This document is a Statement of Objectives (SOO) for the delivery of Liquid Nitrogen (LN2) to the Air Force Research Lab (AFRL) Gaseous Nitrogen (GN2) Conversion Facility at Edwards Air Force Base, California. The SOO outlines the DLA's requirements for the LN2 product, delivery schedule, government-owned storage tanks, and contractor responsibilities.

The key objectives include: providing LN2 that meets MIL-PRF-27401H specifications, making routine deliveries within 7 days and expedited deliveries within 3 days, monitoring and maintaining the GN2 conversion and pipeline system, and installing a backup liquid pump assembly. The annual LN2 requirement is estimated at 6,584 tons. The contractor must be able to perform hot fills and work overtime as needed to support emergency and priority demands. Inspection is performed at origin, and quantity acceptance is at destination. The contractor must provide U.S. citizen delivery personnel who meet security requirements for accessing the military installation.

View the file

Other files for this federal contract opportunity

Other files attached to SPE60123R0313 WEST PPN 9. 1d, newest first.
File Type Posted
Amended AFRL Edwards LN2 SOO 11 Mar 2024.pdf PDF
AE-A6-SPE60123R0313-Schedule of Supplies Pricing Form Amended.xlsx XLSX spreadsheet
SF30_SPE60123R0313-0006.pdf PDF
SF30_SPE60123R0313-0005 CO signed.pdf PDF
SF30_SPE60123R03130004.pdf PDF
SPE60123R0313-0003.pdf PDF
SPE60123R0313-0002.pdf PDF
SPE60123R0313-0001.pdf PDF
SPE60123R0313.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The customer STATEMENT OF OBJECTIVES

TSW – CDSEDWRDS2

11 Mar 2024

Scope: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Liquid Nitrogen (LN2) to Edwards AFB, CA into a Government-owned tank at the Air Force Research Lab (AFRL) Gaseous Nitrogen (GN2) Conversion Facility. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to AFRL at Edwards AFB, CA.

Product: LN2 (NSN 9135-01-665-3253), Type II, Grade B shall meet the requirements of MIL-PRF-27401H.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to the customer at the end of the pipeline. Comment by Mayfield, Alex M CIV DLA ENERGY (USA): What does this term mean? Is this the Tech residing at the source of the pipeline? Or is this the customer at the end of the pipeline?

Product Delivery: Routine deliveries shall be made within 7 days after receipt of an order from the appointed Delivery Scheduler. Expedited deliveries shall be made within 3 days after receipt of an order from the appointed Delivery Scheduler.

Product deliveries shall be made to the following address:

Edwards AFB - Air Force Research Lab (AFRL) 1 Polaris Rd GN2 Conversion Plant, Bldg. 8371 Edwards AFB, CA 93524

Description of Government-Owned LN2 Tanks:

LN2 shall be delivered into the following Government-owned storage vessels listed below. The storage vessels will be trailer accessible.

Qty.
Capacity (Gallons)
Tank Location
Annual Requirement (Tons)
MAWP (PSIG)
1
28000
Bldg. 8372 (GN2 Pump House)
4800
2000
1
3000
Bldg. 8595 (EP Lab)
14
250
2
26000
Area 1-120 (TS2A)
1400
20
1
14000
Area 1-14, Bldg. 8620
18
125
1
14000
Area 1-14, Bldg. 8620
18
100
1
1000
Area 1-14, Bldg. 8620
10
125
1
1500
Area 2-10, Bldg. 8424
5
250
1
600
Area 2-10, Bldg. 8451
60
200
1
1500
Area 2-10, Bldg. 8451
60
250
1
3000
Area 2-10, Bldg. 8451
80
250
1
600
Area 1-30
10
250
1
36250
Area 1-32
15
4200
2
14000
Area 1-42
47
85
1
25000
Area 1-52
47
125
Est. Annual Requirement (tons):
6584
Est. Monthly Requirement (tons):
549

Fill Line Restriction Orifice: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

Tank Hot Fill: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

Contractor Equipment and Service Requirements for GN2 Conversion Facility: The LN2 is converted to GN2, compressed and delivered through an existing Government owned, 1 inch GN2 pipeline system. Approximate length of the pipeline is 12 miles. The system shall be monitored daily by an on-site Contractor representative, Monday-Friday, 0700-1600 hours, and on rare occasions on weekends. Monitoring the system includes reading and interpreting various system flow instrumentation and making pressure and flow adjustments as required to support GN2 pipeline flow requirements. Contractor operator may be required to work overtime to include extended weekday shifts and possibly weekends to support emergency and priority demands. The requirement to operate the GN2 facility beyond the normal 0700-1600 hours, Monday-Friday is expected to be about 600 hours per year and may exceed this estimate depending on the emergency and priority demands.

The Contractor shall provide one liquid pump assembly for backup of the GN2 conversion system at the GN2 Conversion Facility to assure continuous uninterrupted supply. The Contractor supplied pump must be equal in capabilities to existing on-site Government pumps which are manufactured by Nikkiso Cryogenics Industries with part number 15320-10 and serial numbers 134061 and 131561, three piston type with flow rate of 14.6 gallons per minute. The backup system is required to be operable within 4 hours of Government pump failure. The cost for install and removal of pumps will be included in the Monthly Facility Fee. The Contractor shall operate the high pressure GN2 system and provide uninterrupted supply of GN2 to the existing Air Force high-pressure pipeline at Edwards AFB. Comment by Mayfield, Alex M CIV DLA ENERGY (USA): equal

Inspection and Acceptance: Inspection for quality shall be performed at origin. Quantity determination and acceptance by the customer shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment. Comment by Mayfield, Alex M CIV DLA ENERGY (USA): Here it says quality inspection is a origin, so again, why would you need a tech, stationed at the destination, to guarantee the product for testing, when it has already been inspected and accepted at origin?

Contractor-Provided Equipment Installation: Contractor shall install their Contractor provided equipment, a backup liquid pump assembly, within the existing system footprints, no later than 30 calendar days from start of contract performance. The Contractor shall also perform all inspections and maintenance of Contractor provided equipment to assure systems provide safe and uninterrupted support. The Contractor will coordinate with the current supplier to effect removal of current equipment and installation of new equipment, or to retain the current equipment. The Contractor may be required to provide a temporary system during change out of existing system or tanks to eliminate any delay in supply of product.

Contractor-Provided Equipment Removal: Contractor provided equipment shall be removed by the Contractor within 30 calendar days after contract termination. The Contractor will coordinate with the follow-on supplier to effect removal of current equipment and installation of new equipment.

Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Some locations will require delivery personnel be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.