Attachment V - Price Proposal Form.pdf

PDF 128 KB Posted

Attached to
Contractor-Owned, Contractor-Operated (COCO) Fuel Storage Services at Kabul, Afghanistan
Solicitation number
SPE603-21-R-0500
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT V PRICE PROPOSAL FORM

SPE603-21-R-0500

KABUL, AFGHANISTAN

B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB

1991)

See Section M, FAR 52.212-2, Evaluation of Factors for Award, Price Factor 3 for evaluation methodology concerning all price proposals.

The services to be furnished during the period specified herein and the unit prices are as follows:

BASE PERIOD

CONTRACT LINE ITEM 0001 – OUTSIDE THE CONTINENTAL UNITED STATES

(OCONUS) CONTRACTOR-OWNED CONTRACTOR-OPERATED (COCO) STORAGE

SERVICES, V20000404: (FIRM-FIXED-PRICE)

The Contractor shall provide OCONUS COCO bulk fuel service capabilities in accordance with (IAW) the Performance Work Statement (PWS) (Section C, Attachment I of this solicitation) and all other terms and conditions set forth herein, during the base period of May 1, 2021 through April 30, 2024 (3 years).

AREA(S) OF CONSIDERATION: Kabul, Afghanistan

LINE ITEM 0001

TANK

NO.

PRODUCT

TYPE

SHELL

CAPACITY

(BARRELS)

FILL

CAPACITY

(BARRELS)

OCONUS COCO

STORAGE

SERVICES

(MONTHLY USE

COCO

CHARGE)0F

ANNUAL

STORAGE

USE

CHARGE

TOTAL

PRICE

(3 YEARS)

Dedicated Line Fill

TOTAL PRICE: $ $ $

IAW the PWS, a storage (fill) capacity of 43,000 barrels of F34 is required. Monthly and Annual Storage Charges shall be based on this quantity. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of the above identified tanks at no increase to the offered storage charges.

1 Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.

KABUL, AFGHANISTAN

IAW DLA Energy Quality Assurance Provision (QAP) E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0001 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

Tank Monthly OCONUS COCO Storage Service Price

Annual Storage Use Charge

Daily Reduction/Addition Per Tank When Removed From/Returned To Revenue

IAW E18

NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0001 by utilizing the following formula:

Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days

If alternate tankage is offered IAW DLA Energy QAP E18, include shell/fill capacities in the offer. QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017) is not an evaluated price factor.

LINE ITEM 0002 (3-YEAR OPTION) – V2000404 OCONUS COCO Storage Services:

(FIRM-FIXED-PRICE)

The Contractor shall provide OCONUS COCO bulk fuel service capabilities in accordance with the PWS (Section C, Attachment I of this solicitation) and all other terms and conditions set forth herein, during the base period of May 1, 2024 through April 30, 2027 (3 years).

AREA(S) OF CONSIDERATION: Kabul, Afghanistan

KABUL, AFGHANISTAN

LINE ITEM 0002

TANK

NO.

PRODUCT

TYPE

SHELL

CAPACITY

(BARRELS)

FILL

CAPACITY

(BARRELS)

OCONUS COCO

STORAGE

SERVICES

(MONTHLY USE

COCO

CHARGE)0F

ANNUAL

STORAGE

USE

CHARGE

TOTAL

PRICE

(3 YEARS)

Dedicated Line Fill

TOTAL PRICE: $ $ $

IAW the PWS, a storage (fill) capacity of 43,000 barrels of F34 is required. Monthly and Annual Storage Charges shall be based on this quantity. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of the above identified tanks at no increase to the offered storage charges.

IAW DLA Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0002 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

Tank Monthly OCONUS COCO Storage Service Price

Annual Storage Use Charge

Daily Reduction/Addition Per Tank When Removed From/Returned To Revenue IAW E18

NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0002 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0002 by utilizing the following formula:

Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition

2 Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.

KABUL, AFGHANISTAN

365 Days

If alternate tankage is offered IAW QAP E18, include shell/fill capacities in the offer. QAP E18

INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA

ENERGY FEB 2017) is not an evaluated price factor.

Local Clearances/National Notification Requirements: Contractor shall provide a detailed chart of all required country, national, federal, regional, state or local government or authority permits, licenses, notifications, clearances and filings, and any and all costs/fees required for or related to the purposes of receiving and issuing US Government owned products at their facilities. All cost shall be included in CLIN 0001 and 0002.

B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

File details come from the government source that posted it. Updated .