SPE60321R0500 0002 w-Attachments.pdf
PDF 2 MB Posted
- Attached to
- Contractor-Owned, Contractor-Operated (COCO) Fuel Storage Services at Kabul, Afghanistan
- Solicitation number
- SPE603-21-R-0500
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60321R0500
X
2020 OCT 22
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
09 DEC 2020
3. EFFECTIVE DATE
Opening/Closing Date Changed to:
2020 OCT 22 / 2020 DEC 14
TIME 3:00 PM
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 3 PAGES
SPE60321R0500 - 0002
This amendment is hereby issued to:
A. Extend the solicitation closing date from December 11, 2020 to December 14, 2020 at 3:00 pm Ft. Belvoir, VA time.
B. Add provision DFARS 252.204-7019 Notice of NIST SP 800-171 DOD Assessment Requirements (Nov 2020) and clauses FAR 52.229-13 Taxes – Foreign Contracts in Afghanistan (Nov 2020) and DFARS 252.204-7020 NIST SP 800-171 DOD Assessment Requirements (Nov 2020). See Attachment A (revised RFP with highlighted revisions).
C. Delete in its entirety clause DFARS 252.229-7014 Taxes – Foreign Contracts in Afghanistan (Dec 2015).
D. Revise FAR 52.212-2 Evaluation – Commercial Items (Oct 2014), Factor 1 – Technical/Management. See attachment A (revised RFP with highlighted revisions).
E. Revise Performance Work Statement (PWS) Sections 1.8 Additive Injection, Section 1.8.1 Additive Required, Section
1.8.2 Additive Storage/Injection Plan and Section 2.4.5 Additive Injection System. See attachment B (revised PWS with highlighted revisions).
F. Answer questions received in response to the solicitation.
1.Attachment IV, PP Questionnaire. - The main contracts our company services is with DLA.
Can I submit CPARS instead of asking the Contract Managers to complete the PP Questionnaire?
Answer: No, Past Performance Questionnaires are to be received directly from the reference. Please see Section L, Addendum to FAR 52.212-1, Past Performance Questionnaires (PPQ).
2. PWS 1.8 Additive Injection: The product currently supplied to this location does not require additive; however, changes to the supply chain or product degradation may require the Contractor’s facility to be capable of injecting additives within 5 days.
What is the projected quantity of additive as volume, schedule and other factors drive pricing?
Answer: The quantity required at time of award is zero (0). As this is a contingency requirement, there is no way to project the quantity of additives required. As provided for in the corrected PWS Section 1.8.1 “If required, all costs for the acquisition of additives and associated costs for the storage, handling and injection of additives shall be handled through contract modification.”
3. PWS 1.8.1 Additive Required: All additives will be provided by the government. As a contingency, the contractor must establish a source of supply for each additive. The Contracting Officer may request the Contractor to provide a cost proposal for providing the additives. If needed, the acquisition of additives will be handled through contract modification.
Please identify the volume of additive the Contractor must retain on-site at all times for Fuel System Icing Inhibitor (FSII), Static Dissipater Additive (SDA), Corrosion Inhibitor/Lubricity Improver Additive (CI/LI) or other?
Answer: As provided for in the corrected PWS Section 1.8.1, the Offeror is not required to retain any additives on-site unless or until DLA Energy – Middle East, Bahrain regional office notifies the contractor of the need for additives in accordance with PWS 1.8.1.
4. PWS 1.9.1 Tank Truck: Notification: The Government shall give notice to the Contractor of scheduled product receipts. Receipt notification shall include the estimated quantity, mode of delivery, projected delivery date, shipment source, grade or type of product, and any special instructions.
We have a finite inspection / quality testing procedure. In the event of a rejected delivery from the Government, what is the procedure? How is this to be reflected on a DD250?
Answer: PWS 4.1.2 Product Quality Control Plan (QCP) shall indicate a corrective action plan when product is not delivered on specification. Section 2.3.2 PWS indicates contractor shall report immediately, but no later than 15 min after discovery to DLA Energy Middle East regional office.
5. PWS 2.3.4 Additional Samples: The Contractor shall provide to the Government representative samples of any product being stored, shipped, or received under the contract, at the request of, and in the manner designated by the QAR.
What is the exact delivery site for sample delivery?
Answer: See below lab locations and their capabilities:
•Kabul, Afghanistan – A Level testing capability •Fujairah – A level and below testing capability •Sharjah – A Level and below testing capability
G. All other terms and conditions remain the same.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SPE60321R0500 - 0002
Attachments
List of Attachments
File Name Description ATTACH_Attachment_A__
_SPE60321R0500_RFP
TAB 9-Solicitation and Am
ATTACH_Attachment_B__ _Performance_Work_State ment
TAB 9-Solicitation and Am
SPE603-21-R-0500
COCO Storage Kabul, Afghanistan
ADDITIONAL INSTRUCTIONS FOR ALL PROSPECTIVE OFFERORS
NOTE: See FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (JUN 2020) for complete instructions on how to submit a proposal and FAR 52.212-2 – EVALUATION
– COMMERCIAL ITEMS (OCT 2014) for evaluation criteria for this solicitation
Table of Contents
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
SECTION C - SPECIFICATIONS/SOW/SOO/PWS
C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
C-0002-C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
SECTION E – INSPECTION AND ACCEPTANCE
FAR 52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996)
DLA ENERGY QUALITY ASSURANCE PROVISIONS (QAPS)
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.242-15 STOP-WORK ORDER (AUG 1989)
F-0001-F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC 2017)
F-0002-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
F-0003-F1.11 DLA INTERNET BID BOARDS SYSTEM (DIBBS)(DLA ENERGY APR 2014)
F-0004-F1.14 DETERMINATION OF QUANTITY (STORAGE)(DLA ENERGY NOV 1997)
F-0005-F45.01 OPERATION OF CONDUCTIVITY ADDITIVE SYSTEM (DLA ENERGY JAN 2014)
F-0006-F45.03 OPERATION OF FUEL SYSTEM ICING INHIBITOR ADDITIVE SYSTEM CONTRACTOR-
OWNED CONTRACTOR-OPERATED (COCO) (DLA ENERGY JAN 2014)
F-0007- F45.04 OPERATION OF CORROSION INHIBITOR/LUBRICITY IMPROVER ADDITIVE SYSTEM, CONTRACTOR-OWNED CONTRACTOR-OPERATED (COCO) (DLA ENERGY JAN 2014)
F-0008-F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE)(DLA ENERGY DEC 1991)
SECTION G – CONTRACT ADMINISTRATION DATA
FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT
(OCT 2018)
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(DEC 2018)
DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
DFARS 252.246-7004 SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY
OPERATIONS (OCT 2010)
G-0001-G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)
G-0002-G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY JAN 2017)
G-0003-G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE WIRE TRANSFER
SYSTEM (DLA ENERGY JAN 2012)
G-0004-G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)
G-0005-G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
DFARS 252.225-7975 ADDITIONAL ACCESS TO CONTRACTOR AND SUBCONTRACTOR RECORDS. (DEVIATION
2020-O0022) (AUG 2020)
DFARS 252.225-7993 PROHIBITION ON PROVIDING FUNDS TO THE ENEMY (DEVIATION 2020-O0022)
(AUG 2020)
DFARS 252.225-7995 CONTRACTOR PERSONNEL PERFORMING IN THE UNITED STATES CENTRAL
COMMAND AREA OF RESPONSIBILITY (DEVIATION 2017-O0004) (SEP 2017)
DFARS 252.225-7997 CONTRACTOR DEMOBILIZATION (DEVIATION 2013-O0017) (AUGUST 2013) ... 58
DFARS 252.232-7014 NOTIFICATION OF PAYMENT IN LOCAL CURRENCY (AFGHANISTAN) (SEP 2014)
CENTCOM SPECIAL REQUIREMENT 5152.225-5902 FITNESS FOR DUTY AND MEDICAL/DENTAL CARE
LIMITATIONS (JUN 2015)
CENTCOM SPECIAL REQUIREMENT 5152.225-5907 MEDICAL SCREENING AND VACCINATION
REQUIREMENTS FOR CONTRACTOR EMPLOYEES OPERATING IN THE CENTCOM AREA OF
RESPONSIBILITY (AOR) (JUN 2015)
CENTCOM SPECIAL REQUIREMENT 5152.225-5908 GOVERNMENT FURNISHED CONTRACTOR
SUPPORT (JUN 2015)
CENTCOM SPECIAL REQUIREMENT 5152.225-5910 CONTRACTOR HEALTH AND SAFETY (DEC 2011) . 66
CENTCOM SPECIAL REQUIREMENT 5152.225-5915 CONTRACTOR ACCOUNTABILITY AND PERSONNEL
RECOVERY (JUN 2014)
CENTCOM SPECIAL REQUIREMENT 5152.225-5916 MANDATORY ELIGIBILITY FOR INSTALLATION
ACCESS (OCT 2015)
H-0001 H9.01 TECHNICAL DIRECTION (DLA ENERGY FEB 1992)
H-0002-H11 GUARD SERVICE (DLA ENERGY MAR 1982)
H-0003 - H19.01 REPORTING AND CONTAINING OIL SPILLS (OVERSEAS STORAGE) (DLA ENERGY JAN 1982)
SECTION I – CONTRACT CLAUSES
FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUNE
2016)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (OCT 2018)
ADDENDUM 1 TO 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
52.243-1 CHANGES -- FIXED PRICE (AUG 1987) ALT I (APR 1984)
ADDENDUM 2 TO 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS - 52.215-8
ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT (OCT 1997)
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS—COMMERCIAL ITEMS (AUG 2020)
FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS – NOTICE AND REPRESENTATION (JUN 2020)
FAR 52.229-13 TAXES – FOREIGN CONTRACTS IN AFGHANISTAN (NOV 2020)
FAR 52.232-1 PAYMENTS (APR 1984)
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
DFARS 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
DFARS 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
DFARS 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP
2013)
DFARS 252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)
DFARS 252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)
DFARS 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
DFARS 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (DEC 2019)
DFARS 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (MAY 2016)
DFARS 252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)
DFARS 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991)
DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019)
DFARS 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)
DFARS 252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
DFARS 252.225-7041 CORRESPONDENCE IN ENGLISH (JUN 1997)
DFARS 252.225-7039 DEFENSE CONTRACTORS PERFORMING PRIVATE SECURITY FUNCTIONS
OUTSIDE THE UNITED STATES (JUN 2016)
DFARS 252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS
OUTSIDE THE UNITED STATES (JUN 2015)
DFARS 252.229-7001 TAX RELIEF BASIC (APR 2020)
DFARS 252.232-7008 ASSIGNMENT OF CLAIMS (OVERSEAS) (JUN 1997)
DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
DFARS 252.233-7001 CHOICE OF LAW (OVERSEAS) (JUN 1997)
DFARS 252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR
PERSONNEL (JUN 2013)
DFARS 252.243-7001 PRICING OF CONTRACT MODIFICATION (DEC 1991)
DFARS 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
DFARS 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS
(DOD CONTRACTS) (JUN 2013)
DFARS 252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY
(APR 2012)
DFARS 252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEVIATION 2020-O0004) (FEB 2020)
DFARS 252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR
2012)
DFARS 252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEC 2017)
DLAD 52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015)
I-0001-I1.01-4 DEFINITIONS (CONT’D)(STORAGE) (DLA ENERGY JUNE 2009)
I-0002-I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA
ENERGY FEB 1996)
I-0003-I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY JAN 2012)
I-0004-I116.01 LIABILITY FOR FUEL SPILLS (DLA ENERGY JAN 2012)
I-0005- I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY AUG 2017)
I-0006-I147 DEMURRAGE (DLA ENERGY NOV 1989)
I-0007-I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012)
I-0008-I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (SEP 2009)
SECTION J – LIST OF ATTACHMENTS
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS
FAR 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
FAR 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (SEPT 2007)
FAR 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITITES THAT REQUIRE CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS – REPRESENTATION (JAN 2017)
FAR 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)
FAR 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020)
FAR 52.204-20 PREDECESSOR OF OFFEROR (AUG 2020)
FAR 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
FAR 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS –
REPRESENTATION (NOV 2015)
FAR 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)
FAR 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (JUN 2020)
FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY
MATTERS (OCT 2018)
FAR 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OF A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (AUG 2020)
ALT I (OCT 2014)
FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (MAR 2015)
52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS – NOTICE AND REPRESENTATIONS (JUN 2020)
DFARS 252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(NOV 2011)
DFARS 252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION
CONTROLS (OCT 2016)
DFARS 252.204-7016 COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES –
REPRESENTATION (DEC 2019)
DFARS 252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020) 189
DFARS 252.225-7974 REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO
REGIME (DEVIATION 2020-O0005) (FEB 2020)
DLAD 52.233-9001 DISPUTES-AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (DEC 2016)
K-0001-K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)
K-0002-K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)
K-0003-K150 WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE SUBMISSION (DLA ENERGY
MAY 2014)
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
FAR 52.212-1 INSTRUCTIONS TO OFFERORS –COMMERCIAL ITEMS (JUN 2020),
FAR 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
FAR 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
L-0001-L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991)
L-0002- L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)
L-0003-L116.01 DATA REQUIREMENTS (STORAGE) (DLA ENERGY JAN 2013)
SECTION M – EVALUATION FACTORS FOR AWARD
FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS (OCT 2014)
FAR 52.217-5 EVALUATION OF OPTIONS (JULY 1990)
M-0001-M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997)
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB
1991)
See Section M, FAR 52.212-2, Evaluation of Factors for Award, Price Factor 3 for evaluation methodology concerning all price proposals. Reference Attachment V for price proposal form.
The services to be furnished during the period specified herein and the unit prices are as follows:
BASE PERIOD
CONTRACT LINE ITEM 0001 – OUTSIDE THE CONTINENTAL UNITED STATES
(OCONUS) CONTRACTOR-OWNED CONTRACTOR-OPERATED (COCO) STORAGE
SERVICES, V20000404: (FIRM-FIXED-PRICE)
The Contractor shall provide OCONUS COCO bulk fuel service capabilities in accordance with (IAW) the Performance Work Statement (PWS) (Section C, Attachment I of this solicitation) and all other terms and conditions set forth herein, during the base period of May 1, 2021 through April 30, 2024 (3 years).
AREA(S) OF CONSIDERATION: Kabul, Afghanistan
LINE ITEM 0001
TANK
NO.
PRODUCT
TYPE
SHELL
CAPACITY
(BARRELS)
FILL
CAPACITY
(BARRELS)
OCONUS COCO
STORAGE
SERVICES
(MONTHLY USE
COCO
CHARGE)0F
ANNUAL
STORAGE
USE
CHARGE
TOTAL
PRICE
(3 YEARS)
Dedicated Line Fill
TOTAL PRICE: $ $ $
IAW the PWS, a storage (fill) capacity of 43,000 barrels of F34 is required. Monthly and Annual Storage Charges shall be based on this quantity. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the
1 Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.
above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of the above identified tanks at no increase to the offered storage charges.
IAW DLA Energy Quality Assurance Provision (QAP) E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0001 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:
Tank Monthly OCONUS COCO Storage Service Price
Annual Storage Use Charge
Daily Reduction/Addition Per Tank When Removed From/Returned To Revenue
IAW E18
NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0001 by utilizing the following formula:
Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days
If alternate tankage is offered IAW DLA Energy QAP E18, include shell/fill capacities in the offer. QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017) is not an evaluated price factor.
LINE ITEM 0002 (3-YEAR OPTION) – V2000404 OCONUS COCO Storage Services:
(FIRM-FIXED-PRICE)
The Contractor shall provide OCONUS COCO bulk fuel service capabilities in accordance with the PWS (Section C, Attachment I of this solicitation) and all other terms and conditions set forth herein, during the base period of May 1, 2024 through April 30, 2027 (3 years).
AREA(S) OF CONSIDERATION: Kabul, Afghanistan
LINE ITEM 0002
TANK
NO.
PRODUCT
TYPE
SHELL
CAPACITY
(BARRELS)
FILL
CAPACITY
(BARRELS)
OCONUS COCO
STORAGE
SERVICES
(MONTHLY USE
COCO
CHARGE)0F
ANNUAL
STORAGE
USE
CHARGE
TOTAL
PRICE
(3 YEARS)
Dedicated Line Fill
TOTAL PRICE: $ $ $
IAW the PWS, a storage (fill) capacity of 43,000 barrels of F34 is required. Monthly and Annual Storage Charges shall be based on this quantity. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of the above identified tanks at no increase to the offered storage charges.
IAW DLA Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0002 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:
Tank Monthly OCONUS COCO Storage Service Price
Annual Storage Use Charge
Daily Reduction/Addition Per Tank When Removed From/Returned To Revenue IAW E18
NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0002 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not
2 Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.
offered under E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0002 by utilizing the following formula:
Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days
If alternate tankage is offered IAW QAP E18, include shell/fill capacities in the offer. QAP E18
INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA
ENERGY FEB 2017) is not an evaluated price factor.
Local Clearances/National Notification Requirements: Contractor shall provide a detailed chart of all required or applicable country, national, federal, regional, state or local government or authority permits, licenses, notifications, clearances and filings, and any and all costs/fees required for or related to the purposes of receiving and issuing US Government owned products at their facilities. All cost shall be included in CLIN 0001 and 0002.
SECTION C - SPECIFICATIONS/SOW/SOO/PWS
The Performance Work Statement (PWS) is incorporated by reference as if fully set forth herein.
Refer to Attachment I of this solicitation.
C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.
(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.
(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.
(d) A water supply and firefighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.
(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret Service;
U.S. Marshal's Service; and the Federal Emergency Management Agency.
C-0002-C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.)
Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt.
Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)
SECTION E – INSPECTION AND ACCEPTANCE
FAR 52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996)
(a) Definitions. Services, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may
(1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract for default.
(End of clause)
DLA ENERGY QUALITY ASSURANCE PROVISIONS (QAPS)
The Quality Assurance Provisions pertaining to the inspection offices, nonconforming supplies and services, and material inspection and receiving reports are incorporated by reference as if fully set forth herein and located in Attachment II of this solicitation.
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.242-15 STOP-WORK ORDER (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause.
Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if –
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(End of clause)
F-0001-F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY
DEC 2017)
(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.
(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.
(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.
(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions. Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.
(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.
(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.
(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.
(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.
(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:
I certify that ______________ gallons of _____________________ have been upgraded/downgraded (quantity) (product) from ___________________ to ____________________. This action was required because (product) (product)
(enter reason for the action)
Signature of Contractor Representative
[ ] I concur with the Contractor’s certification.
[ ] I do not concur with the Contractor’s certification for the following reasons:
Signature of Quality Representative
(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)
(k) The following subparagraphs apply only to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.
(i) The Contractor shall be notified in advance of the scheduled arrival date.
Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours notice for barges and the 72 hours notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.
(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED --
(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.
(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.
(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo.
When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.
(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.
(2) INCREASES TO BASIC ALLOWED LAYTIME.
(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed laytime shall be increased by the duration of the delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.
(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after laytime has commenced, the lost time shall be added to the basic allowed laytime.
(iv) If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.
(v) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.
(vi) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.
(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:
(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.
(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.
F-0002-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:
"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE
AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION
OFFICE) in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND
TITLE OF CONTRACTOR'S DESIGNATED REPRESENTATIVE)."
(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.
(c) Conveyances required for shipments shall be furnished or designated by the Government.
The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES.
Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.
(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels, jet lubricating oil, and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish, periodically inspect, clean such strainers, and repair same, if necessary, keeping a written record thereof.
(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. The Contractor will furnish such seals. Seal numbers will be indicated on shipping documents.
(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.
(g) FOR TANK CARS ONLY.
(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.
(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.
(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.
(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.
(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information.
The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.
(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.
(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.
(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.
(m) Custody of product delivered to tanker or barge, and risk of loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.
(n) The Contractor shall be held accountable for demurrage charges arising from delay(s) in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(o) The following subparagraphs only apply to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAY TIME.
(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival. Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours’ notice for barges and 72 hours’ notice for tankers will require verbal approval of the Contractor, confirmed in writing.
(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --
(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and lay time shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .