DLA Energy
REQUEST FOR INFORMATION SPE603-22-R-5X05
FUEL MANAGEMENT SERVICES IN FLC NORFOLK REGION, VA
This Request for Information (RFI) is for market research purposes. DLA Energy (DLA-E) is seeking information on industry capabilities/interest/potential commercial sources for Fuel Management
Services at FLC Norfolk Region, VA with five geographically separate fuel facilities at Craney Island, Sewell's Point, Chambers Field, and Joint Expeditionary Base (JEB) Little Creek-Fort Story. These services include receiving by tankers, barges, and pipeline shipments, maintaining, storing, sampling, testing, additive injection, internally transferring, and issuance of petroleum products. Along with operator/system maintenance and minor repairs of fuel facilities.
In accordance with Federal Acquisition Regulation (FAR) 15.201(e), responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. This RFI is issued solely for information and planning purposes and does not constitute a solicitation for proposals. The
Government is neither negotiating nor calling for offers at this time. This announcement is an expression of interest only and does not commit the Government to pay for any response preparation cost. The Government will not make an award base on this RFI. Responses to this notice shall be treated as information only.
All responses received may be held for an extended period of time or destroyed. In no case will any response be returned to the originator. DLA Energy will not provide reimbursement for costs incurred in responding to this RFI, as all costs associated with responding to this RFI will be the sole responsibility of the responding party. Respondents are advised that DLA Energy is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted under this RFI. Responses to this RFI do not bind the
Government to any further actions related to this topic.
This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government. Further, the government reserves the right to pursue any concepts that may result from this action without restriction.
CONCEPT OF OPERATIONS: DLA Energy is seeking information on the potential for receiving by tankers, barges, and pipeline shipments, maintaining, storing, sampling, testing, additive injection, internally transferring, and issuance of petroleum products. Along with operator/system maintenance and minor repairs of fuel facilities in the area listed below. Please see ‘Facilities’ section for storage amounts and receipt/issue capabilities required.
AREA OF CONSIDERATION: FLC Norfolk Region, VA
BACKGROUND:
Defense Logistics Agency - Energy currently uses the DFSP Norfolk contract vehicle to perform fuel management services in FLC Norfolk Region, VA for Government Owned-Contractor Operated (GOCO)
Contract Sites, which consists of Craney Island, Sewell’s Point, NAS Chambers Field, and JEB Little
Creek-Fort Story.
• DLA-E is contemplating a variety of fuel operations, maintenance management, small-medium-large business models, and any combination of contract location solutions to achieve these services. DLA-E is open to recommendations by the respondents as to the preferred site combination, individual locations, and arrangements to best achieve the services, to the extent that any such proposed solution is appropriate and applicable in view of all governmental policies and agreements.
• DLA-E is open to recommendations on whether sole contract arrangements should serve each individual fuel facility or combined fuel facilities (in various number combinations), or one central contract for the multiple locations, applicable to small, medium, and large business models.
• DLA-E is looking for solutions on procurement and maintenance of operational contractor vehicles (refueling, defueling, tanker trucks, general purpose, maintenance, and utility vehicles) that meet the requirements of DoD vehicles, and other government vehicles standards.
• DLA-E is open to solutions involving operator/system maintenance, and minor repairs of fuel facilities, government incidental property, and equipment (including piers, barges, small boats, pipeline, storage tanks, berms, canals, containment systems, gauges, pumps, valves, alarms, control valves, automated tank gauge system, pits, oil/water separator systems, fill stands, loading arms, tank trucks, vacuum trucks, laboratory equipment, etc.….) that meet the requirements of DoD, Unified Facilities Code (UFC) 3-460-03, and other government standards.
FACILITIES:
• DFSP Craney Island:
o DFSP Craney Island is on the northeastern portion of the City of Portsmouth, VA on the western shoreline of Hampton Roads (Norfolk Harbor). Fuel storage facility comprising of
874 acres and a series of aboveground storage tanks, two deep draft-fueling piers, and connected to the Colonial Pipeline System.
o The facility receives, stores and issues Aviation Turbine Fuel (F24 and JP5) and Naval
Distillate (F76). The pipelines and transfer systems allow for the receipt, transfer, and shipment of F24, F76, JP5 and receipt of Oily Wastewater and ship’s ballast. Flow rates vary dependent upon Colonial Pipeline System operations, but generally range from 1,500 to 4,500 barrels per hour. Interface cuts between F24, F76 and JP5 are detected by manually sampling from a sample point located near the custody transfer point. Pipeline injection receipts 24 per year / 2 per month (based on current F76 throughput).
o Facilities are comprised of the North Group, tanks 472-479, the East Group, tanks 501-
504, and two tank truck fill stands, Piers C and D, various pipelines, F24 and JP5 cut over point and transfer piping systems, and auxiliary support facilities. Primarily receive F24, JP5, and F76 via the Craney Island terminal pipeline connection to the Colonial Pipeline
System and infrequently by tanker, barge, and tank truck. Pipeline receipts average 46,000 barrels. The pier pipeline is limited to a maximum pressure of 90 PSI.
o Fuels can be received from tankers and barges at both Pier D and Pier C. The average off-loading rate for tankers is 6,000 barrels per hour, and for barges is approximately 4,000 barrels per hour. Tank truck receipts are generally limited to returns of small volumes of fuel. F24, F76 and JP-5 returns are pumped from the truck offload rack to a tank. Pier C can service one vessel up to 600 feet in length. Pier D can service two vessels up to a combined length of 1200 feet in length. Both piers have a maximum draft of 42 feet at mean low water and are equipped with fuel loading arms and hose riser manifolds.
o All vessels at Craney Island piers require line handling. All tankers and USN ships loading or off-loading product at the pier facilities require booming prior to commencing fuel operations. Along with the operation of eight incidental fuel barges. The barges are used to transport F76 and JP5 to and from US Navy ships berthed at Sewell’s Point, Norfolk Naval
Shipyard, Little Creek Amphibious Base, and local private shipyards. Commercial barges are also used to transport fuel to North Landing, other locations, and may be used for defueling US Navy ships. One tank truck fill stand is located immediately south of the tank truck issue tank group. The second tank truck fill stand is located immediately west of the
500 series tank group. Tank trucks can be filled with F76 and JP5. An additional, third truck fill stand is equipped to service JP-5, F-76, and F-24.
o The Automated Fuel Handling Equipment (AFHE) workstations (automated and manual) that control and direct several simultaneous operations within a complex bulk fuel distribution system to receive, store, transfer, and dispense aviation, ground, and lube oil products. AFHE also controls loading and unloading of oil tankers, accountability, and leak detection. All operational and maintenance data is documented for official record keeping. DFSP Craney Island is approximately ten road miles southwest of Sewell’s Point.
Storage:
Tank
Capacity (BBLS)
150,000
Product
F76
Type
Above Ground Field Constructed
473 150,000 F76 Above Ground Field Constructed
474 150,000 F76 Above Ground Field Constructed
475 150,000 F76 Above Ground Field Constructed
503 100,000 F76 Above Ground Field Constructed
504 100,000 F76 Above Ground Field Constructed
476 150,000 JP5 Above Ground Field Constructed
477 150,000 JP5 Above Ground Field Constructed
478 150,000 JP5 Above Ground Field Constructed
479 150,000 JP5 Above Ground Field Constructed
501 100,000 F-24 Above Ground Field Constructed
C191
CI91A
100,000
10,000
2,500
F-24
LI
LI
Above Ground Field Constructed
PRODUCT
AVERAGE
MONTHLY
RECEIPTS
AVERAGE
MONTHLY
ISSUES
F-76 231,000 BBLS 224,500 BBLS
JP-5 270,000 BBLS 255,000 BBLS
F-24
LI*
253,000 BBLS
9,702,000 Gallons
255,000 BBLS
9,702,000 Gallons
An asterisk * Pipeline injection receipts 24 per year / 2 per month (based on current F-76 throughput)
Craney Island – Hours of Operation
• Sewell’s Point:
o It is located within the confines of Naval Station Norfolk. The facilities provide for the receipt, storage, and shipment of bulk Lubricating Oil, Engine (LO6), Lubricating Oil, Steam (LTL) and AVLUBE (LA7). The terminal is comprised of four LTL, three LO6, and two LA7 CONVAULT tanks. There is a lube oil truck fill stand with receipt/issue manifolds and installed pumps. Lube oil is received at Sewell’s Point via commercial tank truck. The South wall adjacent to pier 20 is equipped with a JP5 manifold at the Sewell’s
Point barge loading station.
Storage
Tank Capacity
(Gallons)
Product Type
101 12,000 LA7 CONVAULT
102 8,000 LA7 CONVAULT
301 12,000 LO6 CONVAULT
302 12,000 LO6 CONVAULT
303 12,000 LO6 CONVAULT
201 12,000 LTL CONVAULT
202 12,000 LTL CONVAULT
203 12,000 LTL CONVAULT
204 12,000 LTL CONVAULT
MONTHLY
RECEIPTS
AVERAGE
MONTHLY ISSUES
LTL 12,933 Gallons 13328 Gallons
LO6 3,064 Gallons 2,897 Gallons
LA7 1,798 Gallons 1,061 Gallons
Function Operating Hours
Terminal Control Center Operations (AFHE) 24/7
Scheduling Operations 0730-1600, Mon thru Fri
Terminal Operations
Pipeline Operations 24/7
Barge Operations 24/7
Pier Side Operations 24/7
Inter-terminal Transfers 24/7
Truck Fill & Off-Load Operations 0500-1900, 7 days per week
Maintenance 0700-1600, Mon thru Fri
Inventory 0700-2400, 7 days per week
Accounting and Administration 0700-1600, Mon thru Fri
Sewell’s Point – Hours of Operation
Function Operating Hours
Terminal Operations
Pier Side Lube Oil Operations Sunrise-Sunset
Truck Fill & Off-Load Operations 0700-1430
Maintenance 0700-1600, Mon thru Fri
Inventory 0700-1600, Mon thru Fri
• NAS Chambers Field:
o It is located on Naval Station Norfolk and serves as an Aerial Port of Debarkation
(APOD), a pilot training facility, and as a homeport for numerous aviation squadrons. JP5 is received by incidental barge to the South Seawall.
o The operators shall be responsible for the operation and monitoring of the interface valve located at the tank farm/flight line boundary next to tank LP-42. Incoming product is transferred to one of the five (5) bulk tanks at approximately 1,430 GPM. MMR and DS2 are delivered by commercial tank truck. Receipts are random, dependent on consumption, and limited by storage capacity.
o Facilities consist of a single aboveground JP5 tank and four cut and cover concrete tanks.
Ground fuels and defueled product are also stored in and dispensed from aboveground
CONVAULTS. Jet fuel is delivered by refuelers to all assigned and transient aircraft, as well as wide body transient aircraft parked at the passenger/fuel terminal on the far side of the runway.
o In addition, three widely dispersed refueler/pantograph hot refueling sites are operated and maintained. The site makes limited ground fuel issues and conducts defueling services of aircraft. Fuel operator furnished tank trucks issue lube oil to customers within the
Hampton Roads The site operated laboratory, management office, and administrative office are in building LP44. The dispatch center and driver ready room are in building
LP65A.
Storage
LP38 300,000 JP5 Above Ground Field Constructed
LP39 237,000 JP5 Cut and Cover Field Constructed
LP40 237,000 JP5 Cut and Cover Field Constructed
LP41 550,000 JP5 Cut and Cover Field Constructed
LP42 550,000 JP5 Cut and Cover Field Constructed
LP161 12,000 JP5 CONVAULT
LP162 12,000 JP5 CONVAULT
LP108 12,000 DS2 CONVAULT
LP110 12,000 DS2 CONVAULT
LP109 12,000 MRR CONVAULT
MONTHLY
RECEIPTS
AVERAGE
MONTHLY
ISSUES
JP-5 1,291,000 Gallons 1,397,000 Gallons
DS2 2,934 Gallons 2,873 Gallons
MRR 329 Gallons 243 Gallons
Chambers Field - Hours of Operation
Function Monday-Friday Saturday Sunday/Holidays
Chambers Field
Accounting and Administration 0700-1600
Fuel Dispatch Center 24/7 24/7 24/7
Aircraft Fuel Servicing Operations 24/7 24/7 24/7
Hot Refueling Site, Helo (Primary) 0800-2300
Hot Refueling Site, Helo (Secondary), 1 Apr–31 Oct (as required) 1400-2200
Hot Refueling Site, Helo (Secondary), 1 Nov – 31 Mar (as required) 1200-2000
Hot Refueling Site, C2/E2 Site 0900-2300
Bulk Storage Operations 0700-1530
Quality Surveillance 0700-1530 & AR AR AR
Maintenance 0700-1600
Ground Fuel Delivery 0700-1530
• JEB Little Creek-Fort Story:
o The facilities consist of the fuel farm located at Desert Cove which consist of three aboveground welded steel tanks, a barge receipt pier, a pumping system dedicated to support a variety of ships ranging from small patrol craft to LSD and LPH class vessels.
o It is also the home station for ACU4 and its LCAC hovercraft, Construction Battalion
Two, and Special Warfare Group One. In addition, various other small, specialized boat units are assigned to JEB Little Creek-Fort Story. The Landing Craft, Air Cushion
(LCAC) fuel hydrant cabinets, and a JP5 truck fill stand used to fill ACU4 refuelers and bulk military transport. Reformulated mid-grade gasoline (MMR) and ultra-low sulfur diesel (DS2) are stored in two 10,000 CONVAULT tanks. MMR is delivered directly to a small craft issue point at the quay wall or to fuel trucks at the fill stand. DS2 is provided to trucks at the fill stand only. Two aboveground welded steel tanks provide bulk F76 storage. F76 can be delivered directly to four small craft issue points at the quay wall or to trucks at the fill stand.
o JP5 for the Desert Cove facility is received by barge from DFSP Craney Island at Pier 35 and berthed for servicing ships. These barges are moved about Desert Cove by Port
Operations and manned by fuels personnel to service ships at the piers. F76 is transferred from DFSP Craney Island by barge and received at the quay wall. In a contingency, two tank trucks can be offloaded simultaneously at the JP5 fill stand/receipt header pad. MMR and DS2 are received by tank truck and are limited to capacity driven by consumption, which requires the inventory to be closely monitored. The site administrative spaces are in building 3860. Trucks are parked at the Desert Cove facility.
o The Fort Story facilities consist of a tactical vehicle gas station (automated), one underground F-24 tank, and Bldg. 805 that houses the ATG equipment. F24 is delivered via the operator’s truck to the service station. The operator shall continually track F24 fuel inventories and replenish product to ensure availability.
Storage:
Tank Capacity (gallons) Product Type
3863 50,000 F76 Above Ground Field Constructed
3864 45,000 F76 Above Ground Field Constructed
3825 75,000 JP5 Above Ground Field Constructed
3845 250,000 JP5 Above Ground Field Constructed
3846 250,000 JP5 Above Ground Field Constructed
3838 10,000 MMR CONVAULT
3839 10,000 DS2 CONVAULT
Tank Capacity (gallons) Product Type
805A 15,000 F24 Underground Fiberglass
MONTHLY
RECEIPTS
AVERAGE
MONTHLY
ISSUES
F-76 198,000 Gallons 193,000 Gallons
JP-5 99,900 Gallons 99,400 Gallons
DS2 2,926 Gallons 2,787 Gallons
MRR 4,142 Gallons 4,210 Gallons
F-24 2,500 Gallons 2,350 Gallons
JEB Little Creek-Fort Story - Hours of Operation
Function (1) Monday-Friday Saturday Sunday/Holidays
Little Creek
Fuel Servicing Operations (6) 0700-1600
Ships/Small Craft (Facility/Mobile Refueler) 0700-1600
Landing Craft, Air Cushion (LCAC) 0700-1600
Ground Fuel Delivery (4) 0730-1500
Bulk Storage Operations (2) 0800-1630 0800-1000
Routine System Maintenance 0700-1600
Fort Story Service Station
Service Station Operation (automated & receipt) AR AR AR
Service Station Operation (manual) 0830-1130 & 1300-1400 0830-1000 AR
CAPABILITIES SOUGHT:
• Operator /System Maintenance and Minor Repair requirements for all sites.
• Protect/segregate multiple grades of Military Specification product during all receipt/issue operations.
• Environmental constraints/stewardship for both storage and receipt/issue.
• Lead-time required for establishing an initial capability and lead-time for a fully implemented supply chain solution.
• Potential Industry alternatives (Example: Access to existing capability).
• Industry concerns, potential constraints associated with maintaining a "warm" industrial capability enabled to support rapid activation.
• Fulfil maximum or feasible daily, weekly-sustained delivery quantities of DoD owned fuel to/from storage facilities in the area of consideration.
• Methods for feasible product delivery via tankers, barges, pipelines, and delivery trucks for millions of barrels annually.
• Response times (upon DLA Energy notification) once capability is established.
BUSINESS SENSITIVE, PROPRIETARY, OR OTHERWISE CONFIDENTIAL INFORMATION
• As information received in response to this RFI may be used to structure future solicitations, if your company chooses to submit any business sensitive, proprietary, or otherwise confidential information, it must be marked as proprietary or restricted data in the response. Information received from respondents will not be shared with any other respondent.
• Respondents will not be notified of the results of the market research. Response to this RFI is not required in order to respond to any future RFPs that may possibly follow
RESPONSES/QUESTIONS: Responses are requested no later than March 25, 2022 and along with questions should be directed to Contract Specialist, Mr. Oluseyi Olajire at oluseyi.olajire@dla.mil or
(571) 767-6553 / (571) 363-7921 and/or Contracting Officer Ms. Ursula Waibel at ursula.waibel@dla.mil or (571) 767-2928 / (571) 474-5287
SUBMITTAL INSTRUCTIONS/REQUIREMENTS:
1. Provide a company profile to include number of employees, annual revenue history (last 3 years), office location(s), DUNS/CAGE Code number, and a statement regarding current business status.
2. Capability to provide qualified and experienced personnel, with appropriate clearances, if required.
3. Past Performance. Do you have past performance as a prime contractor or subcontractor on a service contract for similar fuels management requirements? If so, please provide the following information: Contract number, Name of Government Agency or Commercial Entity, Period of
Performance, Dollar Value, Type of Contract (Fixed Price, Cost Reimbursement, etc.), and an explanation of services provided as they relate to GOCO DFSP fuels management. If your firm acted as a subcontractor or joint venture, name the prime contractor or other party, the specific work performed and percentage. Address any past performance problems, and resolutions taken.
4. Do you anticipate any type of teaming arrangement for this requirement? If yes, please address what kind of arrangement, and what percentage of work and type(s) of service would you perform?
mailto:oluseyi.olajire@dla.mil mailto:ursula.waibel@dla.mil
5. Does your company have experience with Service Contract Act of 1965 covered contracts? Does your company have experience with Collective Bargaining Agreements (CBAs)? Please explain in detail any experience your company has had interacting with labor unions.
6. Does your company have the financial capability and financial stability, and/or adequate lines of credit to sustain and support a five-year multiyear contract at one or more locations, in the event there are difficulties with invoice payments? Do you have an approved accounting system in place to adequately track expenditures? Please elaborate.
7. What realistic phase-in period would you require to commence performance with personnel, equipment, and materials?
8. Locations: Please indicate whether you are able to meet the entirety of the FLC Norfolk Region accumulative sites requirements or can only fulfil certain amount of individual location requirements.
9. Describe any operational, regulatory, business restrictions, limitations, or incentives to your proposal.
10. Your Additional Information -- include any additional materials you would like us to review which may provide greater insights into either your business experience and attainments in any similar undertakings with local state or federal governmental entities).