View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE601 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60122R0305

X

2022 MAR 10

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY AEROSPACE ENRGY-DLAE-M

BLDG 1621

1014 BILLY MITCHELL BLVD

SAN ANTONIO TX 78226

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

Opening/Closing Date Changed to:

2022 MAR 10 / 2022 APR 25

TIME 2:00 PM

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 4 PAGES

SPE60122R0305 - 0004

The purpose of amendment 0004 is to:

A .Change the closing date FROM: 15 April 2022, at 2:00 PM Central Daylight Time (CMT) TO: 25 April 2022, at 2:00 PM Central Daylight Time (CMT).

B. Provide responses to Industry questions:

1) Can the bulk tanks be filled during testing?

Government Response: No. During testing the facility is in a strict “remote operations” status due to the hazards associated with firing experimental liquid rocket engines. The tanks may be filled prior to testing and approximately 1 hour following a rocket engine test.

2) Please provide equipment schematics for all government-owned equipment for all products.

Government Response: Attachment A is a basic schematic for the LH2 tank. The other tank is identical with the exception of the flare stack connection and total tank volume. Attachment A is embedded in the SF- 30 at the paperclip

3) Will the government consider adding additional government-owned or contractor-owned storage for the LN2 or LH2.

Government Response: We currently lack funding to add additional storage capability. The project may be funded in the future to add storage capability, but for the foreseeable future there will be no additional storage.

4) Clarify storage for LN2 and LH2 for each product - equipment drawings, description of fittings, and provide pictures?

Government Response: We do not have drawing that we can release. The trailer connection is currently a 2” Class 150 Raised Face ANSI flange, but we will build / buy whatever fitting the trailer offload requires.

5) When is initial liquid nitrogen (LN9) delivery required and estimated quantity?

Government Response: Initial required deliveries on 1 Jul 22 and 1 Aug 22. The 100 TNs of LN2 is needed over the entire month. The first fill will be roughly 50 TNs to chill and fill tanks. Subsequent deliveries will be roughly once a week and require around 25 TNs.

6) What is the liquid nitrogen (LN9) delivery frequency, quantities of fills, per day, per week, per month and how much time between cycles?

Government Response: Approximately 5,000 gallons per fill. Approximately three needed per week.

7) Is there a surge period for liquid nitrogen (LN9), if so when and how often?

Government Response: No.

8) When is initial liquid hydrogen (LHB) delivery required and estimated quantity?

Government Response: Currently estimated in the October to November timeframe. Initial quantity will be approximately 16,500 gallons to chill-in and fill the propellant tank.

9) What is the liquid hydrogen (LHB) delivery frequency, quantities of fills, per day, per week, per month and how much time between cycles?

Government Response: 4,000 – 7,000 gallon deliveries will be needed. The frequency will start out slower in the beginning and growing to 2-3 per week during test campaigns.

10) Is there a surge period for liquid hydrogen (LHB), if so when and how often?

Government Response: There should be no surges. The only times when more may be needed is if the tank needs to be drained. That would then require a 16,500 gallon delivery to chill and fill the tank.

11) When is initial gaseous hydrogen (GH2) delivery required?

Government Response: October / November timeframe

12) What is gaseous hydrogen (GH2) delivery frequency, quantities of fills, per day, per week, per month and how much time between cycles?

Government Response: GH2 trailer swapout will be a function of trailer size and pressure. With a standard size assumed, we should be able to get about 4 tests before needing a swap. Estimated need is 1 trailer per week.

13) Is there a surge period for gaseous hydrogen (GH2), if so when and how often?

Government Response: No.

14) In accordance with statement of objectives, tank 1 shows that it is a high-pressure tank at 500 and tank 2 shows standard pressure. Will tank 1 have a pump or is it maintained at a lower pressure? (This may require tank venting to fill unless there is a pump onsite).

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 3 OF 4 PAGES

Government Response: Both tanks will be operated at near atmospheric pressures (less than 10 psig) during offloads and storage periods. They will only be pressurized during engine firings.

15) Are Site Visit available?

Government Response: Yes,in accordance with solicitation Attachment B - DLA Contract Text Clause L-0004 L54.02 SITE

VISIT (AEROSPACE ENERGY) (DLA ENERGY APR 2006)

(a) It is the responsibility of the offerors to inspect the site where supplies are to be delivered and/or services are to be performed and to obtain all available information about the site necessary to satisfy themselves about general and local conditions that may affect delivery as well as cost of contract performance, to the extent that the information is reasonably obtainable. Offerors are responsible for any costs incurred for any site inspection and for obtaining information.

(b) In no event shall failure to inspect the site constitute grounds for a claim after contract award.

(c) Offerors who are interested in a site inspection should not contact the customer(s) directly, but forward such request(s), in writing, directly to the DLA Energy Point of Contact for this procurement, shown in Block 7 of the Standard Form 1449.

Offerrors interested in participating in the site inspection on Tuesday, April 19, 2022, shall immediately notify the Contracting Officer at email: tammie.campbell@dla.mil. Site visit request shall include name (s), phone number(s), and email(s) of personnel attending the visit .

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 4 PAGES

Attachments

List of Attachments

Description File Name ATTACH_LH2_Tank_Sche matics 22-R-0305 BE7 Liquid

Rocket Engine Test Prg

2) Please provide equipment schematics for all government-owned equipment for all products.

Government Response: Attached is a basic schematic for the LH2 tank. The other tank is identical with the exception of the flare stack connection and total tank volume.

DTC0095