ATTACHMENT 15 - DFSP Pt. Loma CPSMR.pdf
PDF 577 KB Posted
- Attached to
- SPE603-22-R-0509 - DFSP Point Loma Environmental Restoration, Compliance, and Facility Management Services
- Solicitation number
- SPE603-22-R-0509
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Page 1 of 2 Point Loma CPSMR
Date: 01 July 2022
Contractor’s Progress, Status and Management Report:
June 2022
CLIN 0001 – On-site Work (DLA Contract SPE603-18-D-5007)
Professional Services and Remedial Systems O&M
• The remediation systems remained operational during the reporting period. No loss of hydraulic control in the groundwater occurred.
• Coordination with NBPL Environmental Office continued through the reporting period.
o Provided total extracted NAPL numbers for their use in reports to the base commander.
o Renewing base passes for groundwater sampling personnel.
• Performed weekly and monthly well gauging (water level and NAPL level measurements) for selected wells through the period.
• Provided Bhate contact information and links to the State of California Geotracker website to the NAVFAC SW planning team for any questions they may have regarding their designs for a new construction project.
• NAPL measurements and system readings at the sumps were performed through the period.
• Received the State of California RWQCB “Annual Estimation Letter for Site Cleanup Cost Recovery - NBPL Fuel Farm”. The RWQCB was notified of the receipt of the estimate.
• Provided the DLA with estimates for groundwater modeling and a facility monitoring plan update.
• Provided the DLA contract specialist with information regarding the base EMS and contact information.
• Arranging for a subcontractor to change out the carbon filter media. Sampled the carbon for the sub to determine proper disposal of the carbon as part of the estimate.
• Treated water from RO units sent to Connection 220 (5/22/2022 through 6/22/2022):
- RO Unit 1: 307,184 gallons
- RO Unit 2: 180,013 gallons
Total treated water discharged to Connection 220 (5/22/2022 through 6/22/2022) was 787,397 gallons.
During the month of June, NAPL was recovered at an average daily rate of approximately 33 gallons per day.
DFSP Pt. Loma Environmental Services SPE60322R0509 Attachment 15
DFSP Pt. Loma Environmental Services SPE60322R0509 Attachment 15
Page 1 of 2 Point Loma CPSMR
Date: 01 August 2022
Contractor’s Progress, Status and Management Report:
July 2022
CLIN 0001 – On-site Work (DLA Contract SPE603-18-D-5007)
Professional Services and Remedial Systems O&M
• The remediation systems remained operational during the reporting period. No loss of hydraulic control in the groundwater occurred.
• Coordination with NBPL Environmental Office continued through the reporting period.
o Provided total extracted NAPL numbers for their use in reports to the base commander.
o Renewing base passes for groundwater sampling personnel.
• Performed weekly and monthly well gauging (water level and NAPL level measurements) for selected wells through the period.
• Provided the DLA with the Q3 self-evaluation for Point Loma
• Conducted sampling for the 2022 annual groundwater monitoring event.
• NAPL measurements and system readings at the sumps were performed through the period.
• Arranging for a subcontractor to change out the carbon filter media. Sampled the carbon for the sub to determine proper disposal of the carbon as part of the estimate.
• Arranging for a subcontractor to service the three site compressors.
• Treated water from RO units sent to Connection 220 (6/22/2022 through 7/22/2022):
o RO Unit 1: 256,053 gallons o RO Unit 2: 168,994 gallons
• Total treated water discharged to Connection 220 (6/22/2022 through 7/22/2022) was 746,415 gallons.
• During the month of July, NAPL was recovered at an average daily rate of approximately 30 gallons per day. The reduced average daily rate for the month is due to a slowdown in recovery during and following the July 4th holiday. At that rime the HW pumps were slowed by a programing issue. The issue has been addressed. During the last week in July the average daily recovery rate was restored to 50 gpd.
• On 7/19/22, two trucks from World Oil collected 13,070 gallons for off-site recycling. The total volume of recovered oil purchased and/or transported offsite by World Oil since the beginning of the contract is 73,179 gallons. At the current production rate, the next off-site shipment should occur in 2023.
Page 2 of 2 Point Loma CPSMR
Anticipated activities for the upcoming reporting period.
• Continue coordination with, and reporting to, the NBPL Environmental Office.
• Ongoing O&M of the remedial systems (well gauging, NAPL measurements, system readings).
• Complete the change out of the carbon and clay filter media.
• Complete servicing the three site compressors.
CLIN 0002 – On-site Work (DLA Contract SPE603-18-D-5007)
• The first portable extraction system is pumping at well 10MW-31 near Rosecrans Street.
• The second portable extraction system is pumping at well PZ-19 on the west side of the site.
Anticipated activities for the upcoming reporting period.
• Continue pumping at well PZ-19
• Continue pumping at well 10MW-31.
Financial Status and POP Summary (All Delivery Orders)