This document is an amendment to solicitation SPE60422R0406 issued by the Defense Logistics Agency Energy for the supply of electricity and ancillary services. The amendment updates estimated quantities for various accounts, removes one account from firm-fixed pricing requiring locational marginal pricing instead, increases growth estimates for one account, amends pricing terms and notes, adds an account, and updates attachments. The solicitation is for a 24-month delivery period from December 2022 through December 2024 for all accounts in DC, IL, MD, NJ, OH, and PA totaling an estimated 4,877,387,127 kWh. Offerors must be on approved retail electric provider lists for the applicable states. The solicitation will be conducted as a request for proposal with the contract being either firm-fixed price or fixed-price utilizing locational marginal pricing.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE604 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60422R0406

X

2022 JUL 05

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

INSTALLATION ENERGY

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 3 PAGES

SPE60422R0406 - 0003

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

1. B1.08 SUPPLIES TO BE FURNISHED (ELECTRICITY) (DLA ENERGY APRIL 2022) Table has been amended to update Estimated Quantities for the following:

0018 - Johns Hopkins Applied Physics Laboratory - Increase from 11 to 12 accounts.

0018 - Johns Hopkins Applied Physics Laboratory - Increase from 57,427,632kWh to 59,068,967kWh.

0022 - MPO – Increase from 1,434,984,728kWh to 1,708,706,483kWh.

0034 - Argonne National Laboratory (On-Peak) – Increase from 211,756,652kWh to 296,452,397kWh.

0034 - Argonne National Laboratory (Off-Peak) - Increase from 336,713,027kWh to 607,365,886kWh.

TOTAL - Increase from 4,916,566,521kWh to 5,545,636,880kWh.

2. B1.08 SUPPLIES TO BE FURNISHED (ELECTRICITY) (DLA ENERGY APRIL 2022) (e) has been updated to reflect CLIN 0034 being removed from firm-fixes pricing and will now require LMP pricing.

3. B1.08 SUPPLIES TO BE FURNISHED (ELECTRICITY) (DLA ENERGY APRIL 2022) The following NOTE has been amended to reflect:

0022 - MPO - An estimated 6.6% annual growth beginning in October 2022. A 10.7% increase from 2022 will be expected beginning October 2023 (816,781,302kWh total). A 9.2% increase from 2023 will be expected beginning October 2024 (891,925,181 kWh total).

4. B1.08 SUPPLIES TO BE FURNISHED (ELECTRICITY) (DLA ENERGY APRIL 2022) (e) NOTE 2: is hereby amended to remove, "Firm Fixed Prices" and replaced with "Transaction Fees". Also replaced "The Fixed Energy prices are to be based on ComEd peak and off-peak period" and replaced with "All energy shall be based on the requirements of section B802 of this solicitation."

5. B1.08 SUPPLIES TO BE FURNISHED (ELECTRICITY) (DLA ENERGY APRIL 2022) (e) NOTE 4: is here by added for CLIN 0034.

"Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability, was issued on December 8, 2021. The EO requires the Government transition to 100% Carbon Pollution-Free Electricity (CFE) by 2030.

During the term of the contract, the contractor shall notify the site as soon as it becomes viable for them to deliver CFE; contractor must be willing to discuss and, if commercially possible for a reasonable price, deliver an agreed amount of CFE to the Government.

6. B802 LOCATIONAL MARGINAL PRICE (Electricity) (DLA ENERGY JAN 2009) NOTE: is hereby amended to include, "and CLIN 0034 ARGONNE National Laboratory"

7. B806CONTRACT PRICE CONVERSION (ELECTRICITY) (DLA ENERGY JAN 2012) NOTE: is hereby amended to include, "and CLIN 0034 ARGONNE National Laboratory"

SECTION J - LIST OF ATTACHMENTS

8. Attachment I – Installation Data Sheet A0003 has been updated to include additional account for CLIN 0018

9. Attachment IV - Argonne Requirements and Schedule - A0003.pdf, has been updated to remove "The Fixed Energy Prices are to be based on ComEd peak and off-peak periods and must include ALL PJM ancillary service and ISO related costs not identified in the Pass-Through Components.

Defined peak and off-peak hours are based on ComEd’s definition of Retail Peak Period and Retail Off-Peak Period in its terms and conditions. Retail Peak Period is defined as 9 AM to 10 PM, Monday through Friday, except on days designated as holidays by the NERC. Retail Off-Peak Period is defined as all hours other than those included in the Retail Peak Period." and now includes "The fixed price components requirements are laid out in B802 LOCATIONAL MARGINAL PRICE (Electricity)(DLA ENERGY JAN 2009)."

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES

SPE60422R0406 - 0003

SECTION J - LIST OF ATTACHMENTS

List of Attachments

Description File Name ATTACH_IDS Attachment I - Installation

Data Sheet A0003.xlsx ATTACH_Argonne Attachment IV - Argonne

Requirements and Schedule - A0003.pdf

ATTACH_Continuation_Pa ges

SPE60422R0406A0003.pdf

File details come from the government source that posted it. Updated .