About this file
This document contains Special Terms and Conditions applicable to a Well Installation and Well Abandonment contract (WIIN-12_W&WA) for the Commonwealth of Virginia. The contract requires the contractor to provide as-built drawings, wiring diagrams, maintenance manuals, parts lists, and warranty documentation upon completion of work. The contractor must retain all books, records, and contract-related documents for five years after final payment and permit access to the Commonwealth and state auditors for examination. The contract term includes a warranty period covering all materials and equipment against defects in material and workmanship, with the specific duration to be determined. At the conclusion of work, the contractor must demonstrate full operational compliance with contract specifications and applicable codes, and any deficiencies must be corrected at the contractor's sole expense prior to final acceptance.
Award of the contract will be made to the lowest responsive and responsible bidder that is a DSBSD-certified micro business if the bid is up to $10,000 and deemed fair and reasonable by the agency; otherwise, to a DSBSD-certified small business if the bid does not exceed $100,000. If neither criterion is met, award goes to the lowest responsive and responsible bidder of any size. The contractor and all subcontractors must maintain proper licensure as specified by Virginia Code Title 54.1, with Class A, B, or C contractor licenses required depending on contract value thresholds. The Commonwealth reserves the right to cancel the contract with 60 days' written notice without penalty. Delivery shall occur within a timeframe to be specified by the bidder after receipt of order, proposals remain valid for 60 days, and an eVA transaction fee will be assessed for each purchase order issued under this contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WIIN-12_W&WA Well and Well Abandonment SOW (1).pdf | ||
| General_Terms_and_Conditions PIM 45 July 2025.docx | DOCX document | |
| ARPA FUNDING-.docx | DOCX document | |
| REDACTED WIIN-12_W&WA Well Abandonment Permit.pdf | ||
| REDACTED WIIN-12_W&WA replacement well permit VDH (1).pdf | ||
| Construction Terms and Conditions-.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I. SPECIAL TERMS AND CONDITIONS:
1. AS BUILT DRAWINGS:
The Contractor shall provide the Commonwealth a clean set of reproducible “as built” drawings and wiring diagrams, marked to record all changes made during installation or construction. The Contractor shall also provide the Commonwealth with maintenance manuals, parts lists and a copy of all warranties for all equipment. All “as built” drawings and wiring diagrams, maintenance manuals, parts lists and warranties shall be delivered to the Commonwealth upon completion of the work and prior to final payment.
2. AUDIT:
The Contractor shall retain all books, records, and other documents relative to this contract for five (5) years after final payment, or until audited by the Commonwealth of Virginia, whichever is sooner. The agency, its authorized agents, and/or state auditors shall have full access to and the right to examine any of said materials during said period.
3. AWARD OF CONTRACT:
A. AWARD:
The Commonwealth will make the award(s) on ____________________________basis to the lowest responsive and responsible bidder that is a DSBSD-certified micro business if such a bid is received, provided that the bid is up to and including $10,000 and the agency in its sole discretion determines that the bid price is fair and reasonable. Otherwise, award of the contract shall be made to the lowest responsive and responsible bidder that is a DSBSD-certified small business if such a bid is received, provided that the bid is not more than $100,000 and the agency in its sole discretion determines that the bid price is fair and reasonable. If, in the agency’s opinion, the criteria in the previous two sentences are not present, then award shall be made to the lowest responsive and responsible bidder of any size, provided the agency in its sole discretion determines that the price is fair and reasonable. If applicable, unit prices, extensions and grand total must be shown. In case of arithmetic errors, the unit price will govern. If cash discount for prompt payment is offered, it must be clearly shown in the space provided. Discounts for early prompt payment will not be considered in making awards. The State reserves the right to reject any and all bids in whole or in part, to waive any informality, and to delete items prior to making an award.
4. CANCELLATION OF CONTRACT:
The purchasing agency reserves the right to cancel and terminate any resulting contract, in part or in whole, without penalty, upon 60 days written notice to the contractor. Any contract cancellation notice shall not relieve the contractor of the obligation to deliver and/or perform on all outstanding orders issued prior to the effective date of cancellation.
5. CONTRACTOR/SUBCONTRACTOR LICENSE REQUIREMENT:
By my signature on this solicitation, I certify that this firm/individual and subcontractor is properly licensed for providing the goods/services specified. Furthermore, the contractor and subcontractors shall maintain the required license throughout the term of the contract. The contractor or their subcontractor shall immediately notify the contracting agency in writing in the event the license has been revoked.
Contractor Name:_________________
License # _________________ Type ________________
Subcontractor Name:_________________________
License # _________________ Type ________________
6. CONTRACTOR REGISTRATION:
If a contract for construction, removal, repair or improvement of a building or other real property is for $120,000 or more, or if the total value of all such contracts undertaken by bidder/offeror within any 12-month period is $750,000 or more, the bidder/offeror is required under Title 54.1-1100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors a “CLASS A CONTRACTOR.” If such a contract is for $10,000 or more but less than $120,000, or if the total value of all such contracts undertaken by bidder/offeror within any 12-month period is $150,000 or more, but less than $750,000 or more, the bidder is required to be licensed as a “CLASS B CONTRACTOR.” If such a contract is over $1,000 but less than $10,000, or if the contractor does less than $150,000 in business in a 12-month period, the bidder is required to be licensed as a “CLASS C CONTRACTOR.” The board shall require a master tradesmen license as a condition of licensure for electrical, plumbing and heating, ventilation and air conditioning contractors. The bidder/offeror shall place on the outside of the envelope containing the bid/proposal and shall place in the bid/proposal over his signature whichever of the following notations is appropriate, inserting his contractor license number:
Licensed Class A Virginia Contractor No. _______________Specialty _______________ Licensed Class B Virginia Contractor No. _______________Specialty _______________ Licensed Class C Virginia Contractor No. _______________Specialty _______________
If the bidder/offeror shall fail to provide this information on his bid/proposal or on the envelope containing the bid/proposal and shall fail to promptly provide said contractor license number to the Commonwealth in writing when requested to do so before or after the opening of bids/proposals, he shall be deemed to be in violation of § 54.1‑1115 of the Code of Virginia (1950), as amended, and his bid/proposal will not be considered.
If a bidder/offeror shall fail to obtain the required license prior to submission of his bid/proposal, the bid/proposal shall not be considered.
7. DELIVERY:
Delivery of goods or performance of services shall be within the number of calendar days stated below after receipt of order (ARO) by the bidder/offeror. The Agency requires the (bidder/offeror) to deliver within a reasonable time after ARO. If the bidder/offeror does not insert a stated delivery time in the blank below, the (bidder/offeror) will be deemed to offer delivery in accordance with the Agency’s desired delivery time as stated below:
Agency’s desired delivered time: _____ calendar days ARO
BIDDER’S/OFFEROR’S STATED DELIVERY TIME: ____ CALENDAR DAYS
8. eVA ORDERS AND CONTRACTS:
The solicitation/contract will result in (1) purchase order(s) with the applicable eVA transaction fee assessed for each order.
9. FINAL INSPECTION:
At the conclusion of the work, the Contractor shall demonstrate to the authorized owner’s representative that the work is fully operational and in compliance with contract specifications and codes. Any deficiencies shall be promptly and permanently corrected by the Contractor at the Contractor’s sole expense prior to final acceptance of the work.
10. INDEMNIFICATION:
Contractor agrees to indemnify the Commonwealth of Virginia, its officers, agents, and employees for any loss, liability, cost, or reasonable settlement cost incurred as a result of any claims, damages and actions of any kind or nature, whether at law or in equity, arising from or caused by the use of any materials, goods, or equipment of any kind or nature furnished by the contractor/any services of any kind or nature furnished by the contractor, provided that such liability is not attributable to the sole negligence of the using agency or to failure of the using agency to use the materials, goods, or equipment in the manner already and permanently described by the contractor on the materials, goods or equipment delivered.
11. MAINTENANCE MANUALS:
The Contractor shall provide with each piece of equipment an operations and maintenance manual with wiring diagrams, parts list, and a copy of all warranties.
12. PREVENTIVE MAINTENANCE:
The Contractor shall provide necessary preventive maintenance, required testing and inspection, calibration and/or other work necessary to maintain the equipment in complete operational condition during the warranty period.
13. PRIME CONTRACTOR RESPONSIBILITIES:
The Contractor shall be responsible for completely supervising and directing the work under this contract and all subcontractors that he may utilize, using his best skill and attention. Subcontractors who perform work under this contract shall be responsible to the prime contractor. The contractor agrees that he is as fully responsible for the acts and omissions of his subcontractors and of persons employed by them as he is for the acts and omissions of his own employees.
14. PROPOSAL ACCEPTANCE PERIOD:
Any proposal in response to this solicitation shall be valid for (60) days. At the end of the (60) days the proposal may be withdrawn at the written request of the Offeror. If the proposal is not withdrawn at that time it remains in effect until an award is made or the solicitation is canceled.
15. PRECEDENCE OF TERMS:
The following General Terms and Conditions: VENDORS MANUAL, APPLICABLE LAWS AND COURTS, ANTI-DISCRIMINATION, ETHICS IN PUBLIC CONTRACTING, IMMIGRATION REFORM AND CONTROL ACT OF 1986. DEBARMENT STATUS, ANTITRUST, MANDATORY USE OF STATE FORM AND TERMS AND CONDITIONS, CLARIFICATION OF TERMS, PAYMENT shall apply in all instances. In the event there is a conflict between any of the other General Terms and Conditions and any Special Terms and Conditions in this solicitation, the Special Terms and Conditions shall apply.
16. SUBCONTRACTS:
No portion of the work shall be subcontracted without prior written consent of the purchasing agency. In the event that the contractor desires to subcontract some part of the work specified herein, the contractor shall furnish the purchasing agency the names, qualifications and experience of their proposed subcontractors. The contractor shall, however, remain fully liable and responsible for the work to be done by its subcontractor(s) and shall assure compliance with all requirements of the contract.
17. WARRANTY:
All materials and equipment shall be fully guaranteed against defects in material and workmanship for a period of ______________ following date of delivery. Should any defect be noted by the owner, the Purchasing Office will notify the contractor of such defect or non-conformance. Notification will state either (1) that the contractor shall replace or correct, or (2) the owner does not require replacement or correction, but an equitable adjustment to the contract price will be negotiated. If the contractor is required to correct or replace, it shall be at no cost to the Commonwealth and shall be subject to all provisions of this clause to the same extent as materials initially delivered. If the contractor fails or refuses to replace or correct the deficiency, the office issuing the purchase order may have the materials corrected or replaced with similar items and charge the contractor the costs occasioned thereby or obtain an equitable adjustment in the contract price.
18. WORK SITE DAMAGES:
Any damage to existing utilities, equipment or finished surfaces resulting from the performance of this contract shall be repaired to the Commonwealth’s satisfaction at the Contractor’s expense.