Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| solicitation.pdf | ||
| SOO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers from the Industry
Question 1: Are the cathodic protection (CP) systems for the Nitrogen pipeline (the pipeline) one single system or are there multiple systems for the pipeline?
Answer: There are four separate pipeline sections, each isolated from the other:
gN2 plant to SLC-6, gN2 plant to Kelp / Surf riser, Kelp / Surf riser to SLC-4, Kelp / Surf riser to SLC-3.
Question 2: How many test stations are there installed on the system?
Answer: gN2 plant to SLC-6 - 6 test stations, gN2 plant to Kelp / Surf riser - 14 test stations, Kelp / Surf rise to SLC-4 - 7 test stations, Kelp / Surf riser to SLC-3 - 19 test stations.
Question 3: How old is the system?
Answer: There are three groups of CP Anodes with varying ages. The oldest is the SLC-6 leg which is 26 years old, next is the gN2 plant to Kelp / Surf riser and SLC-4 at 23 years and the SLC-3 leg is the youngest at 16 years.
Question 4: What are the dimensions of the pipeline, length and diameter?
Answer: The pipline is 39,921 feet, approximately 75% is 4.5" O.D. and 25% 3.0" O.D.
Question 5: Do you have any as-built or other drawings of the cathodic protection system?
Answer: We have everything related to the pipeline.