Gila_Bend_Fuels_Pre_Walk_2016.pdf

PDF 3 MB Posted

Attached to
FUEL MANAGEMENT SERVICES Federal contract opportunity
Solicitation number
SPE60016R0501
Issued by
Defense Logistics Agency Aviation

About this file

ATTACHMENT VIII - GILABEND FUELS WALK SLIDES

View the file

Other files for this federal contract opportunity

Other files attached to FUEL MANAGEMENT SERVICES, newest first.
File Type Posted
SF30_AMENDMENT_008_TO_SPE600-16-R-0501.pdf PDF
CBA_CAFB_OTS-IUOE_624.pdf PDF
2014_Fuels_CBA_Chiulista.pdf PDF
02191601.PDF PDF
SF30_AMENDMENT_007_TO_SPE600-16-R-0501.pdf PDF
8A_SOLICITATION_-_AMEND01AUG16.pdf PDF
SF30_AMENDMENT_006_TO_SPE600-16-R-0501.pdf PDF
ATTACHMENT_I_OSP_Amendment_001.pdf PDF
8A_SOLICITATION_-_REVISED.pdf PDF
COLUMBUS_AFB_MS_MOU_ATTACHMENT_III.pdf PDF
GILA_BEND_MOU_LETTER_ATTACHMENT_II.pdf PDF
AF_Consolidated_PWS_current_as_of_18_Mar_16_ATTACHMENT_I.pdf PDF
CBA_ADDENDUM_FOR_COLUMBUS_AFB_ATTACHMENT_IV.PDF PDF
SF30_AMENDMENT_0005_TO_SPE600-16-R-0501.pdf PDF
SF30_AMENDMENT_004_TO_SPE600-16-R-0501.docx DOCX document
SF30_AMENDMENT_003_TO_SPE600-16-R-0501.pdf PDF
ATTACHMENT_VII_-_8A_SOLICITATION_-_FINAL.pdf PDF
Attachment_V_-_AF_Consolidated_PWS_current_as_of_1_Mar_16.pdf PDF
ATTACHMENT_VI_-_SIGN_IN_SHEET.pdf PDF
SF30_AMENDMENT_002_TO_SPE600-16-R-0501.docx DOCX document
SF30_AMENDMENT_TO_SPE600-16-R-0501.pdf PDF
ATTACHMENT_III_PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
8A_SOLICITATION_-_FINAL.docx DOCX document
ATTACHMENT_IV_JOINT_VENTURE_CONSENT_FORM.docx DOCX document
8A_SOLICITATION_-_FINAL.docx DOCX document
ATTACHMENT_I_OSP_Erick.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fly, Fight, & Win

Cave Tonitrum

Operation and Maintenance of the Barry M. Goldwater Range

(BMGR) and Gila Bend Air Force Auxiliary Field (GBAFAF)

Pre-Proposal Conference

17 Feb 2016

SPE600-16-R-0501

Welcome to Gila Bend AFAF

Overview

• Welcome to Gila Bend Air Force Auxiliary Field

• Introductions

• GBAFAF/BMGR facts

• Fuels Specifics

Source Selection Authority – Defense Logistics Agency Energy

Procuring Contracting Officer – Vicki Hahn

Director 56th Range Management Office – Charles “Chas” Buchanan

Administrative Contracting Officer – Roderick Estrada

Acting Chief Contracting Officer Representative – Timothy Sizemore

Introductions

• GBAFAF: government owned—contractor operated

• 2001 acre facility: A-76 contract since October 1994

• All equipment, vehicles, parts, materials provided by the contractor…unless in Section III of PWS

• Contractor responsible for facility sustainment and

O&M of airfield

– Government identified repairs outside scope of contract will make repairs as funds become available

GBAFAF

• One of the largest tracts of withdrawn land for military use split between the USAF and USMC

• BMGR—East (USAF) 1,052,121 Acres

• Range primary use: air-to-ground employment

• Subdivided into 3 tactical ~ 4 numbered ranges

• Maintain road and target infrastructure on ranges

– Approximately 645 miles of roads

– 90 target groups

BMGR—East

GBAFAF

Fuels Facilities

• Primary emergency divert; routinely supports FOB operations

• Primary users: fighter type aircraft

– On average 18,000 sortie count annually

• Currently two assigned R11 refuelers from Luke AFB

– periodically rotated every 90 days for truck utilization unless maintenance dictates otherwise

– Memorandum Of Understanding established with 56 LRS/POL

– Fill rate 300 gpm

• Diesel M49 supports 10 BMGR geographically separated range sites and 15 on base sites (Org tanks)

– has 1200 gallon tank capacity with fill rate of 45 GPM. Unit takes average 30 minutes to fill.

Gila Bend Fuels Specifics

• Accounting and inventory paperwork is processed daily by Luke POL FSC.

– All flightline fuels ops are completed and FAS logged into FMD.

• Jet A resupply is coordinated (ordered/delivered) within 24 hours by Davis Monthan AFB Contracting/POL FSC.

– Jet A tank truck receipts take 45 minutes to unload into storage tanks

– Ground products resupply is coordinated by Luke AFB POL FSC

– MOGAS/DS@ tank truck receipts take 1 hour 45 minutes to drop into storage tanks

• Contractors sample/test fuel from inventory contained in both storage tanks and mobile refuelers.

– All samples are tested at Luke AFB POL Lab.

– Memorandum of Agreement (MOA) is complete and validated annually with 56 LRS/POL

Gila Bend Fuels Specifics Cont.

Nominal Distance for reference:

Range Miles Support Type 1 Gate 36 Childs Mtn/H2O Well 2 Gate 22 Tower Generator 3 Gate 11 Generator/Moving Target 4 Gate 30 Flank Tower Generator

NTAC 45 UMTE

STAC 45 UMTE

ETAC 12 NATO Hill/UMTE

Vehicle Wash

Jet-A Fuel Storage

MOGAS/DS2

Operation and Maintenance of the Barry M. Goldwater Range �(BMGR) and Gila Bend Air Force Auxiliary Field (GBAFAF)��Pre-Proposal Conference�17 Feb 2016����
Slide Number 2
Slide Number 3
Source Selection Authority – Defense Logistics Agency Energy��Procuring Contracting Officer – Vicki Hahn��Director 56th Range Management Office – Charles “Chas” Buchanan��Administrative Contracting Officer – Roderick Estrada��Acting Chief Contracting Officer Representative – Timothy Sizemore�
GBAFAF
Slide Number 6
Slide Number 7
Slide Number 8
������������
������������
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14