AMENDMENT 0002

View the file

Other files

File Type Posted
AMEND_0003_SPE600-16-R-0210.pdf PDF
Amd_0001_SPE600-16-R-0210.pdf PDF
OSP_-_SPE600-16-R-0210(Solic).pdf PDF
SPE600-16-R-0210(Solicitation).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE 1 OF 40

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

DLA ENERGY

SPE600 7. ADMINISTERED BY (If other than Item 6)

CODE

8725 JOHN J. KINGMAN ROAD, SUITE 4950

FORT BELVOIR, VA 22060-6222

BUYERS/SYMBOL–James Forde

PHONE - (703) 767-8497 P.P. 1.8A

8. NAME AND ADDRESS OF CONTRACTOR (NO., street, city, county, State, and ZIP Code) X

9a. AMENDMENT OF SOLICITATION NO.

SPE600-16-R-0210-0001

9b. DATED (SEE ITEM 11)

24 February 2016 10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is [ ] extended, is not [X] extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _1_copy of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ X ] is required to sign this document and return _1_ copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Offerors must acknowledge receipt of this amendment by filling out block 8 above and signing and dating blocks 15A., 15B., and 15C.

below, and returning this document to DLA Energy.

The following items have been changed or updated (see details below and the continuation pages that follow)

2. Added clause 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME OF CONTRACTING OFFICER

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C. DATE

SIGNED

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

24 March 2016

1. IAW B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA ENERGY JAN 2012), paragraph (k) this amendment 0002 corrects the Base Reference Price for line items 0014 and 0015 on page 4, and in Aggregate Group 2 on page 12 of the solicitation SPE600-16-R-0210-0001.

3. See continuation pages for full text.

B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA ENERGY JAN 2012)

(a) WARRANTIES. The Contractor warrants that--

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this contract provision; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this contract.

(b) DEFINITIONS. As used throughout this contract provision, the term--

(1) Award price means the unit price offered by the Contractor and set forth opposite the item in the Schedule.

(2) Reference price means the market price, this is either published in an independent publication or supplied by the Contractor, with which the award price is to fluctuate. The reference price should be a market price for the same or similar product(s) as the item being purchased.

(3) Date of delivery means--

(i) FOR TANKER OR BARGE DELIVERIES.

(A) F.O.B. ORIGIN. The date and time vessel commences loading;

(B) F.O.B. DESTINATION. The date and time vessel commences discharging;

(ii) FOR PIPELINE DELIVERIES. The date and time product commences to move past the specified f.o.b. point; and

(iii) FOR ALL OTHER TYPES OF DELIVERIES. The date product is received.

(c) ADJUSTMENTS. The prices payable under this contract shall be the award price increased or decreased by the amount, determined according to the following formula, that the reference price shall have increased or decreased, to and including the date of delivery.

(1) The amount of increase or decrease in the award price shall be based on the same number of cents, or fraction thereof, that the reference price increases or decreases per like unit of measure.

(2) The reference price with which the award price for the listed item is to fluctuate (and which is more fully defined in the Table below) is--

[ ] (i) The low price published in _________________________________________________________.

(name of publication)

[ X ] (ii) The established price posted by Staffetta Quotidiana and published in Prezzi Italia (name of company) (name of publication)

SEE BELOW IN PARAGRAPH (k) TABLE FOR EXACT REFERENCE.

[ X ] (iii) The bi-monthly average of the prices published in PLATTS:

(name of publication)

SEE BELOW IN PARAGRAPH (k) TABLE FOR EXACT REFERENCE.

(3) COMMERCIAL. For price adjustments utilizing commercial publications such as Platts Oilgram, etc., the reference price in effect on the date of delivery shall be that item’s reference price that is in effect for the dates in the Table below. If an effective date is not cited in a publication, then the date of publication shall apply. An increase or decrease in any reference price published in a trade price service or in a commercial journal shall apply only to deliveries made on or after the effective date of such trade price service or commercial journal. In the event of a holiday for which an effective date is not used, the latest effective price(s) prior to the effective date shall be used. NOTE: Platts issues corrections to its published prices on a regular basis. Platts posts corrections to its website (www.platts.com) for its subscribers. If a correction to a reference price is found on the Platts website, all of the items that use that reference price will be corrected. DLA Energy will correct any other reference prices, as notice of the correction is received. DLA Energy will work with the pricing services to determine the appropriate price, whenever an offeror or contractor can show that the price referenced should be reviewed.

(4) NONCOMMERCIAL (NOTIFICATION). For price adjustments utilizing a reference price indicator other than commercial publications such as Platts Oilgram, the Contractor shall notify the Contracting Officer of any changes in the reference price in writing within 15 calendar days from the date thereof.

http://www.platts.com/

(i) INCREASES. Any increase in unit price as a result of an increase in reference price shall apply only to deliveries made on or after the date of receipt by the Contracting Officer of a written notification from the Contractor of such increase. However, the prices payable under this contract shall in no event exceed the Contractor’s posted or established selling price in effect on the date of delivery for the product supplied in the form of delivery made at the point of delivery. Also, no notification incorporating an increase in a contract unit price shall be executed pursuant to this contract provision until the increase has been verified by the Contracting Officer.

(ii) DECREASES. If the Contractor fails to notify the Contracting Officer of any decrease in the reference price, within the allotted 15 day period, such decrease shall apply to all deliveries made on or after the effective date of such decrease. However, if any overpayment is made to the Contractor as a result of the Contractor’s failure to give timely notice to the Contracting Officer of any decrease in the established price, the Contractor shall be charged interest on such overpayment from the date of the overpayment to the date of reimbursement by the Contractor for the overpayment in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERICAL ITEMS clause of this contract.

(5) Where the reference price is the Contractor’s established price (see (c)(2)(iii) above), the Contractor warrants that the product selected is one for which, except for modification required by the specifications of this contract, the Contractor has an established price. Such price is the net price after applying any applicable standard trade discounts offered by the Contractor for its catalog, list, or schedule price. The Contractor further warrants that, as of the current date, any differences between the unit prices of the line items identified in the Schedule and the Contractor's established price for like quantities of the nearest commercial equivalents of such contract items are due to compliance with contract specifications and to compliance with any requirements that this contract may contain for preservation, packaging, and packing beyond standard commercial practice.

(d) MODIFICATIONS. Any resultant price changes shall be provided via notification through contract modifications and/or postings to the DLA Energy web page at http://www.desc.dla.mil under the heading Vendor Resources and then Product Price Adjustments.

(e) FAILURE TO DELIVER. Notwithstanding any other conditions of this contract provision, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Excusable Delays and Termination for Cause paragraphs of the CONTRACT TERMS AND CONDITONS – COMMERCIAL ITEMS clause of the this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(f) UPWARD CEILING ON ECONOMIC PRICE ADJUSTMENT. The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed 375 percent of the award price, except as provided hereafter:

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the conditions of this contract provision will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(g) REVISION OF REFERENCE PRICE INDICATOR. In the event—

(1) Any applicable reference price is discontinued or its method of derivation is altered substantially;

(2) The reference price is an average of published or posted prices, and any one price ceases to be published or posted;

(3) The reference price is published in a trade price service or commercial journal and such publication ceases to publish said reference price or changes its method of quoting prices; or

(4) The Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions— the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustment described hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract.

http://www.desc.dla.mil/

(h) CONVERSION FACTORS. If this contract provision requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the CONVERSION FACTORS contract provision, apply unless otherwise specified in the Schedule.

(i) EXAMINATION OF RECORDS. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this contract provision.

(j) FINAL INVOICE. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this contract provision.

(k) TABLE.

ITEM

NUMBER

(PRODUCT

ID)

PRODUCT

CODE

TYPE OF FUEL PLATTS REFERENCE

USED

BRP

02/01/16* € / Liter

100 Aviation Gasoline (100LL) Dyed

GASOLINE PREM UNL FOB

MED CARGO (USD)

#AAWZA00 MIDPOINT

€ 1.027660

* Prices will adjust bi-monthly on the 1st and the 16th of every month based on previous bi-monthly (1st - 15th or 16th – end of month)-average-of the high and low price with the PLATTS Average Premium (unleaded) 10ppm FOB Med Cargo referenced publication. All posted prices are in US dollars per metric ton and will be converted to US dollars per gallon by dividing by 355.42. Using the conversion rates from OANDA published under the web site http://www.oanda.com/currency/historical-rates-classic?srccont=rightnav, prices will then be converted to Euro per liter by multiplying the average exchange rate based on previous bi-monthly (1st - 15th or 16th – end of month)-average exchange rate price (USD to EUR) by the US dollar per gallon amount and then by dividing that amount by the 3.7854 liter figure.

Continued from (ii)

I II III IV V VI

Name of If company - Reference company/ name of product; Method of price publication If publication - delivery as of (identify heading under applicable 1 FEB

Item No. by number which reference Location where to the 2016 (listed from (c)(2) price is published reference price reference (exclude items) above) and name of product is applicable price all taxes

0014 (iii) 100 LL TT 1.027660 0015 (iii) 100 LL TT 1.027660

SardegnaGroup 2 SardegnaGroup 2

Unit price adjustments for all products shall be made twice a month. Prices for the 1st of the month will be effective based on the published price in effect on the 16th of the previous month and prices for the 16th of the month will be effective based on the published price in effect on the 1st of the month which is calculated by using the electronic price published on Monday and posted on the Wednesday prior to the 1st or the 16th of each month. All base reference prices are exclusive of Taxes.

**Please note that all initial offers are to be based on reference prices published and posted January 11, 2016 and effective 1-15 February 2016.

http://www.oanda.com/currency/historical-rates-classic?srccont=rightnav

AGGREGATE GROUP 2 - GEOGRAPHIC REGION OF SARDEGNA

ITEM ESTIMATED UNIT

NUMBER QUANTITY UI PRICE CONTRACT

CONTRACTOR

NATO ACTIVITY, DECIMOMANNU AIRPORT

NATO, TSW LOCATION: N34001517, GERMAN ADMINISTRATION

OFFICE, CAGLIARI

IT

DELIVERY FEDAAC: N34001

ORDERING OFFICE:

ORDERING FEDAAC: N34001

Item: 0014 Quantity: 538,286 Liters Period of Performance: 06/01/2016-05/31/2019

Escalator: ITLYPCSLL - ITALY PCS PRODUCT LL Base-Ref: 02/01/2016 Base-Price: 1.027660

NSN Delivery Identification State

9130-015314426 (100) FP5847SGIT - USAF NATO DLA DIS SIGONEL

GASOLINE,AVIATION

Delivery Address: NATO DLA DISTRIBUTION SIGONELLA 99999

Service Code Delivery DODAAC Ordering Office DODAAC

USAF FP5847 FP5847

Mode Receipt % Max Parcel Min Parcel FOB Restriction

TANK TRUCK

No. of Tanks Capacity Type Tank Location

1 50000 R 11 TANK

Delivery Mode Notes: TT W/ PUMP & METER. DELIVERY VIA VENDOR TANK TRUCK TO USAF R-11 REFUELING UNIT THROUGH TANK TO TANK TRANSFER WILL REQUIRE NATO CAMLOCK FITTING TO BOTTOM LOADER (3 INCH) RECEPTACLE

INTERFACE.

Delivery Hours: 0800-1600 MONDAY TO FRIDAY

Delivery Ticket Notes: METERED DELIVERY TICKET REQUIRED.

NOTE:

Item: 0015 Quantity: 27,664 Liters Period of Performance: 06/01/2016-05/31/2019

Escalator: ITLYPCSLL - ITALY PCS PRODUCT LL Base-Ref: 02/01/2016 Base-Price: 1.027660

NSN Delivery Identification State

9130-015314426 (100) FP5847SDIT - USAF NATO DLA DISTRIBUTION

GASOLINE,AVIATION

Delivery Address: DLA DISTRIBUTION SIGONELLA SIGONELLA 99999

Service Code Delivery DODAAC Ordering Office DODAAC

USAF FP5847 FP5847

Mode Receipt % Max Parcel Min Parcel FOB Restriction

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

____________________ COMBO_____________________________________

(Contracting Officer: Insert applicable document type(s).

http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

___________________________DESTINATION___________________________________

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC SL4701

Issue By DoDAAC SPE600

Admin DoDAAC SPE600

Delivery DoDAAC

Ordering DoDAAC

Ship To Code

Ship From Code

Mark For Code

Service Approver (DoDAAC)

Acceptance (DoDAAC) for WAWF

Accept at Other DoDAAC

LPO DoDAAC

DCAA Auditor DoDAAC

Other DoDAAC(s)

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

James.forde@dla.mil

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

WAWF@dla.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

X
SPE600-16-R-0210
15 March 2016
NEW 3-15-16 PRICE DATA SHEET.pdf
attachment A

File details come from the government source that posted it. Updated .