ATTACHMENT 15 - DFSP Pt. Loma CPSMR.pdf

PDF 577 KB Posted

Attached to
SPE603-22-R-0509 - DFSP Point Loma Environmental Restoration, Compliance, and Facility Management Services
Solicitation number
SPE603-22-R-0509
Issued by

View the file

Other files

File Type Posted
DFSP Pt Loma SPE60322R0509 Amendment 0006.pdf PDF
DFSP Pt Loma SPE60322R0509 Amendment 0007.PDF PDF
ATTACHMENT 6 - SCA WD 2015 5635 12.27.2022.pdf PDF
ATTACHMENT 2 - Price Proposal Worksheet Amendment 0006.xlsx XLSX spreadsheet
ATTACHMENT 16 - Questions and Answers.pdf PDF
ATTACHMENT 2 - Price Proposal Worksheet Amendment 0005.xlsx XLSX spreadsheet
DFSP Pt Loma SPE60322R0509 Amendment 0005 Conformed.pdf PDF
ATTACHMENT 1 - DFSP Pt. Loma PWS Amendment 0005.pdf PDF
DFSP Pt Loma SPE60322R0509 Amendment 0004.pdf PDF
DFSP Pt Loma SPE60322R0509 Amendment 0003.pdf PDF
DFSP Pt. Loma Pre-Proposal Conference Sign-in Sheet Redacted.pdf PDF
DFSP Pt Loma SPE60322R0509 Amendment 0002.pdf PDF
ATTACHMENT 4 - Past Performance Reference List Amnd 01.xlsx XLSX spreadsheet
DFSP Pt Loma SPE60322R0509 Amendment 0001 9.19.2022.pdf PDF
ATTACHMENT 3 - Past Performance Questionnaire Amnd 01.docx DOCX document
ATTACHMENT 5 - Joint Venture Consent Form.docx DOCX document
ATTACHMENT 6 - SCA WD 2015 5635.pdf PDF
ATTACHMENT 4 - Past Performance Reference List.xlsx XLSX spreadsheet
SPE60322R0509 DFSP Point Loma Solicitation.pdf PDF
ATTACHMENT 2 - Price Proposal Worksheet.xlsx XLSX spreadsheet
ATTACHMENT 3 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 1 - DFSP Pt. Loma PWS.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Page 1 of 2 Point Loma CPSMR

Date: 01 July 2022

Contractor’s Progress, Status and Management Report:

June 2022

CLIN 0001 – On-site Work (DLA Contract SPE603-18-D-5007)

Professional Services and Remedial Systems O&M

• The remediation systems remained operational during the reporting period. No loss of hydraulic control in the groundwater occurred.

• Coordination with NBPL Environmental Office continued through the reporting period.

o Provided total extracted NAPL numbers for their use in reports to the base commander.

o Renewing base passes for groundwater sampling personnel.

• Performed weekly and monthly well gauging (water level and NAPL level measurements) for selected wells through the period.

• Provided Bhate contact information and links to the State of California Geotracker website to the NAVFAC SW planning team for any questions they may have regarding their designs for a new construction project.

• NAPL measurements and system readings at the sumps were performed through the period.

• Received the State of California RWQCB “Annual Estimation Letter for Site Cleanup Cost Recovery - NBPL Fuel Farm”. The RWQCB was notified of the receipt of the estimate.

• Provided the DLA with estimates for groundwater modeling and a facility monitoring plan update.

• Provided the DLA contract specialist with information regarding the base EMS and contact information.

• Arranging for a subcontractor to change out the carbon filter media. Sampled the carbon for the sub to determine proper disposal of the carbon as part of the estimate.

• Treated water from RO units sent to Connection 220 (5/22/2022 through 6/22/2022):

- RO Unit 1: 307,184 gallons

- RO Unit 2: 180,013 gallons

Total treated water discharged to Connection 220 (5/22/2022 through 6/22/2022) was 787,397 gallons.

During the month of June, NAPL was recovered at an average daily rate of approximately 33 gallons per day.

DFSP Pt. Loma Environmental Services SPE60322R0509 Attachment 15

DFSP Pt. Loma Environmental Services SPE60322R0509 Attachment 15

Page 1 of 2 Point Loma CPSMR

Date: 01 August 2022

Contractor’s Progress, Status and Management Report:

July 2022

CLIN 0001 – On-site Work (DLA Contract SPE603-18-D-5007)

Professional Services and Remedial Systems O&M

• The remediation systems remained operational during the reporting period. No loss of hydraulic control in the groundwater occurred.

• Coordination with NBPL Environmental Office continued through the reporting period.

o Provided total extracted NAPL numbers for their use in reports to the base commander.

o Renewing base passes for groundwater sampling personnel.

• Performed weekly and monthly well gauging (water level and NAPL level measurements) for selected wells through the period.

• Provided the DLA with the Q3 self-evaluation for Point Loma

• Conducted sampling for the 2022 annual groundwater monitoring event.

• NAPL measurements and system readings at the sumps were performed through the period.

• Arranging for a subcontractor to change out the carbon filter media. Sampled the carbon for the sub to determine proper disposal of the carbon as part of the estimate.

• Arranging for a subcontractor to service the three site compressors.

• Treated water from RO units sent to Connection 220 (6/22/2022 through 7/22/2022):

o RO Unit 1: 256,053 gallons o RO Unit 2: 168,994 gallons

• Total treated water discharged to Connection 220 (6/22/2022 through 7/22/2022) was 746,415 gallons.

• During the month of July, NAPL was recovered at an average daily rate of approximately 30 gallons per day. The reduced average daily rate for the month is due to a slowdown in recovery during and following the July 4th holiday. At that rime the HW pumps were slowed by a programing issue. The issue has been addressed. During the last week in July the average daily recovery rate was restored to 50 gpd.

• On 7/19/22, two trucks from World Oil collected 13,070 gallons for off-site recycling. The total volume of recovered oil purchased and/or transported offsite by World Oil since the beginning of the contract is 73,179 gallons. At the current production rate, the next off-site shipment should occur in 2023.

Page 2 of 2 Point Loma CPSMR

Anticipated activities for the upcoming reporting period.

• Continue coordination with, and reporting to, the NBPL Environmental Office.

• Ongoing O&M of the remedial systems (well gauging, NAPL measurements, system readings).

• Complete the change out of the carbon and clay filter media.

• Complete servicing the three site compressors.

CLIN 0002 – On-site Work (DLA Contract SPE603-18-D-5007)

• The first portable extraction system is pumping at well 10MW-31 near Rosecrans Street.

• The second portable extraction system is pumping at well PZ-19 on the west side of the site.

Anticipated activities for the upcoming reporting period.

• Continue pumping at well PZ-19

• Continue pumping at well 10MW-31.

Financial Status and POP Summary (All Delivery Orders)