Attachment F DLA Energy Clauses.pdf
PDF 207 KB Posted
- Solicitation number
- SPE605-20-R-0209
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS/SOLICITATION
AGADEZ SPE605-20-R-0209
ATTACHMENT – F
F1.01-1 DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND TANK WAGON
(DLA ENERGY JAN 2012)
IMPORTANT NOTE on EPA TESTING OF UNDERGROUND TANKS. If the "volumetric" method is used for annual EPA testing of underground tanks, the "topping off" of tanks for this test is outside the scope of DLA Energy requirements contracts.
(a) F.O.B. ORIGIN. On items calling for delivery at Contractor's refinery, terminal, or bulk plant f.o.b.
transport truck, truck and trailer, or tank wagon—
(1) Supplies ordered hereunder shall be delivered, at Contractor's expense, into equipment specified in the Schedule.
(2) Unless otherwise specified in the Schedule, all deliveries shall be made on the day specified in the delivery order unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.
(b) F.O.B. DESTINATION. On items calling for delivery f.o.b. destination by means of transport truck, truck and trailer, or tank wagon--
(1) The Contractor shall not be required to deliver by transport truck or truck and trailer a quantity less than a full load nor into more than one storage tank, with the following exceptions:
(i) An order placed under an item of this contract calling for delivery by transport truck of motor gasoline, fuel oil, diesel fuel, or kerosene, or, if this procurement is for Central America only, jet fuel, may require delivery of a quantity as low as 5,200 gallons whenever the activity is restricted either by a tank capacity or by a directive from receiving a larger quantity; and
(ii) Where the Schedule provides for multiple drop deliveries, the Contractor may be required to deliver into more than one storage tank. Where truck and trailer is the method of delivery specified, the Contractor may, at its option, make delivery by transport truck. In the case of deliveries in Alaska, where truck and trailer or transport truck is the method of delivery specified, the Contractor may, at its option, make delivery by tank wagon.
(2) Unless otherwise specified in the Schedule, all deliveries shall be made on the day specified in the delivery order unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.
(3) The Contractor shall not be required to deliver by tank wagon a quantity of less than 575 liters (or 150 gallons) but, at the Government's option, may be required to deliver into more than one storage tank.
(4) When delivery is made by tank wagon, such wagon shall be equipped with pump, meter, and a minimum of 100 feet (30 meters) of hose. Where delivery is made by transport truck or truck and trailer, such delivery equipment shall be equipped with a minimum of 15 feet of hose.
(5) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility, the Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.
(6) Unless otherwise provided in the Schedule, free time for unloading trucks, transport trucks, or trucks and trailers shall be unlimited.
(7) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility—
(i) The Contractor shall provide properly maintained delivery equipment and properly trained delivery personnel to reasonably assure that delivery can be made without damage to vegetation and asphalt pavement adjacent to storage facilities being filled. The Contractor’s delivery personnel who have not exercised reasonable care and delivery equipment that is poorly maintained may be refused entrance to the installation by the installation Commander.
(ii) The Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.
F1.09-2 DETERMINATION OF INVOICE QUANTITY (PC&S) (DLA ENERGY JAN 2012)
(a) QUANTITY. The quantity of supplies furnished under this contract shall be determined as follows:
(1) F.O.B. DESTINATION.
(i) DELIVERIES BY TANKER OR BARGE.
(A) On items requiring delivery on an f.o.b. destination basis by tanker or barge, the quantity shall be determined on the basis of--
(1) Calibrated meters on the receiving tank system; or
(2) Receiving tank measurements.
(B) All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(ii) DELIVERIES BY RAIL TANK CAR.
(A) On items requiring delivery on an f.o.b. destination basis by rail tank car, the quantity of supplies furnished under this contract shall be determined (at the Government’s option) on the basis of--
(1) Calibrated meter on the receiving tank system;
(2) Weigh, using calibrated scales at the receiving location; or
(3) Receiving tank measurements.
(B) All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(iii) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.
(A) If the narrative requires a tank wagon (which is always equipped with a meter), that meter shall be used to determine quantity at time of delivery. The quantity shall be read directly from the meter. On items requiring delivery on a f.o.b.
destination basis by tank truck or truck and trailer, quantity shall be determined in the following order of preference:
(1) Calibrated meter on the receiving tank system
(2) Calibrated meter on the conveyance
(3) Weight using calibrated scales at the receiving location.
(4) Loading rack meter ticket. The ticket must be generated at the time of loading and be based on a calibrated loading rack meter. The loading rack ticket shall be mechanically annotated with the gross and net gallons (or gross and net liters), the observed and corrected API gravity (or density), and the temperature at which the product was measured.
(5) Receipt tank measurements (as identified in the Schedule).
(B) All quantities, other than delivery by tank wagon, shall be converted, either mechanically or manually, to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(C) If a loading rack meter ticket is used to determine quantity for a biodiesel blend, the quantity shall be converted to net (volume corrected) gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius). The Contractor shall prepare separate loading rack meter tickets for the diesel portion and for the biodiesel blend stock B100 (the industry designation for pure biodiesel), hereinafter referred to as the B100 portion of the load. The B100 loading rack meter shall be recorded at gross (ambient) temperature when the loading meter is not capable of providing a net (volume corrected) quantity. The total shall be the sum of the net diesel and gross B100. When the B100 loading rack meters are capable of providing a net (volume corrected) quantity, the total receipt quantity shall be the sum of the net diesel and the net B100.
(2) F.O.B. ORIGIN. All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(i) DELIVERIES INTO TANKER OR BARGE. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tanker or barge, the quantity shall be determined (at the Contractor's option) on the basis of--
(A) Calibrated meter; or
(B) Shipping/shore tank measurement.
(ii) DELIVERIES INTO RAIL TANK CAR. On items requiring delivery at the Contractor’s refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor’s option) on the basis of--
(A) Certified loading rack meter;
(B) Weight, using calibrated scales; or
(C) Certified capacity tables for the rail tank car.
(iii) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.
(A) On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of--
(1) Calibrated loading rack meter;
(2) Weight, using calibrated scales; or
(3) Certified capacity tables of the conveyance loaded.
(B) WATER BOTTOMS.
(1) Every delivery must be free of all water bottoms prior to discharge; and
(2) The Contractor is responsible for their removal and disposal.
(b) MEASUREMENT RESTRICTIONS. All methods of measurements described in this contract text are subject to government safety and environmental restrictions, foreign or domestic. Such restrictions may prohibit, or render ineffective, a particular method in some cases.
(c) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the United States, other technically equivalent national or international standards may be used. Certified capacity tables shall mean capacity tables prepared by an independent inspector or any independent surveyor to the aforementioned measurement and calibration standards. In addition, the following specific standards will be used as applicable:
(1) API MPMS Chapter 11.1, Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils (this chapter is an adjunct to ASTM D 1250, IP 200 and ISO 91-1). Either the 2004 or 1980 version of the standard may be used. Either the printed tables (an adjunct to the 1980 version) or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine and the 2004 version of the standard will be the referee method.
(i) For crude oils, JP4, and Jet B, use Volume I, Tables 5A and 6A; Volume VII, Tables 53A and 54A; or Volume IV, Tables 23A and 24A.
(ii) For lubricating oils, use Volume XIII, Tables 5D and 6D; Volume XIV, Tables 53D and 54D; or Tables 23D and 24D (2004 version).
(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B; Volume VII, Tables 53B and 54B; or Volume V, Tables 23B and 24B.
(iv) For chemicals/additives, use Volume III, Table 6C (or Volume IX, Table 54C) or volume correct in accordance with the product specification.
(v) Volume XII, Table 52, shall be used to convert cubic meters at 15 degrees Celsius to barrels at 60 degrees Fahrenheit. Convert liters at 15 degrees Celsius to cubic meters at 15 degrees Celsius by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be used.
(vi) As an option to (c)(1)(v), liters may be converted to gallons using Table F1.09A (see below). If this option is used, it must be agreed upon by both parties and shall remain in effect for the duration of the contract. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.
(vii) If the original measurement is by weight and quantity is required by U.S. gallons, then--
(A) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.
(B) Volume XII of the adjunct to ASTM D 1250, Table 58, shall be used to convert metric tons to U.S.
gallons at 60 degrees Fahrenheit.
(2) API MPMS Chapter 4, Proving Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent. A meter calibration log/calibration certificates shall be maintained which, as a minimum, contains--
(i) Number/name of each meter;
(ii) Calibration frequency;
(iii) Date of the last calibration;
(iv) Due date for next calibration;
(v) Name and signature of the person performing the calibration;
(vi) Traceability to master meter/prover used for calibration; and
(vii) Calibration report number.
Each meter shall be marked with the date of the last calibration and due date for the next calibration. All calibration meter recordings and logs/certificates shall be kept on file and made available upon request. All calibration records (including logs or certificates) shall be retained on file for a period of three years.
(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter. Outside the U.S., use of tank shell correction factor is not required unless its use is a customary practice for custody transfer.
TABLE F1.09-2A
CONVERSION FACTOR TABLE
Density @ 15°C
Gallons @ 60°F to Liters @ 15°C, Multiply by
Liters @ 15°C to Gallons @ 60°F, Multiply by
0.723 – 0.768 3.78286 0.264350
0.769 – 0.779 3.78309 0.264334
0.780 – 0.798 3.78334 0.264317
0.799 – 0.859 3.78356 0.264301
0.860 – 0.964 3.78381 0.264284
0.965 – 1.074 3.78405 0.264267
(d) SHIPPING DOCUMENTATION. The following information shall be mechanically annotated on the contractor’s shipping document (such as a truck’s metered ticket) when the document is used to determine quantity under this contract: gross and net quantity (gallons or liters, as required), observed and corrected API gravity/density, and the temperature (Fahrenheit or Celsius) at which the product was measured.. The following exceptions apply:
(1) Where government documents are the sole basis for payment, such as DD Form 250/250-1s, the information is not required.
(2) Where conveyances with temperature-compensating meters are used, the shipping document shall only be annotated with the corrected API gravity/density, the net quantity, and a statement that a temperature-compensating meter was used to determine net quantity.
(3) Where volume correction for temperature is not required in accordance with Paragraph (a)(1)(iii)(B) above, the shipping document shall be only be annotated with the API gravity (or density), gross quantity, and a statement that volume correction was not required.
(e) RIGHT TO REPRESENTATIVE. For f.o.b. origin deliveries, the Government has the right to have a representative present to witness the measurement of quantity. For f.o.b. destination deliveries, the Contractor has the right to have a representative present to witness the delivery and measurement of quantity.
(f) DISCREPANCIES . For f.o.b. destination deliveries utilizing volume corrected loading rack meter tickets to determine quantity:
(1) The quantities shown on the shipping document (volume corrected loading rack meter tickets) will be accepted as the quantity received, provided that any differences between that quantity and the Government’s receipt tank measurement at destination does not exceed one half of one percent (0.5%) of the amount on the shipping document.. If the difference is greater than one half of one percent (0.5%), the quantity determined by the Government using receipt tank measurements at destination will be used for acceptance and payment provided receipt tank measurements are identified in the Schedule as an approved quantity determination method for that line item. Quantity measurements using the methods specified in section (a)(1)(iii)(A) (1-
3) above will be used for acceptance and payment regardless of any discrepancy with a loading rack meter ticket.
(2) If, the Government’s receipt tank quantity measurement varies by more than one half of one percent (0.5%) from the Contractor’s quantity measurement, the parties may conduct a joint investigation) of the variation in order to identify the cause of the discrepancy. Any quantity discrepancy that cannot be settled by the parties and results in a dispute shall be resolved under the Disputes provisions of the contract.
F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY) (APR 2014)
(a) Contractor Registration. Contractors must register in DIBBS to obtain a login account at https://www.dibbs.bsm.dla.mil. The login account will allow a contractor to register a primary and alternate email address for notifications. Contractors are strongly encouraged to establish a group email address for the primary email address for the contractor’s authorized point of contacts. The registered email addresses will be the only email used by the government to make notifications.
(b) All contractors must have an active System for Award Management (SAM) account, http://www.sam.gov in order to register for DIBBS.
(c) The Contractor shall use DIBBS to receive orders. DLA Energy will not be using DIBBS receipt of quotes capability. All quotations, proposals, bids shall be submitted in accordance with the terms and conditions of the solicitation.
(d) Preparation and Transmission of Orders
(1) The Government may issue an order for a specific delivery or a series of deliveries (e.g., several deliveries during a week). The Government may also elect to issue an order covering a longer period (including monthly orders) and make periodic calls against these orders designating specific delivery dates, times, and quantities.
(2) Only a DLA Energy warranted Contracting Officer can issue an order, either orally or in writing, against a contract. An oral order issued by the warranted Contracting Officer shall provide the required advance notice to the Contractor and the following information: Interim order number; contract number; item number;
ceiling price; quantity; delivery location; and the required delivery and/ or service date.
(i) For all product orders, the Contractor will receive an electronically signed written order via DIBBS, within 24 hours or one business day after the warranted Contracting Officer issues an oral order.
(ii) For all service orders, the Contractor will receive an electronically signed written order via DIBBS, within five business days after issuing the oral order.
(iii) Interim order number is subject to change once the electronically signed written order is received by the contractor. The order number on the written order will take precedence over the interim order number, if different.
(iv) Regardless of the unit price cited on the written order, the office designated to make payments on the written order will pay the applicable unit price in effect under the terms and conditions of the contract.
(v) Once the order has been issued, an email will be sent to the Contractor to provide notice that the order is available on the contract-specific web page. The order will also be submitted to the payment office.
(3) Calls against previously issued orders must be confirmed in writing within 24 hours or one business day via email message. The email confirmation will reference the previously issued order number and item number and designate specific delivery location, dates, and quantity to be delivered against that order.
(4) The Contractor’s nonreceipt of a written or electronic confirmation of an oral order or oral call against a written or electronic order does not relieve the Contractor from its obligation to perform in accordance with the oral order or oral call against a written or electronic order. The Contractor should contact the DLA Energy Contracting Officer if problems are experienced with receipt of the electronic or written confirmation.
I209.09 EXTENSION PROVISIONS (DLA ENERGY JAN 2012)
(a) The Government shall have the right to extend this contract on the same terms and conditions one or more times for a total of no more than six months. Notice of contract extension will be furnished to the Contractor not later than 30 days prior to expiration of the contract ordering period or any extension thereof. Nothing in this contract provision precludes the Contractor from agreeing to an extension of the contract if the DLA Energy Contracting Officer fails to issue the notice prior to 30 days before the end of the ordering period.
(b) Extension of this contract shall be considered to have been accomplished at the time the DLA Energy Contracting Officer provides written notification to the Contractor.
M55 CONVERSION FACTORS (DLA ENERGY MAR 2007)
(a) This contract text applies to all products except lubricating oils.
(b) The offeror should use conversion factors that reflect its product characteristics and submit prices and transportation rates in the requested units. In the event prices or transportation rates are not submitted in the requested units, the following conversion factors based on an assumed density for the product will be used by DLA Energy in the evaluation of the offer.
(1) TABLE I.
One Imperial Gallon = 1.20095 U.S. Gallons at the same temperature One Liter = 0.264172 U.S. Gallons at the same temperature One Cubic Meter (1,000 liters) = 6.2898 Barrels at the same temperature One U.S. Barrel = 42 U.S. Gallons at the same temperature One Kilometer = 0.62137 Miles One Mile = 1.6093 Kilometers One Nautical Mile = 1.15 Statute Miles
(2) TABLE II.
DENSITY TYPICAL
PRODUCT @15oC @60oF
BARRELS PER GALLONS PER LITERS PER BARRELS PER GALLONS
PER
Kg/m3 API METRIC TON METRIC TON METRIC TON LONG TON LONG TON
AUTOMOTIVE
GASOLINE (ALL) 744.9 58.4 8.462 355.42 1342.46 8.598 361.12
AVIATION
GASOLINE (ALL) 716.3 66.0 8.801 369.66 1396.06 8.943 375.59
BURNER FUEL OILS
FUEL OIL NO. 1 812.8 42.5 7.753 325.61 1230.31 7.877 330.83
FUEL OIL NO. 2 846.9 35.5 7.440 312.49 1180.78 7.560 317.51
FUEL OIL NO. 4 914.2 23.2 6.891 289.44 1093.85 7.002 294.09
FUEL OIL NO. 5
LIGHT 954.2 16.7 6.602 277.27 1048.00 6.707 281.71
FUEL OIL NO. 5
HEAVY 960.7 15.7 6.557 275.39 1040.91 6.662 279.81
FUEL OIL NO. 6 976.6 13.3 6.450 270.90 1023.96 6.554 275.25
DIESEL FUELS
NO. 1 DIESEL (ALL) 818.9 41.2 7.695 323.17 1122.15 7.818 328.36
NO. 2 DIESEL (ALL)
& GAS OIL 839.3 37.0 7.507 315.30 1191.47 7.628 320.36
INTERMEDIATE FUEL OILS
IFO 180 965.3 15.0 6.526 274.09 1035.95 6.630 278.48
IFO 380 973.9 13.7 6.468 271.65 1026.68 6.572 276.01
JET FUELS
JP4/JET B 764.6 53.5 8.243 346.22 1307.87 8.376 351.78
JP5 819.9 41.0 7.686 322.80 1219.66 7.809 327.98
JP8/JET A1/F34/TS1 805.9 44.0 7.820 328.42 1240.85 7.945 333.69
JET A 814.2 42.2 7.739 325.04 1228.20 7.863 330.26
KEROSINES (ALL) 815.2 42.0 7.730 324.68 1226.69 7.854 329.88
MARINE GAS OIL 839.3 37.0 7.507 315.30 1191.47 7.628 320.36
NAPHTHA 731.1 62.0 8.623 362.16 1367.80 8.761 367.97
NAVAL DISTILLATE
FUEL (F76) AND
DFW (F75) 844.3 36.0 7.463 313.43 1184.41 7.582 318.46
(3) TABLE III.
ASSUMED DENSITY
PRODUCT 20 deg C/20 deg C g/mL lb/gal Kg/gal
FSII DIEGME 1.025 8.561 3.884
File details come from the government source that posted it. Updated .