SPECIAL_PKG.pdf
PDF 74 KB Posted
- Attached to
- Remanufacture of B-52 Jet Engine Fuel Pump
- Solicitation number
- FA811825Q0006
About this file
This Special Packaging Instruction (SPI) document provides detailed packaging and marking requirements for fuel devices with residual fuel, specifically for the B-52 Jet Engine Fuel Pump. The document outlines critical handling instructions, including preservation methods per MIL-STD-2073, cleaning and drying specifications, and special markings. A prominent caution note emphasizes that items containing residual fuel are considered hazardous materials and must be packed according to appropriate hazardous material regulations by certified personnel.
The packaging instructions specify requirements for container identification, barrier bags, and absorbent materials, with tolerances and sizes to be determined as required. Key notes include provisions for items that have been drained but may still contain residual fuel, mandating packaging with leak-proof liners and absorbent materials in a strong outer container. The document is marked as Controlled Unclassified Information (CUI) and is controlled by 406 SCMS at GULAA-Tinker AFB, with distribution/dissemination control assigned to FEDCON.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8118-25-Q-0006.pdf | ||
| CAV_AF.pdf | ||
| SOW.pdf | ||
| TRNSP_DATA.pdf | ||
| PKG_RQMT.pdf | ||
| GFP_ATTACHMENT.pdf | ||
| CDRL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .