Appendix_4_-_Special_Notices.pdf
PDF 167 KB Posted
- Attached to
- FY27-FY29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract
- Solicitation number
- 27-0039-ITB-C
- Issued by
- Pinellas County, Florida
About this file
This document is Appendix 4 - Special Notices for Pinellas County Public Works' FY27-FY29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract in Florida. The County is seeking three qualified contractors to provide as-needed CIPP lining and similar work order construction services for stormwater infrastructure rehabilitation, with additional services including pipe cleaning and inspections. The contract will establish a multi-year framework agreement spanning fiscal years 2027 through 2029, with work orders issued on an as-needed basis to support the County's ongoing stormwater infrastructure rehabilitation program.
The special notices section addresses critical administrative and compliance requirements applicable to all bidders and potential contractors. This appendix outlines mandatory notices, special conditions, and regulatory compliance obligations that contractors must acknowledge and adhere to throughout the procurement and contract performance periods, ensuring all selected contractors meet the County's operational, legal, and regulatory standards for public works projects.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL NOTICES
Contract No. 27-0039-ITB-C
FY2027-FY2029 Stormwater Cured-In-Place-Pipelining (CIPP) Rehabilitation Work Order
Contract
In Pinellas County, Florida
AWARD:
It is the intent of Pinellas County to accept bids from qualified contractors to provide as-needed services. Such services are to be ordered as and when requested by Pinellas County. The estimated quantities shown on the pricing proposal (schedule of values) shall be used as the basis for award. Pinellas County does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each item bid. The pricing/unit costs submitted by the Contractor will determine the line pay item unit costs over the duration of the contract. The Contractor’s total bid amount will be used to determine the low bidder(s). The total contract bid award will not exceed $8,750,000.00.
ASSIGNMENT OF WORK:
All work issued under the resulting contract shall be on an as-needed basis. Authorization to begin the work shall be in the form of a Work Order at the written request of the County.
Execution of this contract shall not be construed as a guarantee of work. The County reserves the right to issue Work Orders under this contract to one or more Contractors at the County’s sole discretion.
The Contractor shall perform no work under this Contract without the County’s written authorization to proceed for each Work Order in the form of Attachment No. 1, included with this Special Notice. The Contractor hereby agrees to waive any claim for compensation for any work performed without authorization.
No single project shall exceed $300,000.00. If an estimate or quotation for any single project under this contract exceeds $300,000.00, the Contractor shall not submit an estimate or quote or reveal their pricing but inform the County that the estimate or quotation would exceed $300,000.00. A separate bidding process will be required for all projects exceeding $300,000.00.
All work shall be performed in an expeditious and professional manner. The Contractor shall have sufficient crews and equipment to perform all work, including restoration, at the time the Work Order is assigned. The inability of the Contractor to meet contractual obligations, or to perform assigned work in a satisfactory manner, shall be grounds for termination of the Contract, and/ or reassignment of the work for construction by others. The County reserves the right to add or delete sites and project locations from the Work Orders. There are no guaranteed Work Order locations. The Contractor shall only be compensated for that work satisfactorily completed. There will be no compensation to the Contractor for cancellation of the Contract or for any assigned work that is not satisfactorily constructed and accepted by the County.
All liners shall be installed by the inversion method (ASTM F1216-09) and cured with steam or water. Pre & post National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) video inspections are required for each line segment. All video inspections shall be delivered in electronic file format compatible with GraniteNet, latest edition. All video inspections shall be reviewed/certified by the Contractor as meeting the NASSCO standards and delivered to the County no later than fifteen (15) days after completion of liner installation. The successful bidder’s method for installation of CIPP shall meet these requirements and provide submittal meeting this requirement.
The Contractor will submit a monthly itemized invoice for approval and payment together with an affidavit stating all bills for labor or materials or appliances in connection with the particular project have been paid. Request for payments shall be made in the format as shown on the application for payment form.
Each individual location or line segment contained in a Work Order is to be considered an “individual project”. For work that includes lining, all work at that location, including but not limited to cleanup, lateral reinstatement, grouting and sealing, and post PACP inspection video and report must be fully completed before it can be considered for payment; there will not be any partial payments for individual projects. At the completion and acceptance of each individual project or line segment, payment can be made in full for that assignment.
NOTIFICATION:
The Contractor shall inform the County, on a daily basis, of the work areas being performed.
The Contractor shall provide a fax or email, no later than 8:00 AM, of a worksheet outlining the limits of the road segment to be worked that day so that the County may inspect and tentatively approve of the work quality being accomplished. When the Contractor has completed a road segment, the County shall be notified by email. Upon such notification, a final inspection of the work shall be made within 48 hours (holidays and weekends excluded) and the Contractor notified as to acceptance or rejection of work. In the event of unsatisfactory work, the Contractor shall be provided a “punch list” indicating the corrective measures necessary for approval of the work performed. The Contractor shall perform appropriate correction within thirty (30) working days. When the corrections have been made, the Contractor shall notify the County and a re-inspection will be made by the following business day (exception – holidays and weekends).
SPECIAL CONDITION, Subsection Submittals After Award, the term Preconstruction Conference shall mean review meeting prior to commencing each individual Work Order.
SCHEDULE
All work orders must be completed within 30 calendar days from issuance of the Work Order Form, unless a schedule modification is approved by the County.
INSURANCE AND INDEMNIFICATION:
The Contractor is advised if work is performed on local municipal roads or state roads in addition to unincorporated local roads, the Contractor shall indemnify and name as additional insured Pinellas County, as well as the FDOT and/or the appropriate municipality. Insurance requirements are shown in Insurance Section of the Invitation to Bid.
PRICE ADJUSTMENT OPTION:
This contract has a price adjustment option. Contractors must refer to the Invitation to Bid for further details. The list of pay items eligible for price adjustment are listed below.
431-400-0121 12" PIPE DIAMETER CIPP (9 MM)
431-400-0122
12" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0151 15" PIPE DIAMETER CIPP (9 MM)
431-400-0152
15" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0181 18" PIPE DIAMETER CIPP (9 MM)
431-400-0182
18" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0211 21" PIPE DIAMETER CIPP (9 MM)
431-400-0212
21" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0241 24" PIPE DIAMETER CIPP (10.5 MM)
431-400-0242
24" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0301 30" PIPE DIAMETER CIPP (13.5 MM)
431-400-0302
30" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0361 36" PIPE DIAMETER CIPP (13.5 MM)
431-400-0362
36" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0421 42" PIPE DIAMETER CIPP (13.5 MM)
431-400-0422
42" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0481 48" PIPE DIAMETER CIPP (15 MM)
431-400-0482
48" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0541 54" PIPE DIAMETER CIPP (18 MM)
431-400-0542
54" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0601 60" PIPE DIAMETER CIPP (21 MM)
431-400-0602
60" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0661 66" PIPE DIAMETER CIPP (21 MM)
431-400-0662
66" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0721 72" PIPE DIAMETER CIPP (22.5 MM)
431-400-0722
72" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
431-400-0841 84" PIPE DIAMETER CIPP (22.5 mm)
431-400-0842
84" PIPE DIAMETER - ADD/DEDUCT PER 1 MM INCREMENT
VARIANCE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM COMPLIANCE AND
EROSION CONTROL
1. NPDES Compliance for projects LESS THAN 1 acre of disturbed area:
a. Pursuant to the approved construction plans, the Prime Contractor shall properly install erosion and sedimentation control measures (Best Management Practices, “BMPs”) immediately prior to commencement and maintain during and after construction to prevent siltation and turbid discharges from entering county-maintained storm sewer, adjacent wetlands and surface waters at the project site. The BMPs shall remain in place until construction is complete, and County inspectors have determined the site to be stabilized.
b. Within 72 hours of establishing final grade at the project site, the Contractor shall stabilize exposed slopes to prevent erosion, siltation, or turbid run-off into waters of the State.
2. All projects with disturbed areas greater than 1 acre will require an NPDES Permit and are subject to all requirements thereof.
3. Erosion Control
Failure to properly install and maintain erosion and/or sedimentation controls or an illicit discharge resulting from their failure may result in fine citation. Sec. 58-239 of the Pinellas County Code authorizes penalties of up to $10,000 per offense. Chapters 62- 620 and 62-621 Florida Administrative Codes (F.A.C.) outline the procedures for obtaining and developing Best Management Practices Plan to ensure a violation of Chapter 62-302, F.A.C. does not occur.
a. Contractor shall comply with the Pinellas County Technical Specifications for Erosion and Sedimentation Control.
b. The Contractor shall follow the Stormwater Pollution Prevention Plan (SWPPP) and Erosion and Sediment Details wherever applicable. The SWPPP and Erosion and Sediment Details are provided in the plans. Erosion control is a performance-based measure, if the details in the plans do not meet the requirements of compliance in the field, it is on the Contractor to provide the resources to meet compliance.
c. See all additional requirements in the Invitation to Bid – Specifications.
ADDITIONAL INFORMATION AND STUDIES
The Contractor is responsible for all scheduling, coordination, and costs associated with any process water required to perform this work including: all temporary or hydrant water meter deposits, water meter relocation scheduling, cost of water, and water meter relocation fees.
ATTACHMENT No. 1 - WORK ORDER FORM
Work Order No.
Contract Name: Contract No.:
County Project ID No.: Contractor:
Date: Authorized Contractor Representative:
Funding Account:
Scope of Work including Project Limits:
The Pay Items below correspond to the Contract Bid Submittal Sheets.
Pay Item No. Pay Item Description Quantity Unit Unit Cost Total Cost Not-to-Exceed
Subtotal of Work Order: $ -
*Unspecified Work (If Applicable):
Not-to-Exceed Total Cost of Work Order: $ -
*Breakdown of Unspecified Work (If Applicable):
Duration of Work Order (consecutive Calendar Days):
Date of Commencement of Work Order:
Date of Completion for all Work issued under this Work Order:
Liquidated Damages applicable to this Work Order Yes: No:
Amount of Liquidated Damages per day and per the terms of the Contract:
The County and the Contractor agree that the Duration of Work Order and Not-to-Exceed Total Cost of Work Order as presented in this document constitutes a full and complete understanding of all Work to be completed, including all direct and indirect costs for equipment, manpower, materials, overhead, profit, goods and services, and that Work shall commence and be completed as specified within and in accordance with the Contract Documents.
Authorized Contractor Signature:
Name (Printed):
Title:
Date:
Pinellas County Signature (Project Manager):
Name (Printed):
Title: Pinellas County Project Manager
Date:
Pinellas County Signature (Construction Division):
Name (Printed):
Title: Pinellas County Construction Division
Date:
| APPENDIX_4_Special Notices |
| FY2027-FY2029 Stormwater Cured-In-Place-Pipelining (CIPP) Rehabilitation Work Order Contract |
Attachment 1 - Work Order Form
File details come from the government source that posted it. Updated .