Special_Provisions_and_Specifications_S&S.pdf

PDF 374 KB Posted

Attached to
FY27-FY29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract
Solicitation number
27-0039-ITB-C
Issued by
Pinellas County, Florida

About this file

This is a Special Provisions and Specifications document for Pinellas County Public Works in Florida supporting the FY27-FY29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract. The document establishes technical and contractual requirements for three qualified contractors selected to provide as-needed CIPP lining services and related stormwater infrastructure rehabilitation work. Services include pipe cleaning, inspections, and similar construction activities necessary to rehabilitate the County's stormwater system. The contract term spans fiscal years 2027 through 2029, with work to be performed on an as-needed basis through individual work orders issued by the County.

The document contains detailed specifications governing contractor performance, material standards, quality assurance requirements, and compliance obligations for all CIPP rehabilitation activities. Special provisions address technical procedures, equipment specifications, testing protocols, and administrative requirements specific to stormwater pipeline rehabilitation work. Contractors selected for this multiple-award contract must comply with all provisions outlined in the document and be prepared to respond to work order requests throughout the contract period. No set-asides are indicated in the available information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Provisions and Supplemental Technical Specifications

FY27-29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract

Contract No. 27-0039-ITB-C

November 2026

Justin.Keller New Stamp

FY27-29 STORMWATER CURED-IN-PLACE PIPELINING (CIPP) REHABILITATION WORK ORDER CONTRACT

CONTRACT NO. 27-0039-ITB-C

SECTION 00 75 000 SPECIAL PROVISIONS AND SUPPLEMENTAL TECHNICAL

SPECIFICATIONS

PAGE 00 75 000 - 1

SECTION 00 75 00

SPECIAL PROVISIONS AND SUPPLEMENTAL TECHNICAL SPECIFICATIONS

TO ACCOMPANY PINELLAS COUNTY DEPARTMENT OF PUBLIC WORKS SUPPLEMENTAL

SPECIFICATIONS FOR ROADWAY AND GENERAL CONSTRUCTION (PC-SS) (JANUARY 2025),

PINELLAS COUNTY UTILITIES DEPARTMENT STANDARD TECHNICAL SPECIFICATIONS FOR

UTILITIES AND RELATED CONSTRUCTION (PC-STSURC) (JUNE 2018), AND FLORIDA

DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE

CONSTRUCTION, DIVISION I SECTION 9-2.1.2 ONLY, DIVISION II, AND DIVISION III (FY 2024- 2025):

Unless noted herein, all conditions of the SS & STSURC apply.

• Located on Pinellas County website for “ENGINEERING & TECHNICAL INFORMATION:

PUBLIC WORKS & UTILITIES.”

Web Address: https://pinellas.gov/engineering-technical-information-public-works-and-utilities

• Located on the FDOT website for “FDOT Specifications Office: Standard Specifications Library.”

Web Address: https://www.fdot.gov/specifications/standard-specification-library

ARTICLE SP-1 SUMMARY OF WORK

This project furnishing all labor, supervision, manpower, tools, equipment, materials, insurance, bonds, management, transportation, and performing all operations in connection with the rehabilitation of 12" through 84" gravity sanitary sewer and storm sewer lines using Cured-In-Place Pipe (CIPP) liner.

Separate payment shall not be made for trench safety systems. Include the cost of said systems within the pay items.

ARTICLE SP-2 SPECIAL PROVISIONS

In addition to pay items added in the Supplemental Specifications, add the following pay items to the contract:

ITEM NO. 425-X-XXX LIFTING OR REPLACEMENT OF STRUCTURE LIDS

Description: The contractor may be required to lift structure lids in the event that no manhole or other access is available. This work will be allowed upon prior authorization by the County. Work includes all labor, tools, equipment, and other items needed to remove the structure lid. Re-lifting of lid and resetting of lid back onto structure are included.

In the instance that the existing structure is damaged prior to the initiation of work or the County requests a replacement structure, the work shall consist of the removal, construction and replacement of structure tops. The item shall include excavation, protection of existing features to remain, protection of existing structures to remain, removal and disposal of existing concrete top slabs, saw cutting of structures, doweling, forming, reinforcement

PAGE 00 75 000 - 2

and other reconstruction elements shown in County Index ID 1255. Separate payment will not be made for the concrete and reinforcement used.

Measurement: The work specified under this section shall be paid for at the contract unit price per each (EA) structure top lifted or reconstructed.

Payment shall be made under:

Item No. 425-4-001 Lifting of Structure Lids Item No. 425-0-231 Remove & Replace Existing RC 3 Structure Top Only Item No. 425-0-241 Remove & Replace Existing RC 4 Structure Top Only Item No. 425-0-251 Remove & Replace Existing RC 5 Structure Top Only Item No. 425-0-261 Remove & Replace Existing Type J-5, Top Only (w/ring and cover) Item No. 425-0-271 Remove & Replace Existing Type J-6, Top Only (w/ring and cover)

ARTICLE SP-3 MODIFICATIONS TO THE PINELLAS COUNTY DEPARTMENT OF PUBLIC WORKS

SUPPLEMENTAL SPECIFICATIONS FOR ROADWAY AND GENERAL

CONSTRUCTION (PC-SS) (JANUARY 2025)

The following specifications shall be modified:

SECTION 101-0100 MOBILIZATION

The basis of payment for the referenced pay items shall be revised from a LUMP SUM (LS) to a PER EACH (EA).

The pay item for Mobilization for Routine Work shall cover mobilization costs for routine work, as defined by the County. For routine work, the Contractor will be required to respond to the request of the County via email or telephone within ten (10) calendar days of notification. The Contractor will be required to start work within fifteen (15) calendar days of notification. If mobilization is not completed within the fifteen (15) calendar day time period, authorization to extend the mobilization timeline may be granted by the Engineer.

The pay item for Mobilization for Emergency Work shall cover mobilization costs for emergency work, as defined by the County.

For emergency work, the Contractor will be required to respond to the request of the County via email or telephone within one (1) calendar day of notification. The Contractor will be required to start work within forty-eight (48) hours of notification.

Maintenance of Traffic for two lane roadways and shoulder work (as specified per FDOT Index 102-600, 601, 602, 603, 604, 605, and

606) is included with these pay items.

PAGE 00 75 000 - 3

SECTION 102-0100 MAINTENANCE OF TRAFFIC

Costs for Maintenance of Traffic shall be included within the Mobilization pay item. Maintenance of Traffic pay items shall not be used when implementing the FDOT Indices included within the Mobilization pay items. Maintenance of traffic pay items shall only be used when additional traffic control devices are required or when other FDOT Indices are implemented.

The pay item for Multi-Lane TCPs shall include all costs for items associated with the appropriate FDOT Index. No separate payment will be provided for signs, barricades, or any other traffic control element specified within the referenced indices.

The Contractor will be required to prepare and submit a Traffic Control Plan (TCP). This plan shall receive written Engineer approval prior to implementation. A breakdown of pay items required to implement the submitted TCP shall be included in the submittal.

SECTION 431 PIPE LINER

Section 431 of the FDOT Specifications shall not be applicable to this project.

SECTION 999-000 UNSPECIFIED WORK

Unspecified work, when requested by the County, shall be done at on a lump sum/unit price basis or cost-plus basis, as determined by the County.

Lump Sum/Unit Price - When a lump sum/unit price is used, the lump sum/unit price will be determined by negotiation, and only require written pre-approval by the County as backup documentation for payment purposes. The total compensation for work negotiated under a unit price will be a measurement (i.e. linear feet) or a count (i.e. each) of the item as installed.

Cost-Plus - When a cost-plus price is used, compensation shall be limited to the Contractor’s reasonable costs plus markup percentages stipulated in this contract. A written estimate of the costs, approved by the County, shall be required prior to the work.

The basis of the cost-plus negotiated prices shall include subcontractor invoices, equipment cost invoices, material cost invoices, and other supporting documentation will be included in the pay application.

PAGE 00 75 000 - 4

Individual pieces of equipment or tools having a replacement value less than $250.00 shall be considered small tools, incidental to the work, and included in other pay items.

ARTICLE SP-4 MODIFICATIONS TO THE PINELLAS COUNTY UTILITIES DEPARTMENT

STANDARD TECHNICAL SPECIFICATIONS FOR UTILITIES AND RELATED

CONSTRUCTION (PC-STSURC) (JUNE 2018)

The following specifications shall be modified:

SECTION 33 01 32 SANITARY SEWER CLEANING AND TELEVISING

This section shall apply to stormwater culverts. All references to sanitary sewer shall apply to stormwater culverts.

Revise the software reference from Granite XP to GraniteNet.

Section 3.01 – Neighborhood Notification, Subsection A.

- Revise the notification timeline from 48-hours to 72-hours.

Section 3.04 – Cleaning Procedure, Subsection A.

- Pre-cleaning televised inspection shall be conducted prior to cleaning.

Section 3.04 – Cleaning Procedure, Subsection C.

- Remove requirement for manhole inspections.

Section 3.07 – Removal of Debris

- Suitable devices shall also be used to prevent the transfer of cleaning water downstream.

ARTICLE SP-5 SUPPLEMENTAL TECHNICAL SPECIFICATIONS

Note: The Supplemental Technical Specifications presented herein are project specific, are only related to this project and are not part of the Pinellas County Department of Public Works Supplemental Specifications for Roadway and General Construction (PC-SS) or Pinellas County Utilities Department Standard Technical Specifications for Utilities and Related Construction (PC-STSURC).

33 43 00 STORMWATER CULVERT CURED-IN-PLACE PIPE LINER

PAGE 00 75 000 - 5

TECHNICAL SPECIFICATION CHECKLIST

Project Name: FY27-29 Stormwater Cured-in-Place Pipelining (CIPP) Rehabilitation Work Order Contract Project Number: N/A

The following sections of the Supplemental Specifications (SS) will apply to this contract if marked “X” as shown below:

001 X Minimum Testing Frequency and Sampling 005 X Survey by Contractor 101-0100 X Mobilization 102-1000 X Maintenance of Traffic 104 X Prevention, Control and Abatement of Erosion and Water Pollution 104-5000 X Water for Dust Control 110 X Clearing & Grubbing 120-1100 X Grading 330 X Hot Mix Asphalt – General Construction Requirements 334 X Superpave Asphalt Concrete 347 X Portland Cement Concrete 425 X Inlets, Manholes, and Junction Boxes – FDOT and PCED Type

430 X Pipe Culvert 440 X Underdrains 520 X Concrete Gutter, Curb Elements, and Traffic Separator 527 X Detectable Warnings 570 X Performance Turf 603 General Requirements for Traffic Control Signals and Devices 630 Conduit 633 Communications Cable 635 & 996 Pull, Splice, and Junction Boxes 641 Prestressed Concrete Poles 660 & 995 Vehicle Detection System 670 Traffic Controller Assemblies 700 & 995 X Highway Signing 810 Wheel Stop 820 Archeological and Human Remains Discovered 900-0100 Signs – Project Identification 900-200 Office for the Engineer 999-000 X Unspecified Work

PAGE 00 75 000 - 6

The following sections of the Standard Technical Specifications (STSURC) will apply to this contract if marked “X” as shown below:

00 75 00 Special Provisions and Supplemental Technical Specifications 01 32 33 Color Audio-Video Construction Records 01 35 00 Special Project Procedures 01 42 01 Reference Standards and Definitions 01 45 17 Pipeline Pressure and Leakage Testing Requirements 01 55 26 Traffic Regulation 01 57 00 Control of Work 01 57 13 Erosion and Sedimentation Control 01 58 01 Project Identification Signs 01 78 39 Project Record Documents 03 10 01 Concrete Materials 09 91 00 Painting and Protective Coatings 31 23 33 Excavation and Backfill for Pipes 31 23 34 Excavation and Backfill for Structures 32 12 01 Stabilized and Asphalt Roadway Restoration 32 13 01 Concrete Sidewalks, Driveways and Gutters 32 92 01 Seeding and Sodding 33 01 31 Sanitary Sewer Cured in Place Pipelining 33 01 32 X Sanitary Sewer Cleaning and Televising 33 01 33 Manhole Rehabilitation 33 01 34 Sanitary Sewer Pipe Repairs 33 01 35 Multi-Component Stress Panel Manhole Liner System 33 01 36 Urethane/Epoxy, Polyurea Manhole Liner System 33 01 37 Polyurethane Manhole Liner System 33 01 38 Polymorphic Resin Manhole Liner System 33 01 39 Calcium Aluminate Manhole Liner System 33 01 40 CIPP Structural Lateral Connection Lining 33 01 41 Epoxy Manhole Liner 33 05 20 Jacking and Boring 33 05 22 Horizontal Directional Drilling and Subaqueous Crossings 33 11 01 Potable Water Main Piping and Appurtenances 33 13 01 Disinfection of Potable Water Mains 33 32 00 Submersible Wastewater Pumping Stations 33 33 01 Gravity Sewers 33 34 00 Sanitary Sewage Force Mains and Appurtenances 33 35 01 Reclaimed Water Main Piping and Appurtenances 33 39 00 Sanitary Sewer Structures 40 95 01 Wastewater Pump Station SCADA Remote Telemetry Unit (RTU) 48 11 30 Standby Diesel Generators

END OF SECTION

SECTION 33 43 00 STORMWATER CULVERT CURED-IN-PLACE PIPE (CIPP)

LINER

PAGE 33 43 00 - 1

SECTION 33 43 00

SUPPLEMENTAL TECHNICAL SPECIFICATIONS

STORMWATER CULVERT CURED-IN-PLACE PIPE LINER

THE SUPPLEMENTAL TECHNICAL SPECIFICATIONS PRESENTED HEREIN ARE PROJECT

SPECIFIC, ARE ONLY RELATED TO THIS PROJECT AND ARE NOT PART OF THE PINELLAS

COUNTY DEPARTMENT OF PUBLIC WORKS SUPPLEMENTAL SPECIFICATIONS FOR ROADWAY

AND GENERAL CONSTRUCTION (PC-SS) (JANUARY 2025). THIS SECTION ONLY APPLIES TO

CURED-IN-PLACE PIPE (CIPP) LINING, ASSOCIATED WORK AND CORRESPONDING PAY ITEMS.

PART I – GENERAL

1. SCOPE OF WORK

a. The work includes furnishing all labor, supervision, manpower, tools, equipment, materials, insurance, bonds, management, transportation, and performing all operations in connection with the rehabilitation of 12" through 84" storm culverts using Cured-In-Place Pipe (CIPP) liner, inclusive of elliptical equivalents. When elliptical pipe is cleaned, inspected and / or lined, payment shall be provided as a circular equivalent. All references to circular pipe sizes within this specification are implied to also reference equivalent elliptical pipes.

b. Except in locations where segmental liners are proposed, the CIPP shall be continuous and jointless from structure to structure. All liners shall be free of all defects that will affect the long-term life and operation of the pipe.

c. All lining material shall be suitable for use in stormwater systems.

d. Pipelines to be rehabilitated may be in backyard easements, light traffic subdivision roadways or highways requiring Temporary Traffic Control Plans conforming to Florida Department of Transportation standard plans. Temporary Traffic Control plans prepared by a professional engineer or advanced maintenance of traffic certified professional are required for work where standard index plans do not apply. Work in FDOT R/W’s that requires lane closures typically will only be allowed Sunday – Thursday 8:00 PM – 5:30 AM, or as permitted in FDOT Utility Permits, when such permits are required.

e. Culverts to be cleaned will require pre-cleaning and post-cleaning televised inspection. Culverts to be rehabilitated will require a pre-installation and post-installation televised inspection. Culverts may require by-pass pumping to successfully install the liner system while suitably managing upstream water elevations. Work may result in culverts being cleaned without lining services.

f. If the Contractor feels point repairs are necessary to complete lining of a particular main line segment, the County may either instruct the Contractor to make the individual necessary repairs, perform the repair using other means, or cancel the associated lining work at no cost to the County.

g. The Contractor shall be responsible for all material removed from the culvert and shall properly dispose of materials in accordance with the appropriate regulatory agency requirements and shall

PAGE 33 43 00 - 2

supply documentation of conformance to these requirements. Materials removed from the culvert may not be pushed into other areas or adjacent structures. It is also required that the contractor supply the volume or weight of debris removed.

h. Any damage occurring during the rehabilitation process shall be the responsibility of the

Contractor including, but not limited to, point repairs, main line replacement, any and all required permits, traffic control, bypass pumping, including a back-up system, pipe/structure ventilation systems to meet confined space entry requirements, Personal Protection Systems, such as personal fresh air respirators, and restoration of all disturbed areas.

i. Any infrastructure damage occurring during the rehabilitation process shall be the responsibility of the Contractor including, but not limited to, point repairs, main line replacement, any and all required permits, traffic control, bypass pumping, including a back-up system and restoration of all disturbed areas. The Contractor shall be responsible for any cure water spills during all operations and pay any and all fines, fees, property damage, environmental damage and cleanup costs that are associated with cure water or condensate spills.

j. All work shall be done in compliance with National Pollutant Discharge Elimination System

(NPDES) rules and regulations. Contractors are required to notify the Public Works Environmental Compliance Manager prior to commencement of each Work Order and include them in all preconstruction meetings. Discharge of cure water will be considered an illicit discharge and subject to the associated fines and reporting requirements.

k. Proper Erosion and Sedimentation Control best management practices must be utilized during all work. See Pinellas County Supplemental Specifications (SP-SS), Stormwater Pollution Prevention Plan, and Erosion and Sediment Details. Where activities have the potential to discharge sediment, cure water, wash/cleaning water, or turbid water into an open conveyance system or receiving water, temporary turbidity controls shall be installed downstream of the work area prior to initiating construction activities. Unless otherwise approved by the County or required by permit, controls shall be installed at the first practicable downstream location sufficient to contain visible turbidity and prevent migration beyond the active work area. Contractor shall inspect and maintain controls daily and after rainfall events.

l. Pinellas County water use meter account Any Contractor requiring the use of Pinellas County potable water for CIPP curing, bypass pumping, pipe cleaning, or any other water-dependent work activity, shall procure a temporary meter account through Pinellas County Utilities prior to the use of any County water supply. The Contractor is responsible for applying for either a Hydrant Meter or a Truck Meter, as applicable to the method of water use, by submitting an application through the Pinellas County Utilities online portal at: https://pinellas.gov/services/apply-for-a-temporary-hydrant-truck-meter/. No County water shall be accessed or used prior to account approval and meter installation. For Hydrant Meters, upon submission of the application, the County Utilities Account Management representative will verify the location and provide payment processing instructions; the meter will be installed within one (1) to two (2) business days following receipt of payment. For Truck Meters, upon submission of the application, the County Utilities Account Management representative will provide payment processing instructions and schedule a date and time for the Contractor to pick up the truck meter from the Meter Distribution facility located at 6730 142nd Avenue, Largo, Florida; once the meter is mounted to the truck, the Contractor shall return to the facility for inspection and installation of an endpoint device for electronic reading activation.

PAGE 33 43 00 - 3

2. QUALITY CONTROL

Products and Installers seeking approval must meet all the following criteria to be deemed acceptable. This criteria supplements the experience and material suitability requirements listed elsewhere within this contract.

a. The cured-in-place pipe must have a minimum design life of 50 years. The minimum design life may be documented by submitting life estimates by national or internationally recognized authorities or specifying agencies, to the County Representative. Otherwise, long-term testing and long-term in-service results may be used and results extrapolated to 50 years.

b. Acceptable products shall provide documented acceptable stormwater installations in the United

States for the sizes indicated in the bid sheets.

c. The contractor shall provide documented experience and acceptable installation with the specific requested product as outlined elsewhere.

d. A client/reference list shall be supplied, which shall include the product utilized for the referenced installations along with the dates of installation and the lineal footage of the individual installations.

e. Liner materials shall conform to the requirements of ASTM F-1216 and the manufacturer's published specifications as approved by the County.

3. SUBMITTALS

The Contractor shall submit the following information:

a. Manufacturer’s certification that the materials to be used meet the referenced standards and these specifications.

b. License or certificate verifying Manufacture’s/ Licensor’s approval of the installer.

c. Lining Manufacturer’s product data and instructions for resin and catalyst system.

d. Design Calculations, in accordance with the Appendix of ASTM F- 1216, for each length of liner to be installed including the thickness of each proposed CIPP. The calculations shall use a minimum Factor of Safety of 2.0 and assume full deterioration of the pipe. Design Calculations are to be completed and provided for the design of all pipe liner systems. All calculations shall include data that conforms to the requirements of these specifications.

e. A detailed installation plan describing all preparation work, cleaning operations, pre-installation closed-circuit television (CCTV) inspections, bypass pumping, traffic control, installation procedures, method of curing, service reconnection, quality control, testing to be performed, post-installation CCTV inspections, and all else necessary and appropriate for a complete CIPP liner installation.

f. Tube wet-out and cure method including: a complete description of the proposed wet-out procedure, manufacturer’s recommended cure method for each diameter and thickness of CIPP

PAGE 33 43 00 - 4

liner to be installed, and detailed curing procedure detailing the curing medium and the method of application.

g. For pipes terminating at open outfalls or non-manhole structures, the Contractor shall submit an end treatment detail addressing annular space sealing, infiltration prevention, and long-term liner termination stability.

h. A detailed installation schedule.

i. All Material Safety Data Sheets (MSDS) for all materials to be furnished for the project.

j. Weekly work schedules shall be submitted no later than close of business on preceding Thursdays for the work on the following week. Scope of the schedule shall include the following: cleaning operations, CCTV inspections, lining, and crew leader’s information including phone number.

k. Quality Assurance and Quality Control Plan (QA/QC Plan) detailing the Contractor’s processes to ensure that the contract specifications are adhered to for cleaning, inspecting, repairing, lining, testing, and all other work activities under the contract.

l. Verification of CCTV operator’s NASSCO certifications.

m. All CCTV inspection reports and corresponding videos.

n. It is required that the Contractor submit with each invoice documentation that details all final line items and quantities associated with the work completed to the pipe segment, such as but not limited to the asset identification number, the identification numbers of the starting and terminal structures, the pipe material, the linear footage, the pre-lining condition assessment scores, the level of cleaning performed, the amount of debris removed, the lining method/material, date the work was completed, and associated invoice number.

o. Testing protocol including testing laboratory.

4. SUBSTITUTIONS

a. Only after execution of the contract will the County consider requests from Contractor for substitutions. Substitutions will be considered only when a product becomes unavailable due to no fault of the Contractor.

b. Items identified as “equal” shall be accompanied by product literature and a written itemized comparison of the published specifications (feature by feature from the manufacturer’s literature) for the item specified and for the item proposed. The burden of proof of “equality” shall be on the supplier.

c. Request constitutes a representation that the Contractor:

i. Has investigated proposed product and determined that it meets or exceeds, in all respects, specified product.

ii. Will provide the same warranty for the proposed product as for specified product.

PAGE 33 43 00 - 5

iii. Will coordinate installation and make other changes which may be required for Work to be complete in all respects.

iv. Waives claims for additional costs which may subsequently become apparent.

d. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals without separate written request, or when acceptance will require substantial revision of Contract Documents.

e. County will determine acceptability of proposed substitution and will notify Contractor of acceptance or rejection in writing within a reasonable time.

PART 2 – PRODUCTS

1. CURED-IN-PLACE PIPELINING (CIPP)

a. The liner material shall be an epoxy vinyl ester or polyester fiber felt resin impregnated tubing or Engineer approved equal, sized to tightly fit the internal circumference and length of the designated gravity storm sewer. The cured liner shall meet the minimum initial structural properties as listed in ASTM F-1216. The liner shall be designed in accordance with the Appendices in ASTM F-1216. It shall be assumed that a fully deteriorated culvert having no structural strength will be rehabilitated with H-20 traffic loading, the water tables at the ground surface and the product installed will have a minimum expected lifetime of fifty (50) years. Minimum liner thickness for pipes greater than twelve (12) inches shall be as specified in the bid form. Minimum liner thickness shall be measured as post-cured thickness. Liner shall be sized by Contractor to provide a tight fit to the inside circumference of the host pipe and shall be a continuous, joint-less, lining from structure to structure.

b. The structural performance of the finished pipe must be adequate to accommodate all internal and external loads (live and dead) over its design life. No cured-in-place pipe lining will be allowed that requires bonding to the existing pipe for any part of its structural strength. If reinforcing materials (fiberglass, etc.) are used, the reinforcing material must be totally and completely encapsulated within the resin to assure that the reinforcing material is not exposed, either to the inside of the pipe or at the interface of the cured-in-place pipe lining and the deteriorated pipe.

c. Unless otherwise specified, the Contractor shall use an epoxy vinyl ester or polyester resin and catalyst system, and a fiber felt tube compatible with the inversion or other approved alternate installation process and having the following minimum physical properties for the cured pipe:

PROPERTY TEST METHOD MINIMUM VALUE

Tensile Strength (for pressure pipes only)

ASTM D 638 3,000 psi

Flexural Strength Modified ASTM D 790 4,500 psi Flexural Modulus of Elasticity Modified ASTM D 790

Modulus of Elasticity 300,000 psi

Minimum Long-Term Modulus of Elasticity (50 Years)

ASTM D 790 150,000 psi

PAGE 33 43 00 - 6

d. The epoxy vinyl ester or polyester resin and fiber felt tubing system shall be in accordance with the requirements of ASTM F-1216 and be fabricated to a size that, when installed, will neatly fit the interior of the host pipe. Allowance shall be made for circumferential stretching during a direct (non-inversion) pull in. The CIPP product shall fit tightly to the host pipe (with minimal shrinkage) in such a way as to minimize water migration (tracking) between the liner and the host pipe. A vacuum impregnation process shall be used in conjunction with a roller system to achieve a uniform distribution of the resin throughout the tube under controlled conditions. The volume shall be adjusted by adding five to ten (10) percent excess resin for the change in resin volume due to polymerization and to allow for any migration of resin into cracks or joints in the host pipe.

e. The outside of the fabric tube shall be marked every 5 feet with the name of the manufacturer or CIPP system, manufacturing lot and production footage.

2. CHEMICAL JOINT, CRACK AND ANNULAR SPACE SEALING MATERIALS FOR ACTIVE LEAKS

a. Chemical joint and crack sealing materials used on this Project shall have the following properties:

i. React quickly to form a permanent watertight seal

ii. Resultant seal shall be flexible and immune to the effects of wet/dry cycles

iv. Non-biodegradable and immune to the effects of acids, alkalis, and organic material typically present in stormwater conveyances. Component packaging and mixing compatible with field conditions and worker safety

v. Extraneous sealant left inside pipe shall be readily removable; and shall be compatible with the repair resin utilized

b. Chemical joint sealing material shall be acrylic resin type and shall be furnished with activators, initiators, inhibitors and any other materials recommended by the manufacturer for a complete grout system.

c. Sealing grout shall be furnished in liquid form in standard manufacturer’s containers. Sealing grout shall be as specified in the Pinellas County Material Specification Manual.

PART 3 - EXECUTION

1. PUBLIC NOTIFICATION

a. All residences and businesses fronting or accessing the work area, as identified by the County in each Work Order, shall be notified by delivery of a notification no less than 72-hours prior to work commencing.

b. Notifications shall include the following:

i. An explanation of the work to be performed

ii. When the work is anticipated to commence

iii. Where the work is to be performed in reference to local streets

iv. The name and office telephone numbers of Contractor representatives

v. The nature of the inconvenience(s) anticipated to be experienced by the resident/ business owner

PAGE 33 43 00 - 7

vi. The anticipated duration of the work

vii. That the work is being performed on behalf of Pinellas County and a phone number and email address for the County inspector assigned to the project.

c. Information included in the notifications regarding Contractor representatives shall include both the name and twenty-four (24) hour telephone number of the Contractor’s supervisor at the work site(s) and the name and business telephone number of a Contractor representative who is responsible for the administration of the project from the location of the offices of the Contractor.

d. The proposed format of all correspondence from the Contractor to the public, shall be reviewed, and approved, by the County.

e. Complete public notification is to be the exclusive responsibility of the Contractor.

f. Cost associated with public notifications shall be included in the contract price of the mobilization pay item established in the bid schedule.

2. FLOW CONTROL

a. The Contractor shall bypass around the section of pipe being lined by plugging the upstream structure and discharging to a downstream structure or conveyance, if needed. Bypass shall be set up to cause minimum disruption to residents, commercial establishments and traffic. Pumps shall be of sufficient capacity to replicate the full flow capabilities of the culvert being lined.

b. If flows are minimal and lining can be installed in a timely manner, bypass may not be required.

However, the Contractor will be responsible for any consequences of flow blockages. Anticipated weather events, seasonal and non-seasonal, shall be considered prior to proceeding without bypass. Engineer approval shall be provided.

c. The Contractor shall be responsible for any back-up or any damage caused by the lining process.

3. SITE DISRUPTION / ACCESS EXCAVATIONS

a. Excavation associated with this contract shall be limited to external point repairs. All other excavations resulting from lost equipment, pipe damaged by Contractor operations, etc. shall be performed at no cost to the County and must be pre-approved by the County. Restoration of the site to its original or better condition shall also be at no cost to the County.

b. Not included in this section are point repairs caused from old pipe that has deteriorated to such a degree to prevent the installation of the cured-in- place pipe lining.

4. CLEANING AND TELEVISION INSPECTION

a. The following televised inspections will be required: pre-cleaning, post-cleaning, pre-installation, and post-installation.

b. It shall be the responsibility of the Contractor to clean the pipes and prepare them for rehabilitation prior to lining, or as otherwise requested by the County. The interior of the pipes shall be thoroughly cleaned to produce a clean interior surface free of all coatings, sand, rock, roots, PAGE 33 43 00 - 8 sludge, or other deleterious materials. This activity must provide a clean surface for televising and may be used to determine the extent of restoration required.

c. All sediment and debris must be completely removed and cleaning water should be removed prior to inspection. Any debris that enters the structure during the cleaning process must also be removed and properly disposed of. See later sections of this specification for water disposal requirements.

d. The Contractor shall clean and televise the assigned culvert in accordance with Pinellas County

Utility Specification 33 01 32 - Sanitary Sewer Cleaning and Televising. Only National Association of Sewer Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) certified personnel trained in locating breaks, obstacles and connections by closed circuit television using PACP certified software shall perform the inspection.

i. Inspect all joints, connections, gouges, bumps, bulges, obstructions, cracks, defects, and bungholes separately. All observations should be inspected thoroughly and consistently.

Measurements of observations should be clearly visible- first show the full tape, then focus on the specific number. Observations must be recorded per NASSCO PACP guidelines.

ii. All visible defects or obstructions, including dropped joints and illegal connections, shall be recorded and coded on the inspection. Use specific NASSCO defect codes.

iii. The Contractor shall provide all inspections, and inspection logs, in a digital PACP compliant database and compatible with the County’s existing GraniteNet software database system. Name the videos and inspection reports by the asset identification number and upstream/downstream structure IDs, when there are multiple pipe segments with the same ID. Reports shall also be submitted in a .pdf format.

iv. Ensure that the camera lens remains clean and the pipe is cleared and ventilated prior to inspection to capture clear video.

e. Pre-installation televised inspection shall occur no more than five working days prior to installation of the liner, or as otherwise directed by the County.

f. The Contractor shall notify the County if any access problems are discovered during the site visit or while televising that would prohibit the installation of the liner. If conditions such as broken pipe or major blockages are found that will prevent proper cleaning, or where additional damage would occur if cleaning is attempted or continued, the Contractor shall immediately advise the County.

g. The Contractor shall notify the County if pipe joint offsets greater than 20% of the interior diameter of the pipe are present. No liners shall be installed through joint offset greater than 20% of the interior diameter of the pipe, unless otherwise directed by County.

h. Post-installation televised inspections shall proceed only after all necessary work and preparation has been completed, including the following: installation of CIPP liner in accordance with specifications, continued maintenance of adequate flow control; and the continued maintenance of traffic control measures in accordance with these specifications. In the case of bellies in the line, the pipe shall be cleared of any standing water to provide continuous visibility during the post

PAGE 33 43 00 - 9

inspection. The finished liner shall be free of significant visual defects, damage, deflection, folds, wrinkles, holes, leaks and other defects.

i. Any damage done by the Contractor to any existing pipe or structure will be immediately repaired to a condition equal to or better than its original condition at the Contractor’s expense.

j. All material removed from the pipe shall be the Contractor’s responsibility for prompt disposal in accordance with all regulatory agency requirements.

5. ILLEGAL CONNECTIONS

a. The Contractor is required to report any observed illegal connections to the County. Illegal connections may result in the need for repairs to be made by the Contractor, the County, or others prior to lining commencement.

6. LIFTING OR REPLACEMENT OF STRUCTURE LIDS

a. The Contractor may be required to lift structure lids in the event that no manhole or other access is available. This work will be allowed upon prior authorization by the County.

b. The Contractor shall remove structure lids with due care and precaution so that the lids may be re-installed at same location without damage. Structure lids damaged by the Contractor will be required to be replaced in kind at the Contractor’s expense.

c. At times, structure lids may have existing damage that prevent them from being removed without further damage. The Contractor shall identify these instances prior to removal. Upon agreement by the County, these lids shall be removed and replaced with new lids.

7. LINER INSERTION

a. Installation of CIPP shall proceed only after all necessary preparation has been completed, including the following: all affected residences and businesses have been notified in accordance with these specifications; pre-installation televised inspection performed; implementation of adequate flow control; and the placement of traffic control measures in accordance with specifications.

The Contractor shall obtain all field measurements required to properly size the liner for installation. The proposed liner shall be sized to provide for a tight fit to the inside circumference of the host pipe and extend sufficiently from structure to structure. Liner shall be installed in strict accordance with methods and requirements of ASTM F-1216 and of the liner manufacturer. Liner shall be free of irregularities, pinholes, tears, cracks, excessive wrinkling and sealed to eliminate any possibility of infiltration at the structure wall.

b. The Contractor shall notify the County immediately if the lining process is delayed and will cause continued service interruption to customers affected by the lining operation. In this situation, the Contractor shall be responsible for taking steps necessary to provide a bypass operation, satisfactory to the County, for the affected properties at no additional cost to the County.

PAGE 33 43 00 - 10

c. Pressure requirements: Before the curing begins, the pressure required to hold the flexible tube tight against the existing conduit, and the maximum allowable pressure so as not to damage the tube, shall be specified by the tube manufacturer and provided to the County for each pipeline segment.

d. Once the cure has started, the required pressure shall be maintained until the cure has been completed. Should the pressure deviate from the manufacturer’s specified range by more than

2.3 feet of water (1 psi) for more than five (5) continuous minutes, the Contractor shall immediately notify the County and submit the pressure log and the manufacturer’s written evaluation; the County may require repair, replacement, or removal of the installed tube

e. Prior to installation and as recommended by the manufacturer, temperature sensing devices, such as thermocouples, shall be located between the existing pipe and the CIPP lining to ensure complete cure of the entire wall thickness. Liner and/or host pipe interface temperature shall be monitored and logged during curing of the liner.

f. Curing shall be accomplished by utilizing the appropriate medium (water or steam) in accordance with the manufacturer’s recommended cure schedule. The curing source or input and output temperatures shall be monitored and logged during the cure cycles. The manufacturer’s recommended cure schedule shall be used for each line segment installed.

g. The Contractor shall cool the CIPP in accordance with the approved manufacturer’s recommendations.

h. Temperatures and curing data shall be monitored and recorded, by the Contractor, throughout the installation process to ensure that each phase is achieved as approved in accordance with the CIPP System manufacturer’s recommendations.

i. The installed CIPP shall be continuous over the entire length of lined section and be free from visual defects such as foreign inclusions, dry spots, pinholes, major wrinkles and de-lamination.

No infiltration shall be observed.

j. Contractor shall submit an inversion and cure record report for each liner at the end of each day.

This record shall include location, from & to manhole numbers, direction of inversion, date, time, pressure and temperature throughout the entire inversion and curing process for each liner.

k. Contractor shall perform testing in accordance with ASTM F1216:

i. The preparation of a CIPP sample is required for each continuous section of liner.

Additional payment will not be made for sample acquisition, testing and re-testing when required.

ii. For pipes 18” or below, cut the sample from a section of cured CIPP at the termination point or other County-approved location. The sampling approach outlined in subsection

iii. may be used where access is limited. Limited access determinations shall be made solely by the Engineer.

PAGE 33 43 00 - 11

iii. For all other pipes, sample shall be taken from the tube and the resin/catalyst system used and cured in a clamped mold placed in the downtube when circulating heated water is used and in the silencer when steam is used.

iv. All samples shall be large enough to provide a minimum of five specimens for testing.

Testing shall include:

1 Short-Term Flexural (Bending) properties in accordance with Test Methods D790 and should meet the requirements stated within this section.

2 CIPP wall thickness in accordance with ASTM F1216. Average thickness should be calculated using all measured values (minimum of 8) and said average thickness shall meet or exceed the design thickness outlined in previously approved calculations. Minimum wall thickness at any point shall not be less than 87.5% of the design thickness outlined in previously approved calculations.

a CIPP wall thickness shall provide a millimeter measurement to the nearest

0.01 mm.

8. WATER & WASTE DISPOSAL

a. Contractor shall collect all cleaning water, CIPP processing and cure water, including water used for inversion or circulation and any steam condensate. No cleaning water, cure water, condensate, resin byproducts, or debris shall be discharged to storm drains, catch basins, surface waters, unpaved ground, or the MS4 at any time.

b. All water used for this contract, including CIPP liner cure water, shall be disposed of in accordance with agency regulatory requirements.

c. The Contractor must submit a cure water plan to include estimated volumes, cooling methods, discharge location, containment procedures, and spill response measures for County review and approval.

d. Water may be discharged into Pinellas County sanitary sewer collection system provided the following:

i. Coordination of the timing of discharge is coordinated with and allowed by the Pinellas County Utility Plant Operations Division Director (or designee) in writing.

ii. Discharged water meets or exceeds regulatory standards for discharge into sanitary sewer systems.

iii. The disposal water is less the 100 degrees Fahrenheit at time of discharge.

iv. Denial of discharge shall also be provided in writing.

e. When Pinellas County Utilities, job conditions, contamination, or environmental conditions prohibit the disposal to sanitary sewer, requiring alternate water disposal locations, the Contractor shall secure the disposal location and provide notice to the Engineer. The method and location of

PAGE 33 43 00 - 12

disposal shall be the responsibility of the Contractor. This work requires concurrence from the County.

f. Waste and debris disposal shall be performed in accordance with Section 3.05 of Pinellas County Utility Specification 33 01 32 - Sanitary Sewer Cleaning and Televising.

9. STRUCTURE CONNECTIONS

a. A compression hydrophilic end seal gasket compatible with the installed CIPP liner shall be installed at each manhole connection. When hydrophilic gaskets come in contact with water, they swell to create a compression seal gasket fit between the host pipe and the newly installed CIPP liner at the manhole connection. Because of inconsistencies during application of chemical grout, hydrophilic caulks or hydrophilic paste, these sealing attempts are not an acceptable alternative.

Acceptable end seals are Insignia™ seals or approved equal.

b. Cost associated with structure connections shall be included in the unit price for CIPP liner installation established in the bid schedule.

10. INTERNAL PIPE POINT REPAIRS

a. Internal pipe repairs shall be made by the rehabilitation of short lengths of pipeline by the installation of a resin impregnated flexible tube, forming a hard, impermeable corrosion resistant pipe within a pipe. When cured, the finished pipe will be formed to the original conduit.

b. Internal Point Repair is a non-disruptive method for repairing localized structural problems in pipeline. This point repair method rehabilitates damaged pipe without excavation.

c. The Contractor shall perform internal pipe point repairs by utilizing CIPP partial liner systems. All CIPP liners used for internal pipe point repairs shall meet or exceed specifications for full-length CIPP pipe liners.

d. The minimum length of partial CIPP liners used for internal pipe point repairs shall be 3 feet.

11. EXTERNAL STORM PIPE POINT REPAIRS

a. External pipe repairs shall be made by the Contractor to prepare the pipe segment for rehabilitation.

b. External pipe repairs shall be done by removing and replacing existing pipe with a new culvert measuring at least 8-foot in length. Culvert material shall be PVC or reinforced concrete pipe (RCP) in accordance with County specifications.

c. Newly installed culvert segments shall be connected to existing segments utilizing concrete jackets per FDOT Standard Plans Index 430-001.

d. Contractor shall construct all necessary storm sewer point (spot) repairs required to accomplish full cross-sectional area pipe lining. All excavation and storm culvert installation shall be performed in accordance with County specifications.

PAGE 33 43 00 - 13

e. The unit price for point repairs shall include the restoration required to bring the disturbed limits back to original or better condition. All restoration is assumed to occur in non-roadway areas. Any roadway, base material, curb, gutter, asphalt, concrete pavement, or other roadway related items required for external point repairs will be paid under unspecified work in accordance with the contract documents.

f. Restoration items included in the cost for external point repairs includes all labor, equipment, materials, and installation, bypass pumping, basic traffic control, sidewalk, driveway replacement (concrete and asphalt, per County details), landscaping, testing, underdrain, all other utilities, fences, sprinkler systems, disposal of debris, sod and grading including fill material.

g. External storm pipe repairs shall follow all standard County specifications for excavations and restorations per Pinellas County specifications.

h. The minimum length of external pipe point repairs shall be 8 feet.

12. JOINT REPAIRS BY INJECTION

a. Joint Repairs by injection shall use chemical grout as specified herein is a long-term cost-effective soil sealing process to protect against infiltration and exfiltration voids at the point of leakage in otherwise structurally sound storm sewer systems and may be used to stop leaks in manholes and related areas. Chemical grouting is not to be considered a structural repair.

b. Joint sealing shall be accomplished by forcing chemical sealing materials into the infiltration point through a system of tanks, pumps, hose system, mixing chamber and packer. The chemical grouting equipment and material shall have the ability to seal pipeline joints.

c. Jetting or driving pipes from the surface that could damage or cause undermining and excavation shall not be permitted.

d. Contractor shall supply all labor, materials, tools and equipment, including pumps, containers, hoses, gauges, packers, drills, bits, scaffolds, compressors, generators, vacuums, accessories and all other items required for the joint repair by injection.

13. TRAFFIC CONTROL AND MAINTENANCE OF TRAFFIC

a. The Contractor shall implement a Maintenance of Traffic Plan in accordance with Section 102-

1000.

14. CIPP REPAIR/ REPLACEMENT

a. Occasionally installation will result in the need to repair or replace a defective CIPP. The Contractor shall outline specific repair or replacement procedures for potential defects that may occur in the installed CIPP. Repair/replacement procedures shall be as recommended by the CIPP system manufacturer and shall be submitted to the County.

b. Defects in the installed CIPP that will not affect the operation and long-term life of the product shall be identified in the submitted repair/replacement procedures and are subject to written acceptance by the County.

PAGE 33 43 00 - 14

c. Repairable defects that occur in the installed CIPP shall be repaired at the Contractor’s expense.

The repair method and plan shall be specifically defined by the Contractor based on manufacturer’s recommendations, including a detailed step-by-step repair procedure, resulting in a finished product meeting the requirements of these contract specifications.

d. Un-repairable defects in the installed CIPP shall require the complete removal and replacement of the CIPP liner. The Contractor shall provide the method and plan for the CIPP removal and replacement based on the manufacturer’s recommendations.

15. SAFETY

a. The Contractor is responsible for meeting all safety precautions required or recommended by the product manufacturer to protect workers, the public and the environment.