SPEC_4_MBTA_Composite_Tie_Turnout_Procurement_Package_092226.pdf

PDF 15 MB Posted

Attached to
IFB 131-26 Widett Layover Facility-MBTA Composite Tie Turnout- F60PS01
Solicitation number
BD-27-1206-40000-40000-134158
Issued by
Suffolk County, Massachusetts

About this file

MBTA Composite Tie Turnout Procurement Package Summary

This is a procurement specification document issued by the Massachusetts Bay Transportation Authority (MBTA) for the procurement of composite tie turnout systems. The specification outlines the technical requirements and performance standards for composite ties designed for use in railroad turnout (switch) applications on the MBTA rail network. The procurement package details specific material composition requirements, mechanical properties, dimensional specifications, and quality assurance standards that composite tie suppliers must meet. The document establishes performance benchmarks including load-bearing capacity, durability under dynamic loading conditions, environmental resistance, and compatibility with existing MBTA track infrastructure. The specification requires suppliers to demonstrate compliance through testing protocols, manufacturing certifications, and field performance data from comparable applications.

The procurement specification establishes quality control requirements, inspection procedures, and acceptance criteria for composite tie products. Suppliers must provide documentation of material certifications, manufacturing process controls, and test reports validating performance against MBTA standards. The specification addresses installation requirements, maintenance protocols, and warranty provisions for composite tie components. Pricing and contract term information, specific quantities required, delivery schedules, and award timelines are not detailed within this specification document, as it functions as a technical requirements guide rather than a formal request for proposals. This specification supports the MBTA's infrastructure modernization objectives by establishing clear technical standards for alternative tie materials that offer extended service life and reduced maintenance compared to traditional wooden ties.

View the file

Other files

File Type Posted
MBTA Minimum Insurance Requirements v3 November 2017~1.dotm DOTM file
131-26 COMMBUYS - IFB Non Fed GoodsServices Template_2023.08.24.docx DOCX document
IFB 131-26 Addendum 1.docx DOCX document
IFB 131-26 Addendum 2.docx DOCX document
PS_REQUISITIONS_2026-10-05_15.22.01.000000.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .