Attachment_I_SOW_(17_Dec_18).pdf
PDF 713 KB Posted
- Solicitation number
- SPE603-19-R-0505
- Issued by
-
Defense Logistics Agency Energy
About this file
Attachment I - Statement of Work (17 Dec 2018)
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for
Contracted Laboratory Services Europe & Africa Region
17 December 2018 fme9865 Highlight
Contents C-1.0 General Description C-1.0.1 Service Locations C-1.0.2 Cyprus Location C-1.1 Specifications, Standards and Handbooks C-1.2 Facilities C-1.3 Scheduling of Services C-2.0 Contractor Detailed Plans (Deliverables) C-2.1 Contract Compliance Plan C-2.2 Contract Contingency Plan:
C-2.3 Contract Training Plan C-2.4 Testing Requirements C-2.5 Safety Plan C-2.6 Transportation Plan C-3.0 Operating Hours C-3.1 Staffing:
C-3.1.1 Labor Reporting C-3.1.1.1 Reporting Inputs C-3.2 Knowledge and Skills C-4.0 Information and Records Management C-4.1 Monthly Reporting:
C-4.2 Invoicing:
C-5.0 Laboratory Performance Requirements C-5.1 Testing Capabilities C-5.2 Access C-5.3 Laboratories C-5.3.1 Laboratory Consumables and Equipment C-5.3.2 Epoxy Lined Sample Cans C-5.4 Product Testing:
C-5.4.1 Ellipsometric Tube Deposit Rater (ETR) C-5.5 Sample Testing Turnaround Times C-5.6 Retain samples C-6.0 Sampling Performance Requirements C-7.0 Transportation Performance Requirements C-8.0 Sample Shipment:
C-9.0 Special Fuels Performance Requirements Attachment 1: Products to be Tested Attachment 2: MIL-STD-3004-1 Testing Series Defined (B-1, B-2, B-3 & C series) Attachment 3: Testing Requirements Table 1: Aviation Turbine Fuels Table 2: Aviation Gasoline Table 3: Marine Diesel Attachment 4: Annual Estimates by Location
Page | 1
C-1.0 General Description: This Statement of Work (SOW) is established to identify the Contractor responsibilities for the period of performance identified in the solicitation or applicable contracting documents distributed by the Contracting Officer. Contractor will be responsible for the laboratory testing of government-owned petroleum products in accordance with the standards as described herein and transportation of samples from specified locations to laboratory. Government-owned products mentioned in this SOW located outside the service locations in section C-1.0.1 can be shipped to the contractor’s laboratory for testing; however the contractor will not provide transportation unless requested by DLA- Energy separately. The Europe Region is defined as the following countries: Cyprus, Ireland, Sicily, Turkey, Spain, and Africa.
C-1.0.1 Service Locations: The Contractor shall be able to provide the requested service of this SOW to locations listed in the table below. Other locations may be added by future modification. The Contractor shall have a facility in the same country as the requiring location and shall meet turn-around times listed in C-5.5.
Location: Address:
Djibouti, Free Zone Horizon Terminal, Doraleh, Djibouti, Africa
Augusta, Sicily
DEPOSITO POL NATO SAN CUSUMANO
Contrada SAN CUSUMANO
96011 – AUGUSTA (SR)
Cyprus Akrotiri, Cyprus
Rota, Spain
NSA Rota Spain Base Naval De Rota Aptd 33-Edificio 600 11520 Rota Spain
Mersin, Turkey
Mersin Terminal 3 Ocak Mah. 132. CD No. 29 Akdeiz/Mersin
Shannon, Ireland
Shannon Airport Shannon, Ireland Co Clare 061 472394
C-1.0.2 Cyprus Location: Contractor must have a laboratory on the island, able to freely access the area to avoid customs issues or disputes. Contractor shall pick-up the sample and transport it back to their facility to complete the testing requested.
C-1.1 Specifications, Standards and Handbooks: Contractor shall maintain all of the required specifications, standards, test methods, handbooks mentioned in this SOW or contract award at the nominated laboratory. Military Specifications referenced for petroleum product types can be obtained at http://quicksearch.dla.mil or https://assist.dla.mil and can also be supplied by the Contracting Officer or Contracting Officer’s Representative (COR) if requested in writing.
C-1.2 Facilities: The Contractor shall provide a list of facilities capable of product testing in accordance with paragraph C-1.0.1. List shall at a minimum include physical location, points of contact, testing capability & certifications identified in C-2.1.
C-1.3 Scheduling of Services: Contractor shall be notified by a DLA Energy representative to coordinate the tests to be performed, the product(s) grade and the quantity of tests requested. Contractor shall not perform petroleum testing without first contacting Quality Assurance Representative if prior contact was not made.
C-2.0 Contractor Detailed Plans (Deliverables): All deliverables shall be submitted to the Contracting Officer for review and acceptance in the Offer’s Submission Package (OSP). Deliverables/plans shall be kept current for the life of the contract. The Government reserves the right to request changes or modifications to any detailed plans at any time throughout the contract performance period. Plans shall be made available for Government review upon request at any time during the contract performance period.
http://quicksearch.dla.mil/
Page | 2
C-2.1 Contract Compliance Plan: The Contractor is responsible for ensuring compliance with all contract performance requirements. The Contractor shall develop a quality management system acceptable to the Government for monitoring overall contract performance. ISO 9001 and/or ISO/IEC 17025 can be considered acceptable with proper certification. The Contract Compliance Plan (CCP) shall include performance requirements for all of the services and specified tasks listed in this SOW and the Contractor’s authored or written performance based plans. The CCP shall include time specific checklists for evaluation of all operational requirements. The CCP shall address procedures for corrective actions including the resolution of any Corrective Action Requests (CAR) and Quality Deficiency Reports (QDR) generated by the Government. Contractor laboratory facilities and personnel and equipment shall be vetted by a DLA Energy Quality representative prior to or during the first order of the performance period unless laboratory was vetted under a previous DLA Energy contract. Periodic site visits will be performed to ensure contract compliance. Contractors which have to subcontract certain test methods must inform the contracting officer in writing to request an exception, deviation or waiver (EDW).
C-2.2 Contract Contingency Plan: The Contract Contingency Plan shall outline Contractor actions to ensure there is no significant interruption of services resulting from labor disputes, catastrophic failure of equipment, or the effects of natural disasters/emergencies. The plan shall provide specific details regarding labor issues as may result from potential strike actions, military contingency and war time manning requirements, subcontracting as may be required to meet emergent manning requirements, and the replacement of equipment anticipated to be out of service for more than 48 hours.
C-2.3 Contract Training Plan: The Contractor shall provide a detailed plan that identifies employee training requirements and procedures necessary to maintain proficiency. The plan shall identify length of training, training sources and a brief description of courses such as safety, environmental protection and job qualification training. The Contractor is responsible for ensuring all individual training requirements are accomplished. Contractor must demonstrate current participation in a proficiency program or suitable means to verify laboratory performance.
C-2.4 Testing Requirements: The Contractor shall maintain detailed plans regarding the required characteristic tests as presented in attachments 2 and 3. Contractor shall maintain all of the necessary testing standards and specifications, as noted in paragraph C-1.1 above. If the contractor is unable to provide certain specification tests, as listed in the maintained standards and specifications, the contractor must request an exception, deviation or waiver (EDW) during the solicitation process and after award if any changes have occurred. EDW request should be detailed with the cause of such request and the contractor’s means of correcting the deficiency. If the contractor plans on using a sub-contractor to perform certain tests and/or functions, the contractor must provide that information in their plan and to the DLA Energy contracting officer for vetting and approval. The contractor must also ensure they either possess or have access to all referee methods described in the various specifications. If the contractor plans on using another laboratory for either normal sample testing as prescribed in this SOW or for referee method support, the contractor must be able to adhere to the turnaround times identified in paragraph C-5.5.
C-2.5 Safety Plan: The Contractor shall provide a detailed plan outlining the policy, procedures and actions necessary to maintain a safe working environment for employees and visitors. The plan shall cover the products stored, handled, Safety Data Sheets (SDS) and guidelines regarding the safe handling of such products and shall be maintained and updated over the course of the contract.
C-2.6 Transportation Plan: Contractor shall submit a plan for review to transport the petroleum samples to an approved laboratory for testing or shipping (contractor supplied transport, third party delivery service, etc.) and how they plan on tracking the chain of custody to the contractor’s facility. Product quality must be preserved and not altered by shipment. DLA Energy or its contractor(s) do not have the ability or certification to ship or package fuel samples.
C-3.0 Operating Hours: The Contractor shall be responsible for adjusting hours of operation to avoid overtime and still provide highest level of service to meet workload demands.
C-3.1 Staffing: The Contractor shall provide sufficient staffing to accomplish all functions and tasks to include simultaneous operations. The Contractor’s staff shall be able to communicate in English and be flexible and fully capable of meeting the demands of written orders or oral requests made by DLA Energy representatives. Contractor shall provide the contact information for Laboratory Manager or Assistant Laboratory Manager if the laboratory is not manned 24 hours, seven days a week.
Page | 3
C-3.1.1 Labor Reporting: The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Logistics Agency via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil.
C-3.1.1.1 Reporting Inputs: The reporting shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil.
C-3.2 Knowledge and Skills: The Contractor shall ensure that personnel assigned to all tasks have the requisite knowledge and skills to meet the performance standards for those tasks and comply with all applicable country, federal, and state laws, and regulations and codes. All personnel in key employees (i.e. liasions, supervisors or managers) shall have the capability to read, write, & speak English fluently. Guidance is issued via verbal communications, written instructions, and emails, and personnel must be able to understand & provide response to required detail report in English.
C-4.0 Information and Records Management: The Contractor shall maintain records evidencing all services performed containing a complete description held or generated by the Contractor. Records shall be open and readily available to DLA Energy for inspection, review and audit for the duration of the contract and any subsequent and contiguous contract periods. In addition, special reports may be requested for audits, inspections, reviews and research. Upon expiration of the contract, all records except personnel files, training records, equipment records and non-proprietary company management records shall be deemed the property of the government and turned over to the Government.
C-4.1 Monthly Reporting: The Contractor shall report monthly to the contracting officer the number of laboratory tests performed, what testing was included and location.
C-4.2 Invoicing: Suggestion: Contractor shall submit its invoice via Procurement Integrated (WAWF) within 15 days after the end of the period of performance. The contractor shall include an attachment with each invoice submission that documents the following: Date(s) of each test performed, sample type, location of laboratory, and the test results. In addition, each invoice shall be submitted in accordance to the terms and conditions of the specified by the contracting officer.
C-5.0 Laboratory Performance Requirements: The Contractor shall maintain records evidencing all analysis performed under this contract. All samples tested shall be documented with a detailed report. Reports shall be complete and legible containing information pertaining but not limited to: Lab Name, Test Method, Test Name, Test Results, Test Units, and Test Limits. Reports not containing this information shall be returned for correction without prior approval.
C-5.1 Testing Capabilities: Contractor must keep DLA Energy Contracting Officer apprised of any changes to services and proficiencies. Any changes will be reported within 48 hours to the Contracting Officer in writing with a full description of changes and impact to testing. Annually Contractor shall provide contracting officer with a list of testing capabilities, locations in which testing can be completed and a point of contact.
C-5.2 Access: Contractor shall allow DLA Energy Representatives to witness testing or sampling and provide applicable information for access, provide follow-up to obtain access (for personnel and vehicles) to all facilities that product is tested or sampled. For areas that require special admission the Contractor will assist DLA Energy gaining access.
C-5.3 Laboratories: The laboratories shall have a system of calibration equivalent to ISO 10012-1 or 17025. All testing shall be performed in accordance with the appropriate international or local test methods that have been approved for use by DLA Energy and listed in this SOW. Laboratories are required to have the listed referee test methods as referenced in the product specifications and international test methods (ASTM, IP, DEF Stan, EI, etc.).
C-5.3.1 Laboratory Consumables and Equipment: Contractor shall furnish all consumables and equipment in accordance with all ASTM or specification methods needed to perform testing without an unacceptable time delay.
http://www.ecmra.mil/ http://www.ecmra.mil/
Page | 4
C-5.3.2 Epoxy Lined Sample Cans: Contractor shall maintain a supply of 10 unused epoxy lined fuel sample shipping containers to be provided to DLA Energy personnel per request at all locations. Sample containers shall be stored to ensure they are clean and free from all substances that might contaminate the product being sampled. Containers must comply with ASTM D-4306, USG 1 gallon or 5 liter equivalent and able to be shipped as hazardous material.
C-5.4 Product Testing: Employees must follow all mentioned, laboratory related reference materials listed in the SOW attachments. Samples that fail initial testing shall be retested immediately within 1 hour and prior to submission of any test results. The Contractor shall immediately report any delays to the Contracting Officer, Quality Assurance Representative (QAR) or the Contracting Officer Representative (COR) for resolution.
C-5.4.1 Ellipsometric Tube Deposit Rater (ETR): Contractor shall have the ability to perform ASTM D3241 Annex 3 ETR within testing turnaround time in section C-5.5 B-1, B-2, B-3 Testing Turn Around Time when request is made. ETR is the preferred method and should be treated as the referee method.
C-5.5 Sample Testing Turnaround Times: Testing turn-around times are defined as when the Contractor receives the sample at the laboratory and submits the test reports to the responsible office. All testing requested, per order, shall be completed within the turn-around time listed below. Turn-around time ends when testing results are completed and delivered to DLA Energy. If testing cannot be completed within the turn-around time due to an unusually long processing time as stated within the test method or some other issue which arises during the process, the contractor will immediately notify the QAR and/or COR. The contractor will specify the problem and the estimated completion date and time.
TESTING TURNAROUND TIMES
B-1, B-2, B-3 Testing 24 hours C-level Testing 8 hours Expedite Request 6 hours Special/VIP Requirement 8 hours
C-5.6 Retain samples: Samples shall be retained, after analysis, for a minimum of 45 days. In the event of a suspected quality issue or dispute, a longer sample retention period may be requested by DLA Energy. The Contractor shall be responsible for disposal of excess fuel samples and sample containers.
C-6.0 Sampling Performance Requirements: The Contractor shall be capable of petroleum product sampling IAW API MPMS and/or ASTM D4057 when requested of vessels, barges, tank trucks, storage tanks or any containers that may hold fuel. Contractor shall supply all equipment and material need to perform the task.
C-7.0 Transportation Performance Requirements: The Contractor shall be responsible for packing and transporting all petroleum samples from job site to the laboratory in accordance with the country’s regulations or laws.
When sample transportation is not required, Contractor shall be notified (sample delivered to laboratory by another person).
DLA Energy or its storage terminal contractor(s) do not have the ability or certification to ship or package fuel samples.
C-8.0 Sample Shipment: The contractor shall upon request be responsible for shipping fuel samples from locations stated in C-1.0.1 to the laboratories in the chart below. Fuel samples shall be shipped within 48 hours of request and arrive to the below laboratory within five calendar days listed in SOW C-8.0.
Naval Air Systems Command HAZMART Bldg. 2385 22680 Hammond Road Patuxent River, MD 20670
US ARMY TARDEC
Petroleum Laboratory Bldg. 5085 U Avenue, Bldg 85 New Cumberland, PA 17070-5083
Aerospace Fuels Laboratory AFPA/PTPLA 2430 C Street, Bldg 70, Area B Wright Patterson AFB OH 45433-7632
DLA Energy Europe & Africa Petroleum Laboratory Bldg. 320, Rhine Ordnance Barracks Am Opelkreisel 67663 Kaiserslautern, Germany
COMM: 011-49-631-3406-2284/2288
Intertek UK Intertek Sunbury Technology Centre Unit A, Shears Way Brooklands Close, Sunbury, Middlesex TW16 7EE
Air Force Research Laboratory AFRL 2977 Hobson Way
WPAFB, OH 45433
Naval Research Laboratory 4555 Overlook Avenue, SW Washington, DC 20375
Intentionally Left Blank Intentionally Left Blank
Page | 5
C-9.0 Special Fuels Performance Requirements: Due to mission demands, DLA Energy may request special petroleum sampling, handling and testing for distinguished visitors, according to the table below. Laboratory testing must be within local area. Specifics shall be given as guidance if a requirement is requested. See section C-5.5 for testing turn-around times for these special fuel requests.
fme9865 Highlight fme9865 Highlight
Page | 6
Attachment 1: Products to be Tested The following are products, which are utilized by DLA Energy and its customers that may require testing, at the contractor’s facility, per the requirements in this SOW. Contractors should become familiar with all of the product specifications listed below and develop operating procedures and/or checklists to allow their technicians to perform the proper tests and complete the tasks as requested under the order and in a timely manner. All referenced material can be obtained at http://quicksearch.dla.mil/ or https://assist.dla.mil/ or by contacting Contracting Officer, Contracting Officers Representative and/or Quality Assurance Representative.
1) Aviation Turbine Fuel, Grade JET A and JET A-1, NATO F-35 (Specification: ASTM D1655, DEF Stan 91-091, latest version)
2) Turbine Fuel, Aviation, Kerosene Types, NATO F-34 (JP8) (Specification: MIL-DTL-83133, latest version)
3) Turbine Fuel, Aviation, NATO F-44 (JP-5) (Specification: MIL-DTL-5624, latest version)
4) Fuel, Navy Distillate NATO F-76 (Specification: MIL-DTL-16884, latest version)
5) Gasoline, Aviation, Grade 100LL (Specification: ASTM D910, DEF STAN 91-090, latest version)
6) Turbine Fuel, Aviation, Thermally Stable, Grade JPTS (Specification: MIL-DTL-25524 latest version)
Note: Some locations provide the above products which meet locally established specifications. If the U.S. Government is in receipt of any of the above fuel grades with local specification(s), DLA Energy will provide the contractor(s) the local specification and the test method(s) required if requested.
Page | 7
Attachment 2: MIL-STD-3004-1 Testing Series Defined (B-1, B-2, B-3 & C series) Listed below are tests by name and series that shall be required to be performed on petroleum products at the contractor’s laboratory in accordance with MIL-STD-3004-1 (latest version). Tests shall be requested by task order (written or verbal) by the series or individually by contracting officer. Only the contracting officer can obligate the government.
Page | 8
Page | 9
Attachment 3: Testing Requirements
Table 1: Aviation Turbine Fuels
Def Stan 91-
Jet A/A-1 (ASTM D1655)
JP-8 (MIL-DTL-
83133)
JPTS (MIL-DTL-
25524)
JP-5 (MIL-DTL-
5624)
Appearance Visual Visual Visual Visual Visual Color (Visual) Visual Visual Visual Visual Visual Density or API
Gravity
IP365,
D4052
D1298, IP160,
D4052, IP160,
IP365
D1298, IP160, D4052 D1298, IP160, D4052,
D7777
D1298, IP 160,
D4052 D7777
Particulate Matter
IP423,
D6045, IP564,
IP565, IP577
N/A D2276, D5452 (referee)
D5452 D2276, D5452 (referee)
Distillation IP123, D86 D86, D2887, IP406, D7345, IP123
D86 (referee), D2887, D7345
D86 (referee), D2887 D86 (referee) , D7345, D2887
Copper Strip Corrosion
IP154, D130 D130 D130 D130 D130
Freezing Point IP16, D2386 D5972, IP435, D7153, IP529, D7154, IP528, D2386, IP16
D2386 (referee), D5972
D2386 (referee), D5972, D7153, D7154
D2386 (referee), D5972, D7153, D7154
Existent Gum IP 540 D381, IP540 D381(referee), IP540 D381(referee), IP540 D381(referee), IP540 Flash Point IP 170 D56, D93, D3828, IP170, IP523
D56, D93(referee), D3828, IP170
D56, D93(referee), D3828
D56, D93 (referee), D3828
Water Reaction
N/A N/A D1094 N/A N/A
Lead Content D5059 D5059 D5059 D5059 D5059
FSII IP424,
D5006 D5006 D5006 D5006 D5006
Filtration Time N/A N/A D2276, D5452 (referee)
D5452 D2276, D5452( referee)
MSEP D3948 D3948 D3948,
D7224 (referee)
D3948, D7224 (referee)
D3948, D7224 (referee)
Conductivity IP274, D2624
D2624 N/A N/A N/A
Thermal Stability
IP323.
D3241
D3241 (Annex A3 is referee) See C- 5.4.1
D3241 (Annex A3 is considered referee) See C-5.4.1
D3241 (Annex A3 is considered referee) See C-5.4.1
D3241 (Annex A3 is referee) See C-5.4.1
Color (Saybolt) D156, D6045 D156 D156 (referee) , D6045
D156 (referee), D6045 D156 (referee), D6045
Acid Number IP354, D3242
D3242, IP354 N/A D3424 D3242
Peroxide Number
D3703 N/A N/A N/A
FAME IP 585, IP
D7797, IP583,
IP585 (referee), IP590, IP599
N/A N/A D7797, IP583, IP585
(referee), IP590, IP599
Page | 10
Table 2: Aviation Gasoline
Def Stan 91-090 Leaded AvGas ( ASTM D910) Appearance Visual Visual
Color (Visual) Visual Visual Density or API Gravity IP365, D4052 D1298, IP160, D4052
Distillation IP123, D86 D86 Copper Strip Corrosion IP154, D130 D130
Existent Gum IP131, D381 D381 Vapor Pressure IP69, D323 D323, D5191
Free Water Determination D6986 D6986 Lead Content IP270, D3237 D3341, D5059 Potential Gum IP138, D873 D873
Table 3: Marine Diesel
Def Stan 91-4 F-76 (MIL-DTL-16884)
Appearance D4176 D4176 Color (Visual) IP196 D1500 (referee), D6045
Density or API Gravity IP365, D4052 D1298, IP160, D4052, D287, D7777 Distillation IP123, D86 D86 (referee), D2887 Flash Point IP34, IP523 D93(referee), D6450, D3828
Carbon Residue IP398 D524(referee), D189, D4530 Cloud Point IP219, IP444, D5771 D2500(referee), D5771, D5772, D5773
Pour point (F-76 only) IP15, D97 D97(referee), D5949, D5950, D5985 Copper Strip Corrosion IP154 D130
Cetane Index D613, IP498 D976, D613(if non-conventional) Viscosity (F-76 only) IP71, D445 D445, D7042
Water and Sediment by Centrifuge N/A D2709 Particulate N/A D6217
Storage Stability D5304, IP388, D2274 D5304 (referee), D2274 Sulfur N/A D5354(referee), D1266, D2622, D3120, D7039
Fatty Acid Methyl Ester (FAME) (F-76 only)
IP579 BS EN 41078, IP579, D7963
Lubricity (F-76 only) IP 450 ASTM D6079 (referee), ASTM D7688
Page | 11
Attachment 4: Annual Estimates by Location:
Table listed below illustrates the annual estimated work by fuel grade to be performed by location. Attachment 2 defines the tests that makeup a series (slate) in accordance with MIL-STD-3004-1. Individual test shall be requested from any test in the B or C series but most common will be retests following a testing failure. Due to unpredictable situations unable to state the exact tests that will be requested but a historical series average.
Location
Grade
Type and
Number
Grade Type and
Type and Number
Djibouti, Free Zone
Jet A/A-1 JP-5 JP-8 F-76 AVGAS
B-1 Series 3 B-1 Series 1 B-1 Series 3 B-1 Series 5 B-1 Series 2 B-2 Series 0 B-2 Series 5 B-2 Series 0 B-2 Series 5 B-2 Series 2 B-3 Series 0 B-3 Series 1 B-3 Series 0 B-3 Series 2 B-3 Series 2 C Series 5 C Series 1 C Series 5 C Series 5 C Series 5
Individual 5 Individual 5 Individual 10 Individual 5 Individual 10 Augusta, Sicily Jet A/A-1 JP-5 JP-8 F-76
B-1 Series 2 B-1 Series 0 B-1 Series 0 B-1 Series 0
B-2 Series 0 B-2 Series 6 B-2 Series 0 B-2 Series 3
B-3 Series 0 B-3 Series 0 B-3 Series 0 B-3 Series 0
C Series 2 C Series 5 C Series 0 C Series 3
Individual 5 Individual 6 Individual 0 Individual 0
Turkey Jet A/A-1 JP-5 JP-8 B-1 Series 5 B-1 Series 0 B-1 Series 11
B-2 Series 0 B-2 Series 0 B-2 Series 5
B-3 Series 5 B-3 Series 5 B-3 Series 5
C Series 5 C Series 0 C Series 10
Individual 10 Individual 10 Individual 10 Akrotiri, Cyprus JPTS
B-1 Series 2
B-2 Series 0
B-3 Series 5
C Series 2
Individual 5
Rota, Spain Jet A/A-1 JP-5 F-76 JP-8 B-1 Series 10 B-1 Series 10 B-1 Series 10 B-1 Series 10
B-2 Series 5 B-2 Series 5 B-2 Series 5 B-2 Series 5
B-3 Series 5 B-3 Series 5 B-3 Series 5 B-3 Series 5
C Series 10 C Series 10 C Series 10 C Series 10
Individual 10 Individual 10 Individual 10 Individual 10 Shannon, Ireland Jet A/A-1 JP-8
B-1 Series 0 B-1 Series 0
B-2 Series 15 B-2 Series 15
B-3 Series 0 B-3 Series 0
C Series 0 C Series 0
Individual 15 Individual 15
| Attachment 1: Products to be Tested |
| Note: Some locations provide the above products which meet locally established specifications. If the U.S. Government is in receipt of any of the above fuel grades with local specification(s), DLA Energy will provide the contractor(s) the local specif... |
| Attachment 2: MIL-STD-3004-1 Testing Series Defined (B-1, B-2, B-3 & C series) |
| Listed below are tests by name and series that shall be required to be performed on petroleum products at the contractor’s laboratory in accordance with MIL-STD-3004-1 (latest version). Tests shall be requested by task order (written or verbal) by th... |
| Attachment 3: Testing Requirements |
File details come from the government source that posted it.