SPE60015R05190002.pdf
PDF 191 KB Posted
- Attached to
- Contractor Owned Contractor Operated fuel storage services (JP-5 and F-76) in the Port of Fujairah, UAE
- Solicitation number
- SPE600-15-R-0519
- Issued by
-
Defense Logistics Agency Energy
About this file
Amendment 0002 to solicitation SPE60015R0519 (SPE60015R05190002) including pdf attachment
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO.
Port of Fujairah, UAE
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60015R0519
X
2015 SEP 25
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
8725 JOHN J KINGMAN RD STE 4950
FT BELVOIR VA 22060-6222
USA
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
A. This amendment is hereby issued under the above mentioned solicitation to provide a fillable version of pages 6 and 7, of attachment 2 to solicitation SPE60015R0519, the Offeror Submission Package (OSP). The aforementioned word document is contained in Attachment A to this amendment, SPE60015R05190002.
NOTE: For issues downloading this document, please contact the contracting office/specialist listed in block 9 of the SF1449 from SPE60015R0519 and the OSP.
PAGE 2 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE60015R0519-0002
Attachments
List of Attachments
Description File Name ATTACH.Attachment A to Amendment 0002
SPE60015R0519
TAB 14 - SOLICITATI
PAGE 3 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE60015R0519-0002
SPE600-15- R-0519
Attachment 2 Offeror Submission Package
Port of Fujairah, UAE COCO Storage
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
The services to be furnished during the period specified herein and the unit prices are as follows:
CONTRACT LINE ITEM 0001 – OCONUS COCO STORAGE SERVICES, V20000034: (FIRM
FIXED PRICE)
The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement, Section C, and all other terms and conditions set forth herein, for the FOUR (4) year period of February 01, 2016 through January 31, 2020.
AREA(S) OF CONSIDERATION: Port of Fujairah, United Arab Emirates (UAE).
The prices for the services and facilities to be provided during the FOUR-YEAR performance period
(February 01, 2016 through January 31, 2020), as described in the Performance Work Statement, includes the following:
CLIN
Product/
Tank #
Shell
Capacity
(BBLS)
Fill
Capacity
(BBLS)
OCONUS COCO
STORAGE
SERVICES
(Prorated for part month) includes initial & final shipment PRICE
(MUCC)
Annual
Storage Use
Charge
Four Year
Cost
$/BBL
/YR
0001 $ $ $ $
Dedicate d Line
Fill F-76
Dedicate d Line
Fill JP-5
CONTRACT
TOTAL
NOTE: Monthly and Annual Storage Charges shall be based on FILL CAPACITY. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage
Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.”
SPE600-15- R-0519
Attachment 2 Offeror Submission Package
Port of Fujairah, UAE COCO Storage
NOTE: In accordance with (IAW) FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999), the contractor is accepting that prices for the six one (1) month extensions (if required) will remain the same as the offered prices under DLA Energy Contract Provision B-0001-B34.01 SERVICES TO BE
FURNISHED AND PRICES (DLA ENERGY FEB 1991) unless otherwise stipulated.
IAW Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE
TANKS (DLA ENERGY NOV 2003), tanks required to be cleaned/inspected at the contractors expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to
CLIN 0001 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:
Tank Monthly OCONUS COCO
Storage Service Price
Annual Storage Use
Charge
Daily Reduction/Addition Per Tank
When Removed From/Returned To
Revenue IAW E18
CONTRACT
TOTAL
NOTE: For each full calendar month a tank is out of service and removed from revenue, CLIN 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage is offered under E18 and utilized when cleaning/inspection occurs, the rates in the above chart shall not be utilized. Instead, the awarded $/BBL/YR and calibrated fill capacity for offered alternate tankage will be utilized for monthly price calculation. Rates above shall be determined for each tank offered under CLIN 0001 by utilizing the following formula:
Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition
365 Days
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-0003-C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA
ENERGY JAN 2012)
(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM
REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site
| Word Bookmarks |
| 3 |
File details come from the government source that posted it. Updated .