AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60016R0221

X

2016 MAR 25

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

USA

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Solicitation SPE600-16-R-0221

COG 8

Amendment 0004

A. The purpose of this amendment is to delete all references to Solicitation Provision M3.01

“EVALUATION OF OFFERS WHERE UNCOMMON ESCALATORS ARE USED (DLA

Energy JAN 1998),” and answer questions received in response to the solicitation.

B. All references to Solicitation Provision M3.01 “EVALUATION OF OFFERS WHERE UNCOMMON ESCALATORS ARE USED (DLA ENERGY JAN 1998) are hereby deleted from the solicitation. This includes references made in Amendment 0002. DLA Energy will not consider offers using any uncommon escalators for any line items under the solicitation.

C. The following responses are provided to questions received in response to Solicitation

SPE600-16-R-0221:

a. Question: Are the estimated quantities over a 4-year period or are they based on annually? Are the estimated quantities correct? For example CLIN #129 is for 816 gallons of diesel. Is this amount over 4-years or per year? This doesn't seem to fit with the two tank sizes which are 10,000 gallons and 120,000 gallons.

Answer: The estimated quantities listed in Attachment A, “Line Item Narratives - Schedule B,” are for the entire 4-year period. These quantities are estimates, and, to DLA Energy’s knowledge, the estimated quantities are accurate.

b. Question: For the mode of delivery, some items request “Tank Truck” and some request “Tank wagon.” Is there an expected gallon capacity between those two different modes? I view them as similar types of trucks having approximately a 4,500 gallon capacity but I want to be sure that is accurate.

Answer: Typically tank wagons are mandated to come equipped with a pump and a meter and have a capacity of 4,500 gallons or less. Tank trucks typically are not mandated to come equipped with a pump and a meter and have a capacity of 4,500 gallons or more.

c. Question: In Washington state there are 2 taxes that are % based fees but the system only allows for a CPG [Cost Per Gallon] value to be put in when describing taxes. Given that these aren't flat CPG values but would fluctuate with the market how should we enter these values in for bidding purposes?

Answer: Offerors should not include any percentage based taxes in the offer prices that they enter into OET. Offerors should state in the “Notes” section in OET if any percentage based taxes apply to that particular line item. In the “Notes” section, vendors should state the name of the percentage based tax and the percentage amount that applies.

d. Question: So same basic question about the Oregon load fee. It's $8 per load, how would we translate that to a CPG?

Answer: Any tax/fee that an offeror determines applies to its offer price, but which is not included in the drop down list of taxes within OET, should be listed in the “Notes” section for that line item in OET. List the name of the tax/fee and the amount.

Solicitation SPE600-16-R-0221

COG 8

Amendment 0004

e. Question: Given more information is pending from ordering activities [regarding tank information] will the deadline to submit be extended to allow participants sufficient time for preparations?

Answer: Amendment 0003 extended the deadline to submit offers to May 6, 2016, 3:00PM Eastern time. DLA Energy will issue a separate amendment to provide tank information for line items that do not contain complete tank information.

f. Question: After Amendment 2, question 12, if we are going to submit a different escalator than Platts, how would we submit that in the OET?

Answer: This amendment deletes all references to Solicitation Provision M3.01

“EVALUATION OF OFFERS WHERE UNCOMMON ESCALATORS ARE USED (DLA

ENERGY JAN 1998), including those included in Amendment 0002. DLA Energy will not consider offers using any uncommon escalators for any line items under the solicitation.

g. Question: The Washington State Tax is currently .445 per gallon. On July 1, 2016 it will go up to .494 per gallon. Which rate would we use for the bid?

Answer: Vendors should use the rate effective on July 1, 2016.

h. Question: On the Offer Entry Tool there are three options for the Gasohol FET FET Gasohol Eff 10/1/05 Federal Excise Tax Gasohol Eff Jan 05 Federal Excise Tax Gasohol Which one should we use?

Answer: Please use the Federal Excise Tax Gasohol.

i. Question: Do we only need to submit one OSP even if we are offering multiple bids per item?

Answer: Offerors must submit one completed and signed Offeror Submission Package (OSP) with each offer. To clarify, offerors can only submit one offer per line item.

j. Question: If we are going to propose an alternative escalator, would we list what that escalator is in the “Notes” section when we submit the bid in the OET?

Answer: See the answer to question (f) herein.

k. Question: When proposing an alternative escalator, should we be referencing the March 1st, 2016 date for that escalator?

Answer: See the answer to question (f) herein.

l. Question: A question regarding the percentage taxes in Washington. When we put the cents per gallon number in OET, since these taxes are based on the product dollar at the time of the order, do we just base it on our submitted price? It will still vary with each order as it done currently, correct?

Answer: See the answer to question (c) herein.

-End of Amendment 0004-