About this file
SOO Trident Kings Bay, GA RFP-19R0321
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_Questions_SPE60119R0321_Argon_Norfolk-Trident.pdf | ||
| MIL-PRF-27415C.pdf | ||
| SPE60119R0321_RFP-Argon_Norfolk_Trident.pdf | ||
| QAPs_Argon_Norfolk_Trident.pdf | ||
| Aero_Contract_Text_Provisions_Clauses_Argon_Norfolk_Triednt.pdf | ||
| SECNAV_5512_1_BACKGROUND_CHECK_FORM.pdf | ||
| Norfolk_Argon-Statement_of_Objectives.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TSW – CDSTRIDENT
STATEMENT OF OBJECTIVES (SOO)
Trident Kings Bay, GA 8 February 2019
PPN: 9.4a
9135-01-665-8775 – Liquid Argon
Delivery Notes:
Liquid Argon (9135-01-665-8775), shall meet the requirements of Type II, Grade B, (Bulk), (99.985%) Purity IAW MIL-PRF-27415C Performance Specification, Propellant Pressurizing Agent, Argon dated 7 August 2013.
The Contractor shall provide all production, materials, supplies, management, tools, equipment, transportation, and labor necessary for the delivery of Liquid Argon F.O.B. Destination into Government-owned tanks at Trident Facility, Kings Bay, GA.
In addition to the reports required elsewhere within this contract, one copy of a Certificate of Analysis (COA) for each sample required by the specification shall be submitted as an attachment to the applicable Wide Area Workflow (WAWF) Combo document. The quarterly testing results for CO2 and Hydrogen shall be included along with the copy of the Certificate of Analysis for each load.
PRODUCT ORDERING:
The DLA Energy Contracting Officer shall issue individual Delivery Orders (DD Form 1155) for obligation of funds for shipments to be scheduled during that specific timeframe by the appointed Delivery Scheduler. The individual shipments requested by the appointed Delivery Scheduler will designate the specific quantity to be delivered at the customer location specified in the contract.
PRODUCT DELIVERY:
For routine Liquid Argon deliveries, product shall be delivered within five (5) business days after receipt of an order from the Delivery Scheduler.
For emergency deliveries, product shall be delivered within two (2) business days after receipt of an order from the Delivery Scheduler.
Deliveries shall be made Monday thru Friday, 0800-1300, excluding federal holidays.
Product deliveries shall be made to the following address:
Trident Refit Facility Bldg. 5085 Shop 11A and Shop 26A NSB Kings Bay, GA 31547
TSW – CDSTRIDENT
STATEMENT OF OBJECTIVES (SOO)
Trident Kings Bay, GA 8 February 2019
DESCRIPTION OF GOVERNMENT-OWNED Liquid Argon TANK:
Argon shall be delivered into the following Government-owned storage vessel listed below. The storage vessel will be trailer accessible.
Location Number of Tanks Tank Capacity (gallons)
MAWP*
Bldg. 5085, 11A 1 1,500 GL 250 psig Bldg. 5085, 26A 1 1,500 GL 250 psig
*MAWP (Maximum Allowable Working Pressure)
INSPECTION AND ACCEPTANCE:
Inspection for quality shall be performed at origin. Quantity determination and acceptance shall be at destination.
METHOD OF MEASUREMENT:
Quantity determination to be performed by use of certified Government weight scales available at the delivery location Monday-Thursday (0700-1630) and Friday (0700-1530).
SECURITY REQUIREMENTS:
The Contractor will be required to in-process at the AFRL site gate and be escorted at all times within the site. There will be no additional security requirements.
SERVICE LINE ITEMS:
SE0000177 – EXPEDITED/EMERGENCY DELIVERY—Product shall be delivered within two (2) business days after receipt of an order from the appointed Delivery Scheduler.
SE0000179 – DETENTION COST—Transport truck and trailer free time and detention rate delivered F.O.B. Destination.
SE0000181 - TANK OVER-PRESSURE PROTECTION—If it is determined during supplier site visits or upon review of tank technical information that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure During filling of Cryogenic Vessels, the Contractor shall provide and install the additional tank protection, which may encompass any of the methods identified in the P-59.
NOTE: Over-protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).
SE0000183 - HOT FILLS—Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.
PRODUCT DELIVERY: