SPE601-19-R-0309.pdf

PDF 8 MB Posted

Attached to
SPE601-19-D-1525 TINKER AFB, OK
Solicitation number
SPE601-19-R-0309
Issued by

View the file

Other files

File Type Posted
SPE60119R0309_-_0006.pdf PDF
Amend_004_SPE601919R0309.pdf PDF
Anniston_Army_Depot_LOX_SOO_5_Feb_19.pdf PDF
SPE60119R0309-0005.pdf PDF
Amend_004_SPE601919R0309.pdf PDF
SPE60119R0309_-_0003.pdf PDF
SPE60119R0309_-_0002.pdf PDF
SPE60119R0309_-_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 1

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR, VIRGINIA 22060-6222

DISTRIBUTION STATEMENT – A: APPROVED FOR PUBLIC RELEASE. DISTRIBUTION IS UNLIMITED

Signature

Prepared by:

Quality/Technical Support

Office Approval:

Contracting Approval:

C1.02 ASSIST DATABASE OF SPECIFICATIONS (DEC 2016)

Unless otherwise specified, current versions of defense or federal specifications and standards, military handbooks, commercial item descriptions, qualified product lists, and other related technical documents cited in this solicitation/contract can be accessed from the Department of Defense (DoD) Acquisition Streamlining and Standardization Information System

(ASSIST) database at https://assist.dla.mil under ASSIST-Quick Search or http://quicksearch.dla.mil. ASSIST is the official source for all Defense Standardization Program documents and contains the most current information on documents prepared by DoD, as well as information on how to acquire referenced non-Government standards that have been adopted for

DoD use. Note that commercial or foreign specifications are not located on ASSIST and must be obtained from the relevant sponsoring organization (e.g. ASTM, SAE, API, ISO, etc.). Registered ASSIST account holders may establish profiles to receive automatic E-mail alerts when changes are planned or made to documents of interest by selecting criteria on the [Alert

Portal Profile Maintenance] screens accessed from the [User Profile] menu. Users may also view or download a bi-monthly summary of changes to the ASSIST database under the [ASSIST Update] menu.

Basic instructions on how to use ASSIST:

1. Go to http://quicksearch.dla.mil/.

2. Type in the numeric portion of the specification or Qualified Product List (QPL) and click on the Search button.

3. Look through the search results to find the desired document and click on the Document ID.

a. For specifications: click on the .pdf link under Media.

b. For QPL information: click on the View Qualified Product Database (QPD) data link to open the QPD

i. Click on the link in the “Govt Designation” Column to view qualified products

1. To view qualified source plants, click on the Source Plants link under the Related Links column http://quicksearch.dla.mil/

2017-08-07T09:00:32-0400

TAYLOR.LORI.L.1391585080

2017-08-07T09:22:23-0400

SHEPHERD.SANDRA.S.1012568459

2017-11-20T09:19:52-0500

BANISZEWSKI.DANIEL.J.1287388698

PDF (DLA)DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET 1 OF 1PREVIOUS EDITION IS USABLE Add Continuation Page

Print Form Email Form Clear Export Data Import Data About Check for Newer Version Contact Us

REV DESCRIPTION DATE APPROVED

ENERGY QAP E1.15 September 2013

REVISIONS

E1.15 CONTRACTOR INSPECTION RESPONSIBILITIES (AEROSPACE ENERGY)

(a) QUALITY CONTROL PLAN.

(1) The Contractor is required to provide and maintain an inspection system, and a written description (Quality Control Plan (QCP)) of that system, acceptable to the Government. The Contractor has the option to provide and maintain an inspection system that, as a minimum, incorporates the requirements of ISO9001, Quality Management Systems. If the Contractor chooses to comply with the ISO9001 quality system requirements and format, all the specific Quality Assurance Provisions of this contract must be included in the resulting ISO9001 document that will serve as the QCP. A copy of the QCP, in English, shall be presented to the Government Quality Assurance Representative (QAR) for their review and acceptance prior to commencement of production or services. An acceptable QCP is required prior to Government inspection and acceptance of supplies or services. The QCP shall be reviewed and updated when deemed necessary by the Contractor or the Government, to include changes necessary to prevent the recurrence of quality problems. The Contractor must sign and date the original QCP, as well as each subsequent revision. Revisions shall also be presented to the QAR for review and acceptance prior to implementation. When acceptable to the Government, the original QCP, and any revisions, shall be signed and dated by the QAR.

(2) The QCP shall include--

(i) A schematic diagram of plant facilities pertinent to the inspection system indicating all inspection points;

(ii) Sampling procedures.

(iii) Sample testing methods/procedures;

(iv) Analytical and measuring equipment calibration program;

(v) Loading/shipping procedures;

(vi) Records maintenance and reports preparation/distribution; and

(vii) Corrective action procedures.

(3) The Contractor shall require subcontractors to provide and maintain inspection systems that adhere to the requirements in this contract provision.

(b) The Contractor shall perform all inspection tests required by the specification/item description, and any modifications thereof, on the supplies to be furnished under this contract or shall have such tests performed in a laboratory acceptable to the Government. The Contractor shall notify the QAR in sufficient time to permit inspection by the Government. When such tests are performed at origin on supplies to be accepted at destination, documentation that will enable verification of the original test results shall be provided to the Government at the time of acceptance.

DISTRIBUTION

STATEMENT - A

APPROVED FOR

PUBLIC RELEASE

DISTRIBUTION IS

"UNLIMITED"

DATE

07/28/2014

APPROVED BY

07/25/2014

REVIEWED BY

07/24/2014

PREPARED BY

DRAWING NUMBERSCALE

CODE ID NO.

52838

SIZE

NSN

MULTIPLE

ITEM

ENERGY QAP E1.15

DLA Land & Maritime DLA Troop Support DLA Aviation clear

DEFENSE ENERGY SUPPORT CENTER

8725 JOHN J. KINGMAN RD

DLA Energy

PDF (DLA)

DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev:

description: ENERGY QAP E1.15 revdate: September 2013 revapproved:

revcomments:

apprdate: 2014-07-28 apprBy:

reviewdate: 07/25/2014 revBy:

prepdateA: 2014-07-24 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: ENERGY QAP E1.15 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE ENERGY SUPPORT CENTER line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 0.00000000

SHEET 1 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

0 DLA ENERGY QAP E6 AUG 2015 4 AUG 2015

ENERGY QAP E6 CERTIFICATE OF CONFORMANCE. For use when the conditions of FAR 46.504 apply. As INT-E6: MFRs dated 9 Jan 04, 13 Apr 06, 06 Jul 09. As DLAD 52.246-9081: MFR dated 20 Apr

10. As Energy QAP E6: DLA FORM 1889 dated 4 Aug 15.

ENERGY QAP E6 (JUL 2015) CERTIFICATE OF CONFORMANCE

(a) When authorized in writing by the cognizant DLA Energy Contract Administration Office (CAO), the Contractor shall ship with a Certificate of Conformance (COC) any supplies for which the contract would otherwise require inspection at source. In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the COC has been authorized in writing by the CAO, or inspection and acceptance have occurred.

(b) When the contract requires the use of Wide Area Work Flow (WAWF), contractors shall execute COC by including the appropriate indicator in the electronic transaction rather than through inclusion or attachment of the text of the certificate. Government acceptance must still be indicated by a Government official's electronic signature on the WAWF Energy Receiving Report (ERR).

(c) When WAWF use is not required by contract or WAWF processing in unavailable, the Contractor's signed certificate shall be attached to or included on the first page of the Material Inspection and Receiving Report (DD Form 250) or other authorized document, that is distributed to the payment office (Block 12 of the DD Form 250). A copy shall also be sent with the shipment and to the CAO (Block 10 of the DD Form 250);

however, the CAO copy shall only be sent if specifically requested by the Contracting Officer.

(d) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace or correct the rejected supplies or services at the Contractor's expense.

(e) The certificate shall read as follows:

"I certify that on ______________ [insert date], the ______________________________________ [insert Contractor's name] furnished the supplies or services called for by Contract No.

______________________ via ______________________ [Carrier] on ________________________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document."

Date of Execution:_____________________________________________________

08/26/2015

DATEREVIEWED BY

DATEPREPARED BY

DLA ENERGY QAP E6

DEFENSE LOGISTICS AGENCY ENERGY

SHEET 2 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

0 DLA ENERGY QAP E6 AUG 2015 4 AUG 2015

Signature: ___________________________________________________________

Title: _______________________________________________________________

SUPPLEMENTAL QUALITY ASSURANCE PROVISION

(SQAP)

DRAWING NUMBERSCALE CODE ID NO.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 0 description: DLA ENERGY QAP E6 revdate: AUG 2015 revapproved: 4 AUG 2015 revcomments:

apprdate: 2015-08-26 apprBy:

reviewdate:

revBy:

prepdateA:

prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E6 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 1 description: DLA ENERGY QAP E22 revdate: APR 2016 revapproved: 4 APR 2016 revcomments:

apprdate:

apprBy:

reviewdate:

revBy:

prepdateA: 2016-04-04 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E22 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 3.00000000

PROPELLANT,OXYGEN

9135-016653259 FUELS MANAGEMENT TN

869 Third Street Arnold AFB TN 37386-5500

9135-016653259 TINKER AFB OK

3001 STAFF DR POST P73 BLDG 3001

TINKER AFB OK 73145-3303

9135-016653259 NASA WHITE SANDS TESTING FACILITY NM

12600 NASA Road

LAS CRUCES NM 88012

OXYGEN, LIQUID

6830-016664438 ANNISTON ARMYDEPOT AL

7 FRANKFORD AVE

ANNISTON AL 36201-5021

OXYGEN,LIQUID

6830-016664438 NORFOLK NAVALSHIPYARD BLD VA

STRUCTURAL GROUP C 920

PORTSMOUTH VA 23709-5000

E3310 JVIANUFACTURING AND FILLING POINTS AEROSPACE ENERGY a Provide the name complete addresses and telephone number of the manufacturing and filling points for each product to be furnished and identify the filling points as primary or secondary NAME COMPLETE ADDRESS AND TELEPHONE NUMBER OF MANUFACTURING POINTFILLING POINT PRODUCT b Suppliers that list primary and alternate manufacturingfilling points for supporting the same requirement shall provide a 30 calendar day notice to the Government prior to offering an initial shipment from an alternate manufacturingfilling point c For fob origin shipments the contract price shall not be adjusted if a Contractor uses a different fill location other than the primary fill point during contract performance However if the use of the alternate fill point results in increased costs to the Government such as transpo1iation costs the Contractor agrees to reimburse the Government for those increased costs: AVIATOR BREATHING OXYGEN

6830-016442463 CONNECTICUT ANG CT

100 Nicholson Ave Bradley Field East Granby CT 06026-9309

ATTACHMENT 8

CONTRACTOR PERFORMANCE DATA SHEET

Please submit the requested information for government and non-government contracts or subcontracts held (not to exceed five (5) years since completion) for contracts that are similar to the requirements of this solicitation. Those contracts and/or subcontracts submitted may include those still in progress, however they should have a minimum of one year’s performance history.

Please mark this box if you have not performed under contracts that are similar in nature to the solicitation requirements.

REFERENCES:

COMPANY NAME

POINT OF

CONTACT PHONE NUMBER FAX NUMBER

PRODUCT

SUPPLIED QUANTITY

METHOD OF

DELIVERY

PLACE OF

PERFORMANCE

PERIOD OF

PERFORMANCE

SUBCONTRACTING

PLAN

(YES OR NO)

SHEET 1 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

ENERGY QAP E35 December 2011

E35 NONCONFORMING SUPPLIES AND SERVICES

(a) DEFINITION: As used in this contract provision:

Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.

Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).

Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.

(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.

(c) The following procedures shall be used to request a deviation or waiver.

(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor's authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.

(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer.

Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is (800) 286-7633 or (703) 767-8420.

(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS contract provision of this contract.

(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.

5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally agreed upon in support of the deviation or waiver.

If, however, this consideration exceeds $1000, a second contract modification shall be issued reducing the Contractor's obligation to $1000 (the administrative cost of issuing the two required modifications), plus, if appropriate, any cost of Government reinspection or retest performed as a result of the deviation or waiver being granted.

04/18/2014

DATEREVIEWED BY

04/14/2014

PREPARED BY

ENERGY QAP E35

SHEET 2 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

ENERGY QAP E35 December 2011

(d) When notification of nonconforming supplies is received after the supplies have been accepted, and the Government determines not to exercise its right to reject or to require correction under the INSPECTION OF SUPPLIES - FIXED-PRICE, INSPECTION OF SERVICES - FIXED PRICE, or CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS contract provision, then in no event will consideration be less than $500 to cover administrative costs. This $500 fee is in addition to --

(1) Consideration commensurate with the extent of nonconforming supplies; and

(2) Cost of Government reinspection or retest, if necessary.

The administrative fee will apply to each claim letter issued for off-specification product delivered to an activity.

(e) Contractors shall be held responsible for payment of any fines or penalties imposed on a receiving activity by an environmental enforcement agency, resulting from the delivery of nonconforming supplies under a DLA Energy contract.

(f) Repeated tender of nonconforming supplies or services, including those with only minor defects, will be discouraged by appropriate actions, including, but not limited to, rejecting the supplies or services whenever feasible and documenting the Contractor's performance records.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION

(SQAP)

DRAWING NUMBERSCALE CODE ID NO.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev:

description: ENERGY QAP E35 revdate: December 2011 revapproved:

revcomments:

apprdate: 04/18/2014 apprBy:

reviewdate:

revBy:

prepdateA: 2014-04-14 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: ENERGY QAP E35 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

TRANSPORT EQUIPMENT DELAY CERTIFICATE

1. CONSIGNOR 2. CONSIGNEE 3. PRODUCT

4. CARRIER 5. TRAILER NUMBER 6. DATE SHIPPED

7. FREIGHT BILL NUMBER 8. CBL NUMBER 9. SEAL NUMBER

10. LOADING/UNLOADING INFORMATION

DATE RECEIVED TIME DATE RECEIVED TIME

A. ARRIVED D. FINISH

B. ACCEPTED FOR

LOADING/UNLOADING E. UNIT RELEASED

C. START F. TOTAL HOUR HELD

11. REASON FOR DELAY (Make a complete statement adequately describing each segment of delay, amount of time on each delay, and whether delay was the responsibility of carrier or consignee/consignor)

12. DETENTION CERTIFICATION STATEMENT : I certify that the above information is true and correct to the best of my knowledge.

SIGNATURE AND TITLE OF CONSIGNEE SIGNATURE AND TITLE OF SHIPPER SIGNATURE OF DRIVER

13. NOTE TO CARRIER: A copy of "TRANSPORT EQUIPMENT DELAY CERTIFICATE" must accompany each detention invoice to provide documentation for invoice certification and payment.

FORM H-14

Attachment 9

Sheet1

SPE601-19-R-0309 AEROSPACE CONTRACT TEXT

PART I – THE SCHEUDLE

SECTION B- SUPPLIES/SERVICES

B-0001 B1.09-2 SUPPLIES TO BE FURNISHED (INDEFINITE QUANTITY) (AEROSPACE ENERGY) (DLA ENERGY JAN

2012)

(a) This is an indefinite quantity contract for the purchase of supplies (and/or services, if applicable) to be furnished during the contract term. The delivery points, methods of delivery, and estimated quantities are specified in the Schedule as contract line item numbers (CLINs). The quantities shown are best estimates of required Government quantities only. Unless otherwise specified, the total quantity ordered and required to be delivered/loaded may be greater than or less than such quantities as allowed by the VARIATION IN QUANTITY clause.

(b) The following contract text apply ONLY if the applicable box is checked:

(1) [ x ] This is a REQUIREMENTS-TYPE contract. The Government agrees to order from the Contractor and the

Contractor shall deliver, if orders are placed by the DLA Energy Contracting Officer during the contract period, all items awarded under this contract, as allowed by the REQUIREMENTS clause. A Blanket Delivery Order is considered “an order”, for the purposes of this contract text.

(2) [ ] This is an INDEFINITE DELIVERY/INDEFINITE QUANTITY contract. The Government agrees to order from the Contractor and the Contractor shall deliver, if orders are placed by the Contracting Officer during the contract period, at least the quantity of supplies or services designated in the Schedule as the “minimum”, as allowed by the INDEFINITE QUANTITY clause. A Blanket Delivery Order is considered “an order”, for the purposes of this contract text

(3) [ x ] Orders issued by the Ordering Officer at the destination location are considered extensions of the Blanket

Delivery Order issued by the DLA Energy Contracting Officer and, as such, may be issued orally, by facsimile or by electronic commerce methods, as allowed by the ORDERING clause.

(4) [ x ] The unit prices specified below shall be fixed for the term of the contract.

(5) [ ] The prices paid shall be the unit prices specified in subsequent price change modifications issued in accordance with the ECONOMIC PRICE ADJUSTMENT clause or contract text, as contained in the solicitation and any resultant contract.

(6) [ x ] Items of this contract call for f.o.b. destination delivery, unless the item specifies otherwise. The destination for each item is the point of delivery shown in the particular item. Inspection for quality will be at origin with final acceptance at destination. Applicable to CLIN(s)0001, 0006, 0007, 0008, 0009 and 0010.

(7) [ ] F.o.b. destination item(s) called for under this contract shall have shipment quantity determinations performed at destination.

(8) [ ] Items of this contract call for f.o.b. origin delivery, unless the item specifies otherwise. Inspection and acceptance will be at origin. Applicable to CLIN(s) ________________________________________.

(9) [ ] Any offers received for less than the full quantity for each line item will be rejected by the Government.

(10) [ ] A copy of the certified weight ticket shall accompany each shipment.

(11) [ x ] A copy of the Certificate of Analysis shall accompany each shipment.

(12) [ x ] An original and one copy of the H-14 Transport Equipment Delay Certificate shall be provided with each shipment, if applicable.

SECTION C – DESCRIPTION/SPECIFICATIONS

C-0001 C1.02 ASSIST DATABASE OF SPECIFICATIONS (DEC 2016) (AEROSPACE ENERGY) Quality Assurance Provisions (QAPs) See Attachment 2

SECTION D – PACKING AND MARKING

D-0001 D10 PACKAGING REQUIREMENTS (AEROSPACE ENERGY) (DLA ENERGY MAR 2009)

(a) The Contractor shall be responsible for ensuring the hazardous materials shipment is in full compliance with all applicable packaging/packing, marking, labeling, placarding, blocking and bracing, and palletizing and shipping certifications in force and effect on the date of the shipment in accordance with the following applicable rules and regulations for the individual hazard, ultimate destination, and mode of transportation:

(1) Title 49 of the Code of Federal Regulations (49 CFR) -- Packaging.

(2) DLAI 4145.3, Preparing Hazardous Materials for Military Air Shipments.

(3) International Air Transport Association (IATA) -- Dangerous Goods Regulations.

(4) International Civil Aviation Organization (ICAO) -- Technical Instructions for the Safe Transportation of Dangerous Goods by Air.

(5) International Maritime Organization (IMO) -- International Maritime Dangerous Goods (IMDG) Code (for overseas shipments by vessel).

(6) MIL-STD 129, Standard Practice for Military Marking (for military destinations).

(7) MIL-STD-147, Department of Defense Standard Practice, Palletized Unit Loads.

(8) ASME MH 1.8, Wood Pallets.

(b) Contractor commercial packaging (ASTM D 3951) shall also be in compliance with the requirements listed.

D-0002 D15 CONTRACTOR SEAL REQUIREMENT (AEROSPACE ENERGY) (DLA ENERGY OCT 2006)

(a) The Contractor shall place tamper indicating devices (TIDs) such as a seal or cap on the shipping container(s) immediately after filling and sampling. The TIDs shall be placed on the containers in such a manner that pilferage or tampering of the product could only be accomplished by breaking or otherwise destroying the TID. This may require the application of several TIDs on each shipment container.

(b) Where possible, the TID shall be printed with a serial number. The container number and TID number(s) shall be recorded on the certificate of analysis and on the shipping documents. Monthly equipment inventory reports provided to DLA Energy by the Contractor shall include container numbers as well as corresponding TID numbers.

(c) TIDs shall not be removed from a container unless authorized by DLA Energy. If a TID is broken or no longer intact, the Contractor shall contact the Contracting Officer for further instructions. If the Contractor is instructed to place a new TID on the container, the new TID number (if applicable) shall be noted, along with the container number, as stated in paragraph (b) above.

SECTION E – INSPECTION AND ACCEPTANCE

E-0001 E1.15 CONTRACTOR INSPECTION RESPONSIBILITIES (SEP 2013) (AEROSPACE ENERGY) Quality Assurance Provisions (QAPs) See Attachment 3

E-0002 E6 CERTIFICATE OF CONFORMANCE (JUL 2015) (AEROSPACE ENERGY) Quality Assurance Provisions (QAPs) See Attachment 4

E-0003 E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (APR 2016) (DLA ENERGY) Quality Assurance Provisions (QAPs) See Attachment 5

E-0004 E33.10 MANUFACTURING AND FILLING POINST (JUL 2008) (AEROSPACE ENERGY) Quality Assurance Provisions (QAPs) See Attachment 6

E-0005 E35 NONCONFORMING SUPPLIES AND SERVICES (DEC 2011) (AEROSPACE ENERGY) Quality Assurance Provisions (QAPs) See Attachment 7

SECTION F – DELIVERIES AND PERFORMANCE

F-0001 F1.36 DETERMINATION OF QUANTITY (PROPELLANTS, CRYOGENICS AND GASES) (AEROSPACE

ENERGY) (DLA ENERGY APR 2006)

(a) QUANTITY. The quantity of supplies furnished under this contract shall be determined according to one of the following methods:

(1) DELIVERIES INTO OR BY PIPELINE.

(i) F.O.B. ORIGIN.

(A) On items requiring delivery at the Contractor's terminal or plant, the quantity shall be determined by a calibrated flow meter.

(B) The Government retains the right to have a representative witness quantity measurements performed by the Contractor.

(ii) F.O.B. DESTINATION.

(A) At the Government’s option, quantity determinations will be made at the receiving activity on the basis of a calibrated flow meter.

(B) The Contractor has the right to have a representative witness quantity measurements performed by the Government.

(C) If the Government does not opt to perform quantity determinations at the destination (see schedule), the Contractor shall determine quantity on the basis of a calibrated flow meter.

(D) The Government retains the right to have a representative witness quantity measurements performed by the

(2) DELIVERIES BY OTHER THAN PIPELINE.

(i) F.O.B. ORIGIN.

(A) On items requiring delivery at the Contractor's terminal or plant, the quantity shall be determined (at the Contractor's option) on the basis of--

(a) Calibrated flow meter.

(b) Weight using calibrated scales.

(c) Pressure Temperature Fill Charts/Calculations (for gaseous cylinders and tube trailers).

(B) The Government retains the right to have a representative witness quantity measurements performed by the

(ii) F.O.B. DESTINATION.

(A) At the Government’s option, quantity determinations will be made at the receiving activity on the basis of—

(a) Calibrated flow meter.

(B) The Contractor has the right to have a representative witness quantity measurements performed by the Government.

(C) If the Government does not opt to perform quantity determinations at the destination (see Schedule), the Contractor shall determine quantity on the basis of--

(a) Calibrated flow meter.

(D) The Government retains the right to have a representative witness quantity measurements performed by the

(b) MEASUREMENT STANDARDS. Weight scales used in determining net shipping volumes shall be certified as calibrated within the frequency required by local regulation. If no local regulation exists, the frequency of calibration shall be conducted in accordance with weight scale manufacturer recommendation or every six months, whichever is more frequent. All flow meters used in determining product volume shall be calibrated within the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every six months, whichever is more frequent. Pressure gauges and thermometers used to calculate fill quantities for gaseous cylinders and tube trailers shall be calibrated at least every six months. The net quantity shipped shall be reported on the DD Form 250 or commercial equivalent, whichever is applicable.

F-0002 F1.37 DETERMINATION OF QUANTITY FOR AVIATOR’S BREATHING OXYGEN AND LIQUID NITROGEN

(AEROSPACE ENERGY) (DLA ENERGY MAY 2007)

(a) CONUS QUANTITY DETERMINATIONS. The quantity of supplies furnished to CONUS locations under this contract shall be determined at the receiving activity on the basis of a Contractor-furnished (truck/trailer mounted) calibrated flow meter.

(b) OCONUS QUANTITY DETERMINATIONS. The quantity of supplies furnished to OCONUS locations under this contract shall be determined at the receiving activity on the basis of a Contractor-furnished (truck/trailer mounted) calibrated flow meter or weight using calibrated weight scales.

(c) The Government retains the right to have a Government representative witness quantity measurements performed by the Contractor.

(d) MEASUREMENT STANDARDS. All flow meters and weight scales used in determining product volume shall be calibrated within the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter or scale manufacturer or every 12 months, whichever is more frequent. The net quantity shipped shall be reported in whole gallons on the DD Form 250 or commercial equivalent, whichever is applicable.

(e) CONVERSION FACTORS. When meters or weight scales are used to measure in units other than gallons, a conversion to gallons will be calculated using the below conversion factors:

(1) For Aviator’s Breathing Oxygen.

To convert from -- Divide by --

Standard cubic feet* 115.1

Normal cubic meters* 3.025 Liters (as liquid) 3.785 Pounds 9.527 Kilograms 4.321

(2) For Liquid Nitrogen.

To convert from -- Divide by --

Standard cubic feet* 93.11 Normal cubic meters* 2.447 Liters (as liquid) 3.785 Pounds 6.746 Kilograms 3.060

*Standard cubic foot gas measured at 1 atmosphere and 70 oF. Normal cubic meter gas measured at 1 atmosphere and 0Oc

F-0003 F3.04 TRANSPORTATION OF HAZARDOUS MATERIALS (AEROSPACE ENERGY) (DLA ENERGY APR 2006) The Contractor shall be responsible for ensuring the transportation of hazardous materials is in full compliance with all applicable rules and regulations below that are in force and effect on the date of the shipment for the individual hazard, ultimate destination, and mode of transportation:

(a) Title 49 of the Code of Federal Regulations (49 CFR) -- Transportation.

(b) DLAI 4145.3, Preparing Hazardous Materials for Military Air Shipments.

(c) International Air Transport Association (IATA) -- Dangerous Goods Regulations.

(d) International Civil Aviation Organization (ICAO) -- Technical Instructions for the Safe Transportation of Dangerous Goods by Air.

(e) International Maritime Organization (IMO) -- International Maritime Dangerous Goods (IMDG) Code (for overseas shipments by vessel).

F-0004 F3.10 TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION RATES (F.O.B.

DESTINATION) (AEROSPACE ENERGY) (DLA ENERGY DEC 2007)

(a) The Contractor shall be paid for detention beyond free time for delays caused by the Government. Free time will commence at the time the Contractor’s transport truck or truck and trailer arrives at the delivery destination (receiving tank identified in the contract) and will end when the carrier is released. For items involving multiple drops, time between drops will not be included in the free time. The attached Form H-14, Transport Equipment Delay Certificate, shall be completed to show the date and time the carrier arrived and departed and the reason(s) for the delays. This form must be signed by both the driver and unloading personnel. A signed copy of this form must be sent to--

ATTN: DLA ENERGY-MIC (INVOICE MONITOR)

1014 BILLY MITCHELL BLVD

SAN ANTONIO, TX 78226

(b) A minimum of two hours time is required by the Government. If Contractor free time is beyond two hours, indicate here: __________.

(c) The rate for detention shall be comparable to regulated tariffs governing the local area of the receiving activity. The rate for detention shall be stated by quarter hour.

(d) The above will not be considered in the evaluation of offers for award, except that free time of less than two hours or detention rates not comparable to regulated tariffs may render an offer unacceptable/bid nonresponsive.

(e) Detention Costs: Invoices for detention costs will be forwarded directly to the address stated above.

F-0005 F21 CONTRACTOR NOTICE REGARDING LATE DELIVERY (DLA ENERGY May 2009) In the event the Contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery Schedule or date, it shall immediately notify the Contracting Officer, in writing, giving pertinent details. This data shall not be construed as a waiver by the Government of any delivery Schedule or date or of any rights or remedies provided by law or under this contract.

SECTION G – CONTRACT ADMINISTRATION DATA

G-0001 G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE WIRE TRANSFER SYSTEM

(DLA ENERGY JAN 2012)

(a) The Contractor shall supply the following information to the Contracting Officer no later than 5 days after contract award and before submission of the first request for payment. The bank designated as the receiving bank must be capable of receiving Federal wire transactions via either a SWIFT Code or an IBAN.

(b) Any change by the Contractor in the designation of the bank account to receive electronic transfer of funds in accordance with this contract textmust be received by the Contracting Officer no later than 30 days prior to the date the change is to become effective.

(c) The electronic transfer of funds does not constitute an assignment of such funds in any form or fashion.

COMPLETE THE FOLLOWING INFORMATION (TYPE WRITTEN OR CLEAR PRINTING)

RECIPIENT’S NAME: | | | | | | | | | | | | | | | | | | | | | | | | | |

(DO NOT EXCEED 25 CHARACTERS)

ORIGINATOR ABA: ____044036205____ (DLA ENERGY fill-in)

CONTRACT NUMBER: ______________________________________________ (DLA ENERGY fill-in)

RECIPIENT’S CAGE CODE: __________________

[ ] CHECKING TYPE 22

[ ] SAVINGS TYPE 32

RECIPIENT’S DUNS NUMBER: ______________________________________

BENEFICIARY’S BANK NAME: | | | | | | | | | | | | | | | | | | | | | | | | | | | | |

(DO NOT EXCEED 29 CHARACTERS)

BENEFICIARY’S BANK ADDRESS: | | | | | | | | | | | | | | | | | | | | | | | | | |

(DO NOT EXCEED 25 CHARACTERS)

(DO NOT EXCEED 25 CHARACTERS)

BENEFICIARY’S BANK ACCOUNT NUMBER: ______________________________________

BENEFICIARY’S BANK SWIFT NUMBER: | | | | | | | | | | | |

(EITHER 8 OR 11 CHARACTERS ONLY)

IBAN NUMBER: ______________________________________

BENEFICIARY’S BANK SORT CODE: | | | | | | | (FOR BANKS IN THE UNITED KINGDOM ONLY)

(6 CHARACTERS ONLY)

(d) CONTRACTOR’S DESIGNATED OFFICIAL SUBMITTING ELECTRONIC FUNDS TRANSFER

INFORMATION.

NAME | | | | | | | | | | | | | | | | | | | | | | | | | |

(DO NOT EXCEED 25 CHARACTERS)

TITLE | | | | | | | | | | | | | | | | | | | | | | | | | |

(DO NOT EXCEED 25 CHARACTERS)

TELEPHONE NUMBER | | | | | | | | | | | | | | | | | | | | | | | | | |

(DO NOT EXCEED 25 CHARACTERS)

SIGNATURE _______________________________________________________

(e) Notwithstanding any other provision of the contract, the requirements of this contract text shall control.

PART II – CONTRACT CLAUSES

SECTION I – CONTRACT CLASUES

I-0001 I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA ENERGY

FEB 1996)

(a) In the event this contract is terminated for cause, in whole or in part, the Government will incur administrative costs.

(b) The Contractor agrees to pay all administrative costs associated with a contract termination action. The minimum amount the Contractor shall pay for each termination action is $500. This payment for administrative costs is in addition to any excess re-procurement costs and any other remedies or damages resulting from the termination.

(c) The term termination action, as used herein, means the termination for cause, including any associated re-procurement effort, involving--

(1) Any single order or any group of orders terminated together;

(2) Any item or group of items terminated together; or

(3) The entire contract.

I-0002 I28.01 FEDERAL, STATE, AND LOCAL TAXES (DLA ENERGY NOV 2011) (DEVIATION)

(a) As used in this contract text--

(1) After-imposed tax means any new or increased Federal, State, or local tax that the Contractor is required to pay or bear the burden of as the result of legislative, judicial, or administrative action taking effect after the contract date.

(2) After-relieved tax means any amount of Federal, State, or local tax that would otherwise have been payable on the transactions or property covered by this contract, but which the Contractor is not required to pay or bear the burden of, or for which the Contractor obtains a refund or drawback, as the result of legislative, judicial, or administrative action taking effect after the contract date.

(3) All applicable Federal and State taxes means all excise taxes that the taxing authority is imposing and collecting on the transactions or property covered by this contract pursuant to written ruling or regulation in effect on the contract date.

(4) Contract date means the date set for bid opening or, if this is a negotiated contract or a modification, the date set for final revised prices.

(5) Local taxes means taxes levied by the political subdivisions of the States, District of Columbia, or outlying areas of the United States, e.g., cities and counties.

(6) Outlying areas means—

(i) Commonwealths. Puerto Rico and the Northern Mariana Islands;

(ii) Territories. American Samoa, Guam, and the U.S. Virgin Islands; and

(iii) Minor outlying islands. Baker Island; Howland Island, Jarvis Island; Johnston Atoll; Kingman Reef; Midway Islands; Navassa Island; Palmyra Atoll; and Wake Atoll.

(7) State taxes means taxes levied by the States, the District of Columbia, or outlying areas of the United States.

(8) Tax means taxes, duties and environmental or inspection fees, except social security or other employment taxes.

(b) The contract price includes all applicable Federal, State, and local taxes, except as otherwise provided. (See either the FEDERAL AND STATE TAXES/FEES or FEDERAL, STATE, AND LOCAL TAXES AND FEES contract text.)

(c) The contract price shall be increased by the amount of any after-imposed tax if the Contractor states in writing that the contract price does not include any contingency for such tax.

(d) The contract price shall be decreased by the amount of any after-relieved tax.

(e) The contract price shall also be decreased by the amount of any tax that the Contractor is required to pay or bear the burden of, or does not obtain a refund of, through the Contractor's fault, negligence, or failure to follow instructions of the Contracting Officer.

(f) The Contractor shall promptly notify the Contracting Officer of all matters relating to any tax that reasonably may be expected to result in either an increase or decrease in the contract price and shall take appropriate action as the Contracting Officer directs.

(g) The Government shall, without liability, furnish evidence appropriate to establish exemption from any Federal, State, or local tax when the Contractor requests such evidence and a reasonable basis exists to sustain the exemption.

I-0003 I190.06 MATERIAL SAFETY DATA SHEETS -- COMMERCIAL ITEMS (DLA ENERGY APR2006)

(a) The Contractor agrees to submit to the Contracting Officer, upon request, a Material Safety Data Sheet (MSDS) that meets the requirements of 29 CFR 1910.1200(g) and the latest revision of Federal Standard No. 313 for all requested contract items. MSDSs must cite the contract number, the applicable CAGE code of the manufacturer, and, where so identified, the National Stock Number (NSN).

(b) The data on the MSDSs must be current and complete, reflecting the final composition of the product supplied.

Should the description/composition of the product change in any manner from a previously submitted MSDS, the Contractor shall promptly provide a new MSDS to the Contracting Officer.

I-0004 I209.09 EXTENSION PROVISIONS (DLA ENERGY JAN 2012)

(a) The Government shall have the right to extend this contract on the same terms and conditions one or more times for a total of no more than six months. Notice of contract extension will be furnished to the Contractor not later than 30 days prior to expiration of the contract ordering period or any extension thereof. Nothing in this contract provision precludes the Contractor from agreeing to an extension of the contract if the DLA Energy Contracting Officer fails to issue the notice prior to 30 days before the end of the ordering period.

(b) Extension of this contract shall be considered to have been accomplished at the time the DLA Energy Contracting Officer provides written notification to the Contractor.

PART III—LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J – LIST OF ATTACHMENTS

J-0001 Solicitation SPE601-19-R-0309 and the resultant contract contains the following attachments:

• DLA Energy Aerospace Provisions and Clauses

• DLA Energy Quality Assurance Provisions

• Contractor Performance Data Sheet

• Form H-14 transport equipment delay certificate

PART IV—REPRESENTATIONS AND INSTRUCTIONS

SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

K-0001 K1.01-7 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS

(CONT’D) (DLA ENERGY FEB 2009)

SMALL BUSINESS CONCERN REPRESENTATION - OFFEROR’S MANUFACTURING SOURCE.

(a) The representation in (c) below concerning the offeror’s manufacturing source applies to Small Business

Set-Aside (SBSA) line items, Small Disadvantaged Business Price Evaluation Adjustment (SDB PEA) line items, and HUBZone Small Business (HSB) line items only.

(1) To be eligible for either the SBSA or SDB PEA, the representation in (c)(1) below must state that all end items will be manufactured or produced by a small business concern in the United States, its territories and possessions, Puerto Rico, or the Trust Territory of the Pacific Islands.

(2) To be eligible for the HSB preference, the representation in (c)(2) below must state that all end items will be manufactured or produced by a HUBZone small business concern in the United States, its territories and possessions, Puerto Rico, or the Trust Territory of the Pacific Islands.

(b) Failure to complete (c) below and failure to submit same with the offer may render the offer ineligible for award in these programs.

(c) (1) SBSA/SDB PEA REPRESENTATION. The small business concern represents as part of its offer that-- [ ] all

[ ] not all end items to be furnished will be manufactured or produced by a small business concern in the United States, its territories or possessions, Puerto Rico, or the Trust Territory of the Pacific Islands.

(2) HSB REPRESENTATIONS. The small business concern represents as part of its offer that— [ ] all

[ ] not all end items to be furnished will be manufactured or produced by a HUBZone small business concern in the United States, its territories or possessions, Puerto Rico, or the Trust Territory of the Pacific Islands.

K-0002 K1.01-12 SMALL BUSINESS PROGRAM NOTICE (DLA ENERGY JAN 2012) NOTICE.

(a) If this solicitation is for supplies and has been set aside, in whole or in part, for small business concerns, then the contract program in this solicitation providing notice of the set-aside contains restrictions on the source of the end items to be furnished.

Under 15 U.S.C. 645(d), any person who misrepresents a firm's status as a small or small disadvantaged business concern in order to obtain a contract to be awarded under the preference programs established pursuant to sections 8(a), 8(d), 9, or 15 of the Small Business Act or any other provision of Federal law that specifically references section 8(d) for a definition of program eligibility, shall--

(1) Be punished by imposition of a fine, imprisonment, or both;

(2) Be subject to administrative remedies, including suspension and debarment; and

(3) Be ineligible for participation in programs conducted under the authority of the Act.

K-0003 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)