop Drawings: Submit shop drawings for fabrication and erection of toilet partition assemblies not fully described by product drawings, templates, and instructions for installation of anchorage devices built into other work.
PART 2 – PRODUCTS
2.01 ACCEPTABLE MANUFACTURERS
A. Manufacturer: Subject to compliance with requirements, provide products of one of the following:
General Partitions Mfg. Corp.
Global Steel Products Corp.
Knickerbocker Partition Corp.
2.02 MATERIALS
A. General: Provide materials which have been selected for surface flatness and smoothness.
Exposed surfaces which exhibit pitting, seam marks, roller marks, stains, discolorations, telegraphing of core material, or other imperfections on finished units are not acceptable.
B. Finished panel thickness shall be 1” thick . Pilasters NOT USED
C. Concealed Anchorage Reinforcement: Minimum 12 gauge galvanized steel sheet.
D. Concealed Tapping Reinforcement: Minimum 14 gauge galvanized steel sheet.
E. Core Material for SCREENS: Manufacturer’s standard Core Material: ANSI 208.1, Medium
Density Series, wood particle board with 45 pounds minimum density in thickness to provide finished dimension of 1” minimum for screens.
F. Pilaster Shoes: NOT USED.
G. Stirrup Brackets: Manufacturer’s standard design for attaching panels to walls, either chromium-plated non-ferrous cast alloy (“Zamac”) or anodized aluminum.
H. Hardware and Accessories: Manufacturer’s standard design, heavy-duty operating hardware and accessories of chromium-plated non-ferrous cast alloy (“Zamac”).
I. Anchorages and Fasteners: Manufacturer’s standard exposed fasteners of stainless steel, chromium-plated steel, or brass, finished to match hardware, with theft-resistant type heads and nuts. For concealed anchors, use hot-dip galvanized, cadmium-plated, or other rust-resistant protective-coated steel.
J. Laminate Face Sheets and Edges: NEMA LD-3, general purpose plastic laminate – COLOR
AS SPECIFIED ON THE FINISH SCHEDULE
2.03 FABRICATION
A. General: Screens: Furnish units with cutouts, drilled holes, and internal reinforcement to receive partition-mounted hardware, accessories, and grab bars, as indicated.
B. Wall-mounted Urinal Screens: Furnish panel units in sizes indicated, of same construction and finish as partition system panels.
2.04 FINISHES
A. All face and edge surfaces to be covered with decorative laminate. Edges shall be laminated prior to face sheets to enhance vandal resistance and run off.
B. Finish as called out on the Drawings (to match Toilet Entry Door Laminate)
PART 3 – EXECUTION
3.01 INSTALLATION
A. General: Comply with manufacturer’s recommended procedures and installation sequence.
Install Screens rigid, straight, plumb and level.