Amended AFRL Edwards LN2 SOO 11 Mar 2024.pdf

PDF 183 KB Posted

Attached to
SPE60123R0313 WEST PPN 9. 1d Federal contract opportunity
Solicitation number
SPE60123R0313
Issued by
Defense Logistics Agency Energy

About this file

This document is a Statement of Objectives (SOO) for the delivery of Liquid Nitrogen (LN2) to the Air Force Research Lab (AFRL) at Edwards Air Force Base in California. The customer is the Defense Logistics Agency (DLA) Aerospace Energy Business Unit, who is the Department of Defense (DoD) Integrated Materiel Manager for Aerospace Energy products and related services.

The SOO outlines the requirements for the Contractor to provide all necessary product, materials, supplies, management, tools, equipment, transportation, and labor to deliver the requested LN2 to the specified government-owned tanks at AFRL. The LN2 must meet MIL-PRF-27401H requirements and the Contractor must provide a Certificate of Analysis for each delivery. Routine deliveries are required within 7 days and expedited deliveries within 3 days of receipt of an order. The SOO also details the government-owned storage tanks the LN2 must be delivered to, the estimated annual and monthly requirements, and the contractor's responsibilities for monitoring and maintaining the GN2 conversion and distribution system. Inspection and acceptance will be performed at the destination, and the Contractor must provide a backup liquid pump assembly and coordinate equipment installation and removal.

View the file

Other files for this federal contract opportunity

Other files attached to SPE60123R0313 WEST PPN 9. 1d, newest first.
File Type Posted
Amended AFRL Edwards LN2 SOO 11 Mar 2024.docx DOCX document
AE-A6-SPE60123R0313-Schedule of Supplies Pricing Form Amended.xlsx XLSX spreadsheet
SF30_SPE60123R0313-0006.pdf PDF
SF30_SPE60123R0313-0005 CO signed.pdf PDF
SF30_SPE60123R03130004.pdf PDF
SPE60123R0313-0003.pdf PDF
SPE60123R0313-0002.pdf PDF
SPE60123R0313-0001.pdf PDF
SPE60123R0313.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The customer STATEMENT OF OBJECTIVES

TSW – CDSEDWRDS2

11 Mar 2024

Scope: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Liquid Nitrogen (LN2) to Edwards AFB, CA into a Government-owned tank at the Air Force Research Lab (AFRL) Gaseous Nitrogen (GN2) Conversion Facility. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to AFRL at Edwards AFB, CA.

Product: LN2 (NSN 9135-01-665-3253), Type II, Grade B shall meet the requirements of MIL-PRF-27401H.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to the customer at the end of the pipeline.

Product Delivery: Routine deliveries shall be made within 7 days after receipt of an order from the appointed Delivery Scheduler. Expedited deliveries shall be made within 3 days after receipt of an order from the appointed Delivery Scheduler.

Product deliveries shall be made to the following address:

Edwards AFB - Air Force Research Lab (AFRL) 1 Polaris Rd GN2 Conversion Plant, Bldg. 8371 Edwards AFB, CA 93524

Description of Government-Owned LN2 Tanks:

LN2 shall be delivered into the following Government-owned storage vessels listed below. The storage vessels will be trailer accessible.

Qty. Capacity (Gallons) Tank Location Annual Requirement (Tons) MAWP (PSIG)

1 28000 Bldg. 8372 (GN2 Pump House) 4800 2000

1 3000 Bldg. 8595 (EP Lab) 14 250 2 26000 Area 1-120 (TS2A) 1400 20 1 14000 Area 1-14, Bldg. 8620 18 125 1 14000 Area 1-14, Bldg. 8620 18 100 1 1000 Area 1-14, Bldg. 8620 10 125 1 1500 Area 2-10, Bldg. 8424 5 250 1 600 Area 2-10, Bldg. 8451 60 200

1 1500 Area 2-10, Bldg. 8451 60 250 1 3000 Area 2-10, Bldg. 8451 80 250 1 600 Area 1-30 10 250 1 36250 Area 1-32 15 4200 2 14000 Area 1-42 47 85 1 25000 Area 1-52 47 125

Est. Annual Requirement (tons): 6584

Est. Monthly Requirement

(tons): 549

Fill Line Restriction Orifice: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

Tank Hot Fill: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

Contractor Equipment and Service Requirements for GN2 Conversion Facility:

The LN2 is converted to GN2, compressed and delivered through an existing Government owned, 1 inch GN2 pipeline system. Approximate length of the pipeline is 12 miles. The system shall be monitored daily by an on-site Contractor representative, Monday-Friday, 0700-1600 hours, and on rare occasions on weekends. Monitoring the system includes reading and interpreting various system flow instrumentation and making pressure and flow adjustments as required to support GN2 pipeline flow requirements. Contractor operator may be required to work overtime to include extended weekday shifts and possibly weekends to support emergency and priority demands. The requirement to operate the GN2 facility beyond the normal 0700-1600 hours, Monday-Friday is expected to be about 600 hours per year and may exceed this estimate depending on the emergency and priority demands.

The Contractor shall provide one liquid pump assembly for backup of the GN2 conversion system at the GN2 Conversion Facility to assure continuous uninterrupted supply. The Contractor supplied pump must be equal in capabilities to existing on-site Government pumps which are manufactured by Nikkiso Cryogenics Industries with part number 15320-10 and serial numbers 134061 and 131561, three piston type with flow rate of 14.6 gallons per minute. The backup system is required to be operable within 4 hours of Government pump failure. The cost for install and removal of pumps will be included in the Monthly Facility Fee. The Contractor shall operate the high pressure GN2 system and provide uninterrupted supply of GN2 to the existing Air Force high-pressure pipeline at Edwards AFB.

Inspection and Acceptance: Inspection for quality shall be performed at origin.

Quantity determination and acceptance by the customer shall be at destination.

Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

Contractor-Provided Equipment Installation: Contractor shall install their Contractor provided equipment, a backup liquid pump assembly, within the existing system footprints, no later than 30 calendar days from start of contract performance. The Contractor shall also perform all inspections and maintenance of Contractor provided equipment to assure systems provide safe and uninterrupted support. The Contractor will coordinate with the current supplier to effect removal of current equipment and installation of new equipment, or to retain the current equipment. The Contractor may be required to provide a temporary system during change out of existing system or tanks to eliminate any delay in supply of product.

Contractor-Provided Equipment Removal: Contractor provided equipment shall be removed by the Contractor within 30 calendar days after contract termination. The Contractor will coordinate with the follow-on supplier to effect removal of current equipment and installation of new equipment.

Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Some locations will require delivery personnel be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.

File details come from the government source that posted it. Updated .