SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

0066306196 186

SPE600-17-R-0511

Micherie M. Dougherty (703) 767-3681

SPE600

See Schedule RFP/OSP Section B: Supplies/Services and Prices/Cost

See Block 9

Defense Finance & Accounting Service - Columbus Center Fuels Payment Division, Services Commodity/JAQBAD P.O Box 182317 Columbus, OH 43218-2317 Fax: (614)693-2360

See Schedule DLA Energy Contract Provision B-0001-

B34.01 SERVICES TO BE FURNISHED AND PRICES

26,000 BBLS JP5 Storage Pacific Ocean (Western entrance) side of the Panama Canal, Republic of Panama Period of Performance: 1 November 2017 - 31 October

GORDON BRAXTON

493190

$27,500,000.00

04/24/2017

06/08/2017 09:00 A.M.

DLA Energy - FESBB 8725 John J. Kingman Road, Suite 2945 Fort Belvoir, VA 22060-6222 Buyer/Office: Micherie M. Dougherty/micherie.

dougherty@dla.mil

SL4701

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

SOLICITATION SPE600-17-R-0511

PANAMA STORAGE

ADDITIONAL INSTRUCTIONS FOR ALL PROSPECTIVE OFFERORS

NOTE: See Addendum to FAR 52.212-1 – INSTRUCTIONS TO OFFERORS - COMMERCIAL ITEMS (JAN 2017) and FAR 52.212-2 – EVALUATION-COMMERCIAL ITEMS (OCT 2014) for complete instructions on how to submit a proposal.

A. Attached is the Request for Proposal Number SPE600-17-R-0511 for storage and handling facilities capable of receiving, storing, protecting, maintaining, and issuing a minimum of 26,000 barrels of U.S. Government owned product Turbine Fuel Aviation, Grade JP-5 in the Panama Canal, Panama.

B. Your proposal must be received no later than 09:00 AM local Fort Belvoir, VA (EST) time on June 8, 2017. Offerors shall clearly mark all envelopes/packages sent in response to this solicitation with the words: "OFFERED UNDER SOLICITATION SPE600-17-R-0511”

C. FAXED PROPOSALS ARE NOT AUTHORIZED. You may, however, email your proposal to: bidcustodian@dla.mil. All emailed proposals MUST be followed-up with a hard copy of your proposal NO LATER THAN TEN (10) business days after solicitation closing.

Late proposals will be processed in accordance with FAR 15.208, Submission, Modification, Revision and Withdrawal of Proposal.

Submit a hard copy of your TECHNICAL PROPOSAL, OFFEROR SUBMISSION PACKAGE to:

US Post Office/US Post Office Express Mail offer only: Hand Carried/Courier Delivery Service only:

ATTN: DLA Energy-FESBB Bid Custodian Room 2945 ATTN: DLA Energy-FESBB Bid Custodian Room Defense Logistics Agency Energy Mrs. Micherie Dougherty/ Telephone 703-767-3681 8725 John J. Kingman Road, Suite 2945 Defense Logistics Agency Energy Fort Belvoir, VA 22060-6222 8725 John J. Kingman Road, Suite 4950 Fort Belvoir, VA 22060-6222

FOR VERIFICATION OF RECEIPT: Contact Mrs. Micherie Dougherty at (703)-767-3681.

D. NOTICE REGARDING SUSPENSION/DEBARMENT/INELIGIBILITY: Any contract awarded to a Contractor who, at the time of award was suspended, debarred, or ineligible for receipt of contract with Government Agencies or in receipt of a notice of proposed debarment from any Government Agency, is voidable at the option of the Government.

E. TAX EXEMPT NUMBER: For the Defense Logistics Agency-Energy is: 31-4420477.

F. QUESTIONS RELATING TO THIS SOLICITATION: Must be emailed to Micherie Dougherty, Contract Specialist at micherie.dougherty@dla.mil no later than Thursday, May 25, 2017. Please reference the Solicitation Number in the SUBJECT LINE of your email. All responses will be provided via an amendment to the solicitation.

mailto:bidcustodian@dla.mil mailto:micherie.dougherty@dla.mil

Contents

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

SECTION C - SPECIFICATIONS/SOW/SOO/PWS

C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)

C-0002-ENERGY C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)

C-0003-ENERGY QAP C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA

ENERGY JAN 2012)

SECTION E – INSPECTION AND ACCEPTANCE

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

E-0001-ENERGY QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF

SERVICES (DLA ENERGY JAN 2012)

E-0002-ENERGY QAP E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)

E-0003-ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA

ENERGY) (FEB 2017)

E-0004-ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY)

(APR 2016) 11

E-0007-ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DEC 2011)

E-0006-ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)

E-0007-ENERGY QAP E36 INSPECTION (STORAGE)(DLA ENERGY) (FEB 1970)

SECTION F – DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989)

F-0001-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

F-0002-F1.11 DLA INTERNET BID BOARDS SYSTEM (DIBBS)(DLA ENERGY APR 2014)

F-0003-F1.14 DETERMINATION OF QUANTITY (STORAGE)

F-0004-F51 SHIPMENT AND ROUTING (OVERSEAS) (DLA ENERGY NOV 2005)

F-0005-F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE)

SECTION G – CONTRACT ADMINISTRATION DATA

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (JULY 2013)

252.201-7000 CONTRACTING OFFICER’S REPRESENTATIVE (DEC 1991)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

G-0001-G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)

G-0002-G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED

G-0003-G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE WIRE TRANSFER 28

G-0004-G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)

G-0005-G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H-0001-H11 GUARD SERVICE (DLA ENERGY MAR 1982)

H-0002-H19.01 REPORTING AND CONTAINING OIL SPILLS (OVERSEAS STORAGE)

SECTION I – CONTRACT CLAUSES

52.202-1 DEFINITIONS (NOV 2013)

52.203-3 GRATUITIES (APR 1984)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006) ALT I (OCT 1995)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010) 32

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR

STATEMENTS (JAN 2017)

52.204-4 PRINTED OR COPIED DOUBLE-SIDE ON RECYCLED PAPER (MAY 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2016)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUNE 2016) . 45

52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS

(JULY 2013)

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (JAN 2017)

ADDENDUM TO 52.212-4 ADDEMDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS –

COMMERCIAL ITEMS

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE

ORDERS – COMMERCIAL ITEMS (JAN 2017)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2011)

52.225-13 RESTRICTIONS ON CERTAIN FOREING PURCHASES (JUN 2008)

52.229-6 TAXES-FOREIGN FIZED-PRICE CONTRACTS (FEB 2013)

52.232-39 UNENFORECEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

52.233-1 DISPUTES (MAY 2014)

52.333-3 PROTEST AFTER AWARD (AUG 1996)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2014)

52.242-13 BANKRUPTCY (JUL 1995)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING

(OCT 2016)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT

(MAY 2016)

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991)

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (OCT 2015)

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2016)

252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS OUTSIDE

THE UNITED STATES (JUN 2015)

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004)

252.232-7008 ASSIGNMENT OF CLAIMS (OVERSEAS) (JUNE 1997)

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

252.233-7001 CHOICE OF LAW (OVERSEAS) (JUN 1997)

252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR PERSONNEL (JUN 2013)

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS (DOD

CONTRACTS) (JUN 2013)

52.233-9001 DISPUTES-AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (DLAD) (DEC 2016)

I-0001-I1.01-4 DEFINITIONS (CONT’D)(STORAGE) (DLA ENERGY JUNE 2009)

I-0002-I1.20-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (DLA ENERGY JAN 2012) . 108

I-0003-I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA

ENERGY FEB 1996)

I-0004-I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY JAN 2012)

I-0005-I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY JAN 2012) 111

I-0006-I147 DEMURAGE (DLA ENERGY NOV 1989)

I-0007-I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (SEP 2009)

SECTION J – LIST OF ATTACHMENTS

ATTACHMENT 1 – PERFORMANCE WORK STATEMENT

ATTACHMENT 2 – OFFEROR’S SUBMISSION PACKAGE (OSP)

ATTACHMENT 3 – PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT 4 – QAPS C AND E

ATTACHMENT 5 – PAST PERFORMANCE INFORMATION DISCLOSURE CONSENT FORM

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS

52.203-18 PREVENTING PERSONAL CONFLICTS OF INTEREST (DEC 2011)

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JULY 2016)

52.204-20 PREDECESSOR OF OFFEROR (JULY 2016)

52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS (JAN 2017)

ALTERNATE I (OCT 2014)

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (NOV 2011)

252.222-7007 REPRESENTATION REGARDING COMBATING TRAFFICKING IN PERSONS (JAN 2015)

K-0001-K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)

K-0002-K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)

K-0003-K86 FOREIGN TAXES (DLA ENERGY NOV 2014)

K-0004-K150 WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE SUBMISSION (DLA ENERGY

MAY 2014)

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)

52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (JAN 2017)

ADDENDUM TO 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS

52.233-2 SERVICE OF PROTEST (SEP 2006)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)

252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT 2016)

252.204-7011 ALTERNATIVE LINE ITEM STRUCTURE (SEP 2011)

252.215-7008 ONLY ONE OFFER (OCT 2013)

L-0001-L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991)

L-0002-L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)

L-0003-L116.01 DATA REQUIREMENTS (STORAGE) (DLA ENERGY JAN 2013)

SECTION M – EVALUATION FACTORS FOR AWARD

52.212-2 EVALUATION – COMMERCIAL ITEMS (OCT 2014)

ADDENDUM TO 52.212-2 TO FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS

M-0001-M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997)

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

The services to be furnished during the period specified herein and the unit prices are as follows:

CONTRACT LINE ITEM 0001 – OCONUS COCO STORAGE SERVICES, V20000034:

(FIRM FIXED PRICE)

The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement, Section C, and all other terms and conditions set forth herein, for the FOUR (4) year period of November 1, 2017 through October 31, 2021.

AREA(S) OF CONSIDERATION: Pacific Ocean (Western entrance) side of the Panama Canal, Republic of Panama.

The prices for the services and facilities to be provided during the FOUR-YEAR performance period (November 1, 2017 through October 31, 2021), as described in the Performance Work Statement, includes the following:

CLIN Tank # Shell Capacity

(BBLS)

Fill Capacity

(BBLS)

OCONUS COCO

STORAGE

SERVICES

(Prorated for part month) includes initial & final shipment PRICE

(MUCC)

Annual Storage Use Charge

Four Year Cost

0001 $ $ $ Dedicated

Line Fill

JP-5

CONTRACT

TOTAL $ $ $

NOTE: A minimum fill capacity quantity of 26,000 barrels is required. Monthly and Annual Storage Charges shall be based on this quantity. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of above identified tanks at no increase to the offered storage charges.

NOTE: In accordance with (IAW) FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999), the contractor is accepting that prices for the extension(s) not to exceed six months (if required) will remain the same as the offered prices under DLA Energy Contract Provision B-

0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991).

IAW Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY JUN 2015), tanks required to be cleaned/inspected at the contractors expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to CLIN 0001 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

Tank Monthly OCONUS

COCO Storage Service Price

Annual Storage Use Charge

Daily Reduction/Addition

Per Tank When Removed

From/Returned To Revenue IAW E18

CONTRACT

TOTAL $ $ $

NOTE: For each full calendar month a tank is out of service and removed from revenue, CLIN 0001 shall reflect a reduction to $0.00 for the subject tank. Alternate tankage was not offered under E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under CLIN 0001 by utilizing the following formula:

Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days

SECTION C - SPECIFICATIONS/SOW/SOO/PWS

The Performance Work Statement (PWS) is incorporated by reference as if fully set forth herein. Refer to Attachment 1.

C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)

See attachment 4

C-0002-ENERGY C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)

C-0003-ENERGY QAP C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS

(STORAGE) (DLA ENERGY JAN 2012)

SECTION E – INSPECTION AND ACCEPTANCE

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.

(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.

(End of clause)

E-0001-ENERGY QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT

INSPECTION OF SERVICES (DLA ENERGY JAN 2012)

E-0002-ENERGY QAP E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)

E-0003-ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM

STORAGE TANKS (DLA ENERGY) (FEB 2017)

E-0004-ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY

CONTRACTS (DLA ENERGY) (APR 2016)

http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm#252.232-7003

E-0007-ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES

(STORAGE) (DEC 2011)

See attachment 4

E-0006-ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA

ENERGY DEC 2011)

See attachment 4

E-0007-ENERGY QAP E36 INSPECTION (STORAGE)(DLA ENERGY) (FEB 1970)

SECTION F – DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause.

Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for

Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if –

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(End of Clause)

F-0001-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:

"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks, and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE

AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION

OFFICE) in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND

TITLE OF CONTRACTOR'S DESIGNATED REPRESENTATIVE)."

(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.

(c) Conveyances required for shipments shall be furnished or designated by the Government.

The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES.

Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire

(Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.

(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels and jet lubricating oil and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish and periodically inspect and clean such strainers and repair same, if necessary, keeping a written record thereof.

(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. Such seals will be furnished by the Contractor. Seal numbers will be indicated on shipping documents.

(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.

(g) FOR TANK CARS ONLY.

(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.

(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.

(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.

(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.

(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information.

The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.

(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.

(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.

(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.

(m) Custody of product delivered to tanker or barge, and risk f loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.

(n) The Contractor shall be held accountable for demurrage charges arising from delay(s) in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.

(o) The following subparagraphs only apply to barges and tankers.

(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.

(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival. Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours notice for barges and 72 hours notice for tankers will require verbal approval of the Contractor, confirmed in writing.

(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --

(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.

(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available. If the vessel is not moored in its proper turn with other vessels, laytime will commence at 6:00 A.M. on the date the Government vessel’s turn occurred.

(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.

(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until loading of the barge or tanker is completed and hoses have been removed.

(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:

(A) FOR BARGES: One hour for each 2,000 barrels of product to be loaded.

(B) FOR TANKERS: Thirty-six hours for load of full vessel cargo. When partial vessel cargoes are to be loaded, the 36 hours will be prorated based on quantities loaded by each supplier. The 36 hours includes allowances for routine events that occur in the loading process, such as cushioning and topping off of vessel tanks.

(vi) Hoses and loading arms for loading shall be furnished, connected, and disconnected by the Contractor.

(2) INCREASES TO BASIC ALLOWED LAYTIME.

(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be loaded do not permit loading, basic allowed laytime shall be increased by the duration of the delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.

(iii) After laytime commences, when vessels are required to dock at anchorage due to vessel delays such as vessel inspection and inerting, laytime credit will be allowed for transit time from anchors away at anchorage until first line ashore berthing, not to exceed 2 hours.

(iv) If regulations of the owner or operator of the vessel prohibit loading at any time after laytime has commenced, time so lost shall be added to basic allowed laytime.

(v) If, for any reason, the Contractor is delayed in loading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.

(vi) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.

(vii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.

(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for loading provided for by paragraph (1) above, or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:

(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.

(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.

F-0002-F1.11 DLA INTERNET BID BOARDS SYSTEM (DIBBS)(DLA ENERGY APR 2014)

(a) Contractor Registration. Contractors must register in DIBBS to obtain a login account at https://www.dibbs.bsm.dla.mil. The login account will allow a contractor to register a primary and alternate email address for notifications. Contractors are strongly encouraged to establish a group email address for the primary email address for the contractor’s authorized point of contacts. The registered email addresses will be the only email used by the government to make notifications.

(b) All contractors must have an active System for Award Management (SAM) account, http://www.sam.gov in order to register for DIBBS.

(c) The Contractor shall use DIBBS to receive orders. DLA Energy will not be using DIBBS receipt of quotes capability. All quotations, proposals, bids shall be submitted in accordance with the terms and conditions of the solicitation.

(d) Preparation and Transmission of Orders

(1) The Government may issue an order for a specific delivery or a series of deliveries (e.g., several deliveries during a week). The Government may also elect to issue an order covering a https://www.dibbs.bsm.dla.mil/ http://www.sam.gov/ longer period (including monthly orders) and make periodic calls against these orders designating specific delivery dates, times, and quantities.

(2) Only a DLA Energy warranted Contracting Officer can issue an order, either orally or in writing, against a contract. An oral order issued by the warranted Contracting Officer shall provide the required advance notice to the Contractor and the following information: Interim order number; contract number; item number; ceiling price; quantity; delivery location; and the required delivery and/ or service date.

(i) For all product orders, the Contractor will receive an electronically signed written order via DIBBS, within 24 hours or one business day after the warranted Contracting Officer issues an oral order.

(ii) For all service orders, the Contractor will receive an electronically signed written order via DIBBS, within five business days after issuing the oral order.

(iii) Interim order number is subject to change once the electronically signed written order is received by the contractor. The order number on the written order will take precedence over the interim order number, if different.

(iv) Regardless of the unit price cited on the written order, the office designated to make payments on the written order will pay the applicable unit price in effect under the terms and conditions of the contract.

(v) Once the order has been issued, an email will be sent to the Contractor to provide notice that the order is available on the contract-specific web page. The order will also be submitted to the payment office.

(3) Calls against previously issued orders must be confirmed in writing within 24 hours or one business day via email message. The email confirmation will reference the previously issued order number and item number and designate specific delivery location, dates, and quantity to be delivered against that order.

(4) The Contractor’s nonreceipt of a written or electronic confirmation of an oral order or oral call against a written or electronic order does not relieve the Contractor from its obligation to perform in accordance with the oral order or oral call against a written or electronic order. The Contractor should contact the DLA Energy Contracting Officer if problems are experienced with receipt of the electronic or written confirmation.

F-0003-F1.14 DETERMINATION OF QUANTITY (STORAGE)

The total gallonage received into or shipped from the Contractor's facilities shall be determined as follows:

(a) RECEIPTS OR SHIPMENTS OF CRUDE AND FUELS OTHER THAN RESIDUAL

FUELS (by transport truck of 3500 gallons or less) (truck and trailer combination when delivering same product will be considered as one container or conveyance). On an actual gallonage basis, without temperature correction.

(b) RECEIPTS OR SHIPMENTS OF RESIDUAL FUELS (in excess of 3500 gallons of crude or other fuels by tank car or transport truck). On a gallonage basis corrected to 60oF.

(c) RECEIPTS OR SHIPMENTS BY TANKER OR BARGE OR PIPELINE. On a gallonage basis corrected to 60oF. Quantities shipped or received will be determined on the basis of shore tanks or tender gauges taken by the Contractor and authenticated by the Quality Representative (QR). The ship or carrier's representative may participate in these determinations. During the gauging of shore tanks, the tanker, barge, or carrier's representative may participate in the quantity determinations, and, in the case of tanker/barge shipments or receipts, the Contractor may participate in the operations on board the tanker or barge which are required to determine the quantity of product in the tanker or barge cargo tanks.

(d) In the case of receipts, the Contractor shall sign the bill of lading and other related documents for the actual quantity received as determined above. When requested by the QR, the Contractor shall investigate losses or gains in connection with receipts or shipments to determine if the cause is at the Contractor’s facility.

(e) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the United States, other technically equivalent national or international standards may be used. In addition, the following specific standards will be the referee method.

(1) API MPMS Chapter 11.1, Volume Correction Factors (API 2540/ASTM D 1250/IP 200/ISO 91-1). Either the printed version or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine will be the referee method.

(i) For crude oils, JP4 and Jet B, use Volume I, Tables 5A and 6A (or Volume VII Tables 53A and 54A).

(ii) For lubricating oils, use Volume XIII, Tables 5D and 6D (or Volume XIV, Tables

53D and 54D).

(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B (or Volume VIII, Tables 53B and 54B).

(iv) For chemicals/additives, use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.

(v) Volume XII, Table 52, shall be used to convert cubic meter at 15 degrees Centigrade to barrels at 60 degrees Fahrenheit. Convert liters at 15 degrees Centigrade to cubic meters at 15 degrees Centigrade by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.

(vi) If the original measurement is by weight and quantity is required in U.S. gallons, then--

(A) Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit. Convert kilograms to metric tons by dividing by 1,000.

(B) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.

(2) API MPMS Chapter 4, Providing Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulations (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent.

(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter.

(f) In addition to gauging of storage tanks to determine quantities issued or received, the Contractor will gauge each active storage tank daily and each inactive storage tank weekly and compute physical inventories of the purpose of detecting loss of products.

F-0004-F51 SHIPMENT AND ROUTING (OVERSEAS) (DLA ENERGY NOV 2005)

(a) The Contractor shall make shipments of the supplies ordered hereunder by the method specified in the Schedule, to the delivery point, in the quantity, and according to the delivery date specified in the order or in the Schedule.

(b) On items calling for delivery at Contractor's refinery, terminal, or bulk plant on an f.o.b.

origin basis, transportation equipment will be furnished by the Government; PROVIDED, however, that the Contractor shall, without additional cost to the Government, arrange to obtain any railway boxcars required for shipments to be made hereunder. Whenever any item of the Schedule specifies delivery by more than one method, selection of the method to be used shall be at Government's option. Government-furnished transportation equipment that the Contractor finds unsatisfactory for loading shall be reported as follows:

(1) TANKERS AND BARGES. Report to the Quality Representative (QR).

(2) TANK CARS. Report to the QR.

(3) TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND TANK

WAGONS. Report to the QR and to carrier's general office, or to home base or station of such equipment.

(c) If the supplies are to be delivered f.o.b. tank car, boxcar, truck, transport truck, truck and trailer, or tank wagon at Contractor's refinery, terminal, or bulk plant--

(1) The Contractor shall ship the supplies under Government bills of lading, which will be furnished, or arranged for, by the Ordering Officer. If requested by the Government, the Contractor shall prepare Government bills of lading.

(2) The Contractor shall comply with routing instructions furnished by the Government. Such instructions will include carrier names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailers, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.

(d) On all tank car and boxcar (carload only) shipments, whether delivery is made on an f.o.b.

origin or f.o.b. destination basis, the Contractor shall send to the consignee at the time of shipment a facsimile or electronic mail notice which shall indicate grade of product, date of shipment, car and seal numbers, bill of lading number, and net quantities.

(e) The Contractor shall furnish serially numbered seals and effectively seal all tank cars, boxcars, transport trucks, trucks and trailers, tankers, and barges, whether delivery is made on an f.o.b. origin or f.o.b. destination basis. The marking on the seal shall be indicated on all shipping documents.

F-0005-F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE)

During the contract period, 01 NOVEMBER 2017 through 31 OCTOBER 2121, the Contractor shall provide petroleum storage facilities and services at the following location:

(Street address)

(City/State/Zip)

SECTION G – CONTRACT ADMINISTRATION DATA

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD

MANAGEMENT (JULY 2013)

(a) Method of payment.

(1) All payments by the Government under this contract, shall be made by electronic funds transfer (EFT), except as provided in paragraph (a)(2) of this clause. As used in this clause, the term “EFT” refers to the funds transfer and may also include the payment information transfer.

(2) In the event the Government is unable to release one or more payments by EFT, the Contractor agrees to either--

(i) Accept payment by check or some other mutually agreeable method of payment; or

(ii) Request the Government to extend the payment due date until such time as the Government can make payment by EFT (but see paragraph (d) of this clause).

(b) Contractor's EFT information. The Government shall make payment to the Contractor using the EFT information contained in the System for Award Management (SAM) database. In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to the SAM database.

(c) Mechanisms for EFT payment. The Government may make payment by EFT through either the Automated Clearing House (ACH) network, subject to the rules of the National Automated Clearing House Association, or the Fedwire Transfer System. The rules governing Federal payments through the ACH are contained in 31 CFR part 210.

(d) Suspension of payment. If the Contractor's EFT information in the SAM database is incorrect, then the Government need not make payment to the Contractor under this contract until correct EFT information is entered into the SAM database; and any invoice or contract financing request shall be deemed not to be a proper invoice for the purpose of prompt payment under this contract. The prompt payment terms of the contract regarding notice of an improper invoice and delays in accrual of interest penalties apply.

(e) Liability for uncompleted or erroneous transfers.

(1) If an uncompleted or erroneous transfer occurs because the Government used the Contractor's EFT information incorrectly, the Government remains responsible for--

(i) Making a correct payment;

(ii) Paying any prompt payment penalty due; and

(iii) Recovering any erroneously directed funds.

(2) If an uncompleted or erroneous transfer occurs because the Contractor's EFT information was incorrect, or was revised within 30 days of Government release of the EFT payment transaction instruction to the Federal Reserve System, and--

(i) If the funds are no longer under the control of the payment office, the Government is deemed to have made payment and the Contractor is responsible for recovery of any erroneously directed funds; or

(ii) If the funds remain under the control of the payment office, the Government shall not make payment, and the provisions of paragraph (d) of this clause shall apply.

(f) EFT and prompt payment. A payment shall be deemed to have been made in a timely manner in accordance with the prompt payment terms of this contract if, in the EFT payment transaction instruction released to the Federal Reserve System, the date specified for settlement of the payment is on or before the prompt payment due date, provided the specified payment date is a valid date under the rules of the Federal Reserve System.

(g) EFT and assignment of claims. If the Contractor assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Contractor shall require as a condition of any such assignment, that the assignee shall register separately in the SAM database and shall be paid by EFT in accordance with the terms of this clause. Notwithstanding any other requirement of this contract, payment to an ultimate recipient other than the Contractor, or a financial institution properly recognized under an assignment of claims pursuant to Subpart 32.8, is not permitted. In all respects, the requirements of this clause shall apply to the assignee as if it were the Contractor.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .