SF 1449 Solicitation.pdf
PDF 761 KB Posted
- Solicitation number
- SPE60326R0518
- Issued by
-
Defense Logistics Agency Energy
About this file
This is a Standard Form 1449 (SF 1449) Solicitation/Contract/Order for Commercial Items issued by the Defense Logistics Agency (DLA) Energy for Government-Owned Contractor-Operated (GOCO) fuel storage services at DFSP Tampa, Florida. The solicitation number is SPE60326R0518, with an issue date of May 21, 2026, and an offer due date of July 6, 2026 at 3:00 PM local time. The contracting officer is Candice Ekwoge, and the contract is 100% unrestricted (not set aside for small business). The requirement is for petroleum storage facilities and services for receiving, protecting, storing, and shipping U.S. Government-owned Turbine Fuel Aviation, Grade Jet-A. The base performance period runs from November 4, 2026, through November 3, 2030 (four years), with a five-year option period from November 4, 2030, through November 3, 2035, and an additional option to extend services for up to six months through May 3, 2036. The contract will be administered by DLA Energy at Fort Belvoir, Virginia, with FOB Destination terms.
The solicitation incorporates comprehensive contract clauses covering inspection and acceptance, quality assurance, contractor personnel security requirements, compliance with federal regulations including Buy American provisions, labor standards, environmental protection, and restrictions on inverted domestic corporations and debarred subcontractors. Key requirements include maintaining petroleum storage tanks with positive water sumps, performing weekly water drainage, providing sampling and testing of petroleum products per ASTM standards, maintaining security and fire protection measures, and submitting payment requests and receiving reports through the Wide Area Workflow (WAWF) system. The contractor must also prepare and submit approved Spill Prevention Control and Countermeasure Plans, Oil Pollution Prevention Operations Manual, and Oil Spill Contingency Plans within 60 days of award. Contractor personnel working at federally-controlled facilities must meet security clearance requirements beginning with an initiated National Agency Check with Written Inquiries (NACI) and favorable FBI fingerprint check.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 7014184509
1. REQUISITION NUMBER
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
SPE603-26-R-0518
5. SOLICITATION NUMBER
2026 MAY 21
6. SOLICITATION ISSUE
DATE
Candice Ekwoge DCE0038
a. NAME
Phone: 445-737-1970
b. TELEPHONE NUMBER (No Collect calls)
2026 JUL 06
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY CODE SPE603
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
USA
10. THIS ACQUISITION IS 100UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
8 (A)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
493190NAICS:
36.5MSIZE STANDARD:
11. DELIVERYFOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/ CODE
OFFEROR
FACILITY
CODE
TELEPHONE NO.
18a. PAYMENT WILL BE MADE BY CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
See Schedule
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
SEE SCHEDULE
03:00 PM
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE ADDENDUM
EDWOSB
32a. QUANTITY IN COLUMN 21 HAS BEEN
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED
COMPLETE PARTIAL FINAL
STANDARD FORM 1449 (REV. 2/2012) BACK
36. PAYMENT
PARTIAL FINAL
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY
42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42b. RECEIVED AT (Location)
SPE60326R0518
DFSP Tampa, FL
Page | 3
NOTICE TO OFFERORS: This solicitation implements new acquisition procedures pursuant to the Revolutionary FAR Overhaul (RFO). Offerors are responsible for reviewing all solicitation provisions and clauses to ensure compliance with these updated requirements.
CONTENTS
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
PRICE PROPOSAL FORM (PPF)
SECTION C – SPECIFICATIONS/STATEMENT OF WORK
PERFORMANCE WORK STATEMENT (PWS)
SUPPLEMENT: SECURITY AND FIRE PROTECTION
SUPPLEMENT: REMOVAL OF WATER BOTTOMS
SUPPLEMENT: SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE)
SECTION E – INSPECTION AND ACCEPTANCE
FAR 52.246-4 INSPECTION OF SERVICES -- FIXED-PRICE (AUG 1996)
ENERGY QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF
SERVICES (DLA ENERGY JAN 2012)
ENERGY QAP E1.11 QUALITY CONTROL PLAN (MAR 2000)
ENERGY QAP E1.11-1 QUALITY CONTROL PLAN (GOCO) (AIR FORCE) (APRIL 2007)
ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA
ENERGY FEB 2017)
ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY)
(FEB 2022)
ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY FEB
2022)
ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
SECTION F - DELIVERIES OR PERFORMANCE
SUPPLEMENT: GENERAL RECEIVING AND STORING CONDITIONS
SUPPLEMENT: DETERMINATION ON QUANTITY (STORAGE) (DLA ENERGY NOV 1997)
Page | 4
SUPPLEMENT: CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY
DEC 1991)
SECTION G - CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SUPLLEMENT: GUARD SERVICE (DLA ENERGY FEB 1998)
SUPPLEMENT: REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY
JAN 2012)
SUPPLEMENT: PROCUREMENT NOTE H14 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
SECTION I - CONTRACT CLAUSES
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (FEB
2026)(DEVIATION 2026-O0038)
52.209-6 PROTECTING THE GOVERNMENTS INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (FEB
2026)(DEVIATION 2026-O0038)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY
MATTERS (FEB 2026) (DEVIATION 2026-O0038)
52.219-14 LIMITATIONS ON SUBCONTRACTING (FEB 2026) (DEVIATION 2026-O0038)
52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (FEB 2026)(DEVIATION 2026-O0038)
52.215-8 ORDER OF PRECEDENCE-UNIFORM CONTRACT FORMAT (FEB 2026)(DEVIATION 2026-
O0038)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
52.222-3 CONVICT LABOR (FEB 2026)(DEVIATION 2026-O0038)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (FEB 2026)(DEVIATION 2026-O0038)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (FEB 2026) (DEVIATION 2026-
O0038)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2026)(DEVIATION 2026-O0038)
Page | 5
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT
(FEB 2026)(DEVIATION 2026-O0038)
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDS – PRICE
ADJUSTMENT (MULTIPLE YEAR AND OPTIONS CONTRACTS) (AUG 2018)
52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2026)(DEVIATION 2026-O0038)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2024)
252.225-7000 BUY AMERICAN—BALANCE OF PAYMENTS PROGRAM CERTIFICATE—BASIC (NOV
2014)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
252.204-7020 NIST SP 800-171DOD ASSESSMENT REQUIREMENTS (NOV 2023)
252.225-7036 BUY AMERICAN—FREE TRADE AGREEMENTS—BALANCE OF PAYMENTS PROGRAM
(FEB 2026) (DEVIATION 2026-O0041)
252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND
TUNGSTEN (FEB 2026) (DEVIATION 2026-O0041)
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
DLAD 5452.233-9001 DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (JUN
2020)
SUPPLEMENT: RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA
ENERGY JAN 2012)
SUPPLEMENT: INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY AUG
2017)
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)
SECTION J – LIST OF ATTACHMENTS
ATTACHMENT I: PERFORMANCE WORK STATEMENT
ATTACHMENT II: PRICE PROPOSAL FORM (PPF)
ATTACHMENT III: DLA ENERGY QUALITY ASSURANCE PROVISIONS (E-QAP)
ATTACHMENT IV: PAST PERFORMANCE INFORMATION DISCLOSURE CONSENT FORM
ATTACHMENT V: PAST PERFORMANCE QUESTIONNAIRE FORM (PPQF)
ATTACHMENT VI: DEPARTMENT OF LABOR WAGE DETERMINATIONS
Page | 6
ATTACHMENT VII: PAST PERFORMANCE REFERENCE LIST
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS OR
RESPONDENTS
252.225-7055 REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO
REGIME (FEB 2026) (DEVIATION 2026-O0043)
PROHIBITION ON CERTAIN PROCUREMENTS FROM THE XINJIANG UYGHUR AUTONOMOUS
REGION–REPRESENTATION (FEB 2026) (DEVIATION 2026-O0043)
252.225-7056 PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME
DFARS 252.225-7060 PROHIBITION ON CERTAIN PROCUREMENTS FROM THE XINJIANG UYGHUR
AUTONOMOUS REGION (FEB 2026) (DEVIATION 2026-O0043)
SUPPLEMENT: AUTHORIZED NEGOTIATORS
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(SEP 2023)
ADDENDUM TO 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (SEP 2023)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (FEB
2026)(DEVIATION 2026-O0028)
252.204-7024 NOTICE ON THE USE OF THE SUPPLIER PERFORMANCE RISK SYSTEM (FEB 2026)
(DEVIATION 2026-O0043)
252.215-7994 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED COST OR PRICING DATA (FEB 2026)(DEVIATION 2026-O0048)
252.215-7992 ONLY ONE OFFER (FEB 2026)(DEVIATION 2026-O0028)
52.225-7059 PROHIBITION ON CERTAIN PROCUREMENTS FROM THE XINJIANG UYGHUR
AUTONOMOUS REGION–REPRESENTATION (FEB 2026)(DEVIATION 2026-O0028)
SUPPLEMENT: E-MAIL PROPOSALS (DLA ENERGY OCT 2010)
PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY jul 2018)
SECTION M – EVALUATION FACTOR FOR AWARD
Page | 7
52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB
2026)(DEVIATION 2026-O0038)
SUPPLEMENT: EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS)
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
PRICE PROPOSAL FORM (PPF)
See Section M, FAR 52.212-2, Evaluation of Factors for Award, Price Factor 3 for evaluation methodology concerning all price proposals. Reference Attachment VII for price proposal form.
SECTION C – SPECIFICATIONS/STATEMENT OF WORK
PERFORMANCE WORK STATEMENT (PWS)
THE PERFORMANCE WORK STATEMENT IS HEREBY INCORPORATED BY REFERENCE AS IF FULLY
SET FORTH HEREIN. SEE ATTACHMENT I.
SUPPLEMENT: SECURITY AND FIRE PROTECTION
(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.
(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.
(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.
(d) A water supply and fire fighting equipment conforming to National Fire Protection Association and American
Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.
(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret Service; U.S. Marshal's Service; and the Federal Emergency
Management Agency.
SUPPLEMENT: REMOVAL OF WATER BOTTOMS
Page | 8
Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms.
All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.) Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt. Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)
SUPPLEMENT: SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE)
(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS
FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site resources may be provided by Contractor personnel or by a commercial source acting on behalf of the Contractor. The Quality Representative will not be responsible for taking any samples for the Contractor. All samples must be taken in accordance with ASTM D 4057, Standard
Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement
Standards (MPMS), Chapter 8.1).
(b) TESTING. The tests identified in this solicitation attachment entitled MINIMUM REQUIREMENTS FOR
STORAGE SAMPLING AND TESTING are a required part of the services to be provided. Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks
After Receipt, Interface Mixture, Dormant Stocks, and Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the Contractor shall check the appropriate box below):
[ ] The Contractor will perform the tests using its own qualified personnel, facilities, and equipment. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not perform the tests using its own personnel, but will provide on a seven days per week, 24 hours a day basis, it’s own facilities and equipment for testing of product by Government personnel. (All costs for this service are to be included in the monthly service charge.)
Page | 9
[ ] The Contractor will not provide its own personnel, facilities, or equipment. Instead, the
Contractor will, within 24 hours after sampling, transport any sample(s) to a commercial laboratory approved by the
Government and arrange for that commercial laboratory to perform all the required tests. The Government, at its own option, may direct that samples be tested at a Government laboratory under contract to the Government. In this case, transport of such samples is still the responsibility of the Contractor. (The Government will reimburse the
Contractor for the actual costs of the tests performed by their commercial laboratory. All other associated costs must be included in the monthly service charge.)
All other tests found in the above referenced attachment, which are not part of a higher order analysis, shall be provided in accordance with the CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) contract text.
(c) All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection Association or local regulations, whichever is more stringent.
SECTION E – INSPECTION AND ACCEPTANCE
THE QUALITY ASSURANCE PROVISIONS (QAPs) LISTED IN THIS SECTION ARE HEREBY
INCORPORATED IN FULL TEXT UNDER ATTACHMENT IV OF THIS SOLICITATION.
FAR 52.246-4 INSPECTION OF SERVICES -- FIXED-PRICE (AUG 1996)
(a) Definition."Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the
Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may-
Page | 10
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may-
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
ENERGY QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF
SERVICES (DLA ENERGY JAN 2012)
ENERGY QAP E1.11 QUALITY CONTROL PLAN (MAR 2000)
ENERGY QAP E1.11-1 QUALITY CONTROL PLAN (GOCO) (AIR FORCE) (APRIL 2007)
ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA
ENERGY FEB 2017)
ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA
ENERGY) (FEB 2022)
ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY
FEB 2022)
ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
SECTION F - DELIVERIES OR PERFORMANCE
SUPPLEMENT: GENERAL RECEIVING AND STORING CONDITIONS
(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.
(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.
(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.
(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property
Page | 11
Administrator for disposition instructions. Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the
INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.
(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.
(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the
Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.
(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.
(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the
Contractor when the fuel passes the vessel’s permanent hose connection.
(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:
I certify that ______________ gallons of _____________________ have been upgraded/downgraded
(quantity) (product) from ___________________ to ____________________. This action was required because
(product) (product)
(enter reason for the action)
Signature of Contractor Representative
[ ] I concur with the Contractor’s certification.
[ ] I do not concur with the Contractor’s certification for the following reasons:
Page | 12
Signature of Quality Representative
(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)
(k) The following subparagraphs apply only to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.
(i) The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours notice for barges and the 72 hours notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.
(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED --
(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the
Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.
(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph
(ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.
Page | 13
(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo. When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.
(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the
Contractor.
(2) INCREASES TO BASIC ALLOWED LAYTIME.
(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed laytime shall be increased by the duration of the delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.
(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after laytime has commenced, the lost time shall be added to the basic allowed laytime.
(iv) If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a
Government representative, acting under the contract, that arise through no fault or negligence on the part of the
Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.
(v) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.
(vi) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.
(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:
(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.
(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the
Charter.
SUPPLEMENT: DETERMINATION ON QUANTITY (STORAGE) (DLA ENERGY NOV 1997)
The total gallonage received into or shipped from the Contractor's facilities shall be determined as follows:
(a) RECEIPTS OR SHIPMENTS OF CRUDE AND FUELS OTHER THAN RESIDUAL FUELS
(by transport truck of 3500 gallons or less) (truck and trailer combination when delivering same product will be considered as one container or conveyance). On an actual gallonage basis, without temperature correction.
Page | 14
(b) RECEIPTS OR SHIPMENTS OF RESIDUAL FUELS (in excess of 3500 gallons of crude or other fuels by tank car or transport truck). On a gallonage basis corrected to 60oF.
(c) RECEIPTS OR SHIPMENTS BY TANKER OR BARGE OR PIPELINE. On a gallonage basis corrected to 60oF. Quantities shipped or received will be determined on the basis of shore tanks or tender gauges taken by the Contractor and authenticated by the Quality Representative (QR). The ship or carrier's representative may participate in these determinations. During the gauging of shore tanks, the tanker, barge, or carrier's representative may participate in the quantity determinations, and, in the case of tanker/barge shipments or receipts, the Contractor may participate in the operations on board the tanker or barge which are required to determine the quantity of product in the tanker or barge cargo tanks.
(d) In the case of receipts, the Contractor shall sign the bill of lading and other related documents for the actual quantity received as determined above. When requested by the QR, the Contractor shall investigate losses or gains in connection with receipts or shipments to determine if the cause is at the Contractor’s facility.
(e) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards
(MPMS). Outside the United States, other technically equivalent national or international standards may be used.
In addition, the following specific standards will be the referee method.
(1) API MPMS Chapter 11.1, Volume Correction Factors (API 2540/ASTM D 1250/IP
200/ISO 91-1). Either the printed version or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine will be the referee method.
(i) For crude oils, JP4 and Jet B, use Volume I, Tables 5A and 6A (or Volume VII
Tables 53A and 54A).
(ii) For lubricating oils, use Volume XIII, Tables 5D and 6D (or Volume XIV, Tables
53D and 54D).
(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B (or Volume VIII, Tables 53B and 54B).
(iv) For chemicals/additives, use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.
(v) Volume XII, Table 52, shall be used to convert cubic meter at 15 degrees Centigrade to barrels at 60 degrees Fahrenheit. Convert liters at 15 degrees Centigrade to cubic meters at 15 degrees Centigrade by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by
42. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.
(vi) If the original measurement is by weight and quantity is required in U.S. gallons, then--
(A) Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit. Convert kilograms to metric tons by dividing by 1,000.
Page | 15
(B) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.
(2) API MPMS Chapter 4, Providing Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulations (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent.
(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter.
(f) In addition to gauging of storage tanks to determine quantities issued or received, the Contractor will gauge each active storage tank daily and each inactive storage tank weekly and compute physical inventories of the purpose of detecting loss of products.
SUPPLEMENT: CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA
ENERGY DEC 1991)
During the contract period, November 04, 2026, through November 03, 2035, the Contractor shall provide petroleum storage facilities and services at the following location:
_______________________TBD____________________________________
(Street address)
___________________________________DFSP Tampa, FL________________________
(City/State/Zip)
SECTION G - CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
Page | 16
“Document type” means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of
Payment Requests and Receiving Reports.
Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-
7003 , Electronic Submission of Payment Requests and Receiving Reports.
WAWF access. To access WAWF, the Contractor shall—
Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
WAWF methods of document submission. Document submissions may be via web entry, Electronic Data
Interchange, or File Transfer Protocol.
WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items— https://acquisition.gov/dfars/part-252-solicitation-provisions-and-contract-clauses#DFARS_252.232-7003 https://acquisition.gov/dfars/part-252-solicitation-provisions-and-contract-clauses#DFARS_252.232-7003 https://acquisition.gov/dfars/part-252-solicitation-provisions-and-contract-clauses#DFARS_252.232-7003 https://wawf.eb.mil/
Page | 17
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting
Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the
Contracting Officer.
_________________Invoice 2in1___________________________________________
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Data to be entered in WAWF
Field Name in WAWF Data to be entered in WAWF
Page | 18
Pay Official
DoDAAC
SL4701
Issue By DoDAAC SPE603
Admin DoDAAC** SPE603
Inspect By DoDAAC SJ0644
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver
(DoDAAC)
N/A
Service Acceptor
(DoDAAC)
SPE603; Extension CONUS
Accept at Other
DoDAAC
N/A
LPO DoDAAC N/A
DCAA Auditor
DoDAAC
N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition
Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact.
DLA Energy Help Desk Email: bsme.helpdesk@dla.mil (phone) (800)446-4950 mailto:bsme.helpdesk@dla.mil
Page | 19
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SUPLLEMENT: GUARD SERVICE (DLA ENERGY FEB 1998)
(a) In the event the Government requires guard service and/or other protective services or facilities not otherwise provided by the Contractor pursuant to the terms of this contract, the Government shall have the right--
(1) To provide such service; or
(2) To require the Contractor to provide such guard service; and/or
(3) To require the Contractor to provide such other protective services or facilities.
(b) The actual cost of providing said services or facilities under (2) and/or (3) above will be for the account of the Government and will be recognized by a modification to this contract.
SUPPLEMENT: REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA
ENERGY JAN 2012)
(a) Immediately upon the discovery of a petroleum spill, leak, or seepage involving Defense Logistics Agency
Energy (DLA Energy) owned product, the Contractor shall notify, by telephone, (1) the Quality Representative, (2) the designated Defense Energy Region, and (3) the Administrative Contracting Officer (ACO). In addition, if the said spill, leak, or seepage has reached, or if it might possibly reach, navigable waters, the Contractor shall immediately notify the Coast Guard by telephone (800) 424-8802, the appropriate Federal and State officials designated in State laws, and the ACO.
(b) Immediately upon discovery of a petroleum spill, leak, or seepage, the Contractor shall take all practicable measures available to contain and prevent further spreading of such spill, leak, or seepage. Measures taken by the
Contractor will be in compliance with all local, State, and Federal laws and regulations.
(c) Any Contractor whose terminal stores product exclusively for DLA Energy use shall prepare and submit an approved Spill Prevention Control and Countermeasure Plan, Oil Pollution Prevention Operations Manual, and Oil
Spill Contingency Plan, as applicable. These documents shall be submitted to the ACO and the Defense Energy
Region specified in the DESIGNATION OF THE DEFENSE ENERGY REGION contract text of this solicitation as soon as practicable after contract award, but no later than 60 days after award notification. The Contingency Plan shall include, but not be limited to, (1) Contractor in-house capability and facilities, or (2) the preselection of a local agency, cooperative, or firm capable of and willing to provide cleanup services of this nature.
(d) The Contractor shall be responsible for maintaining current telephone numbers of the agencies cited herein and in the Contingency Plan upon commencement of the contract period.
Page | 20
SUPPLEMENT: PROCUREMENT NOTE H14 CONTRACTOR PERSONNEL SECURITY
REQUIREMENTS
(a) Work to be performed under this contract or task order may, in full or in part, be performed at the Defense
Logistics Agency (DLA) Headquarters (HQ), DLA field activity office(s), or other Federally-controlled facilities.
Prior to beginning work on a contract, DLA requires all contractor personnel working on the Federally-controlled facility to have, at a minimum, an initiated National Agency Check with Written Inquiries (NACI) or NACI equivalent and favorable completion of a Federal Bureau of Investigation (FBI) fingerprint check.
(b) Additionally, in accordance with Department of Defense (DoD) Regulation 5200.2-R, Personnel Security
Programs, and DLA Issuance 4314, Personnel Security Program, all DoD contractor personnel who have access to
Federally-controlled information systems must be assigned to positions which are designated at one of three information technology (IT) levels, each requiring a certain level of investigation and clearance, as follows:
(1) IT-I for an IT position requiring a single scope background investigation (SSBI) or SSBI equivalent; 37 38
(2) IT-II for an IT position requiring a National Agency check with Law and Credit (NACLC) or NACLC equivalent; and
(3) IT-III for an IT position requiring a NACI or equivalent. Note: IT levels will be designated according to the criteria in DoD 5200.2-R.
(c) Previously completed security investigations may be accepted by the Government in lieu of new investigations if determined by the DLA Intelligence Personnel Security Office to be essentially equivalent in scope to the contract requirements. The length of time elapsed since the previous investigation will also be considered in determining whether a new investigation is warranted. To assist the Government in making this determination, the contractor must provide the following information to the respective DLA Intelligence Personnel Security Office immediately upon receipt of the contract. This information must be provided for each contractor employee who will perform work on a Federally-controlled facility and/or will require access to Federally-controlled information systems:
(1) Full name, with middle name, as applicable, with social security number;
(2) Citizenship status with date and place of birth;
Page | 21
(3) Proof of the individual’s favorably adjudicated background investigation or NACI, consisting of identification of the type of investigation performed, date of the favorable adjudication, name of the agency that made the favorable adjudication, and name of the agency that performed the investigation;
(4) Company name, address, phone and fax numbers with email address;
(5) Location of on-site workstation or phone number if off-site (if known by the time of award); and
(6) Delivery order or contract number and expiration date; and name of the contracting officer.
(d) The contracting officer will ensure that the contractor is notified as soon as a determination is made by the assigned or cognizant DLA Intelligence Personnel Security Office regarding acceptance of the previous investigation and clearance level.
(1) If a new investigation is deemed necessary, the contractor and contracting officer will be notified by the respective DLA Personnel Security Office after appropriate checks in DoD databases have been made.
(2) If the contractor employee requires access to classified information and currently does not have the appropriate clearance level and/or an active security clearance, the DLA Intelligence Personnel Security Office will relay this information to the contractor and contracting officer for further action. Investigations for contractor employees requiring access to classified information must be initiated by the contractor Facility Security Officer (FSO).
(3) The contracting officer will ensure that the respective DLA Intelligence Personnel Security Office initiates investigations for contractor employees not requiring access to classified information (i.e., IT or unescorted entry).
(4) It is the contractor’s responsibility to ensure that adequate information is provided and that each contractor employee completes the appropriate paperwork, as required either by the contracting officer or the DLA Intelligence
Personnel Security Office, in order to begin the investigation process for the required clearance level.
(e) The contractor is responsible for ensuring that each contractor employee assigned to the position has the appropriate security clearance level. 39
(f) The contractor shall submit each request for IT access and investigation through the contracting officer to the assigned or cognizant DLA Intelligence Personnel Security Office. Requests shall include the following information and/or documentation:
Page | 22
(1) Standard Form (SF) 85, Questionnaire for Non-Sensitive Positions, or the SF 86, Questionnaire for National
Security Positions (see note below);
(2) Proof of citizenship (i.e., an original or a certified copy of a birth certificate, passport, or naturalization certificate); and
(3) Form FD-258, Fingerprint Card (however, fingerprinting can be performed by the cognizant DLA Intelligence
Personnel Security Office). (Note to (f)(1) above: An investigation request is facilitated through use of the SF 85 or the SF 86. These forms with instructions as well as the Optional Form (OF) 306, Declaration for Federal
Employment, which is required with submission of the SF85 or SF 86, are available at the Office of Personnel
Management’s (OPM) system called Electronic – Questionnaires for Investigations Processing (e-QIP). Hard copies of the SF85 and SF86 are available at OPM’s web-site, www.opm.gov, but hard copies of the forms are not accepted.) (g) Required documentation, listed above in paragraphs
(f) (1) through (3), must be provided by the contractor as directed by the contracting officer to the cognizant DLA
Intelligence Personnel Security Office at the time of fingerprinting or prior to the DLA Intelligence Personnel
Security Office releasing the investigation to OPM.
(h) Upon completion of the NACI, NACLC, SSBI, or other sufficient, appropriate investigation, the results of the investigation will be forwarded by OPM to the appropriate adjudication facility for eligibility determination or the
DLA Intelligence Personnel Security Office for review and determination regarding the applicant’s suitability to occupy an unescorted entry position in performance of the DLA contract. Contractor personnel shall not commence work on this effort until the investigation has been favorably adjudicated or the contractor employee has been waived into the position pending completion of adjudication. The DLA Intelligence Personnel Security Office will ensure that results of investigations will be sent by OPM to the Department of Defense, Consolidated Adjudications
Facility (DoD CAF) or DLA Intelligence Personnel Security Office.
(i) A waiver for IT level positions to allow assignment of an individual contractor employee to commence work prior to completion of the investigation may be granted in emergency situations when it is determined that a delay would be harmful to national security. A request for waiver will be considered only after the Government is in receipt of the individual contractor employee’s completed forms, the background investigation has been initiated, and favorable FBI fingerprint check has been conducted. The request for a waiver must be approved by the
Commander/Director or Deputy Commander/Director of the site. The cognizant DLA Intelligence Personnel
Security Office reserves the right to determine whether a waiver request will be forwarded for processing. The individual contractor employee for which the waiver is being requested may not be assigned to a position, that is, physically work at the Federally controlled facility and/or be granted access to Federally-controlled information systems, until the waiver has been approved.
Page | 23
(j) The requirements of this procurement note apply to the prime contractor and any subcontractors the prime contractor may employ during the course of this contract, as well as any temporary employees that may be hired by the contractor. The Government retains the right to request removal of contractor personnel, regardless of prior clearance or adjudication status 40 whose actions, while assigned to this contract, who are determined by the contracting officer to conflict with the interests of the Government. If such removal occurs, the contractor shall assign qualified personnel, with the required investigation, to any vacancy.
(k) All contractor personnel who are granted access to Government and/or Federally-controlled information systems shall observe all local automated information system (AIS) security policies and procedures. Violations of local AIS security policy, such as password sharing, performing personal work, file access violations, or browsing files outside the scope of the contract, will result in removal of the contractor employees from Government property and referral to the contractor for appropriate disciplinary action. Actions taken by the contractor in response to a violation will be evaluated and will be reflected in the contractor’s performance assessment for use in making future source selection decisions. In addition, based on the nature and extent of any violations of AIS security policy, the Government will consider whether it needs to pursue any other actions under the contract such as a possible termination.
(l) The contractor may also be required to obtain a Common Access Card (CAC) or Installation Access Badge for each contractor employee in accordance with procedures established by DLA. When a CAC is required, the contracting officer will ensure that the contractor follows the requirements of Homeland Security Presidential
Directive 12 and any other CAC-related requirements in the contract. The contractor shall provide, on a monthly basis, a listing of all personnel working under the contract that have CACs.
(m) Contractor personnel must additionally receive operations security (OPSEC) and information security
(INFOSEC) awareness training. The DLA annual OPSEC refresher training and DLA annual INFOSEC training will satisfy these requirements and are available through the DLA Intelligence Office.
(n) When a contractor employee…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .