SPE60015R05190002.pdf

PDF 191 KB Posted

Attached to
Contractor Owned Contractor Operated fuel storage services (JP-5 and F-76) in the Port of Fujairah, UAE
Solicitation number
SPE600-15-R-0519
Issued by

About this file

Amendment 0002 to solicitation SPE60015R0519 (SPE60015R05190002) including pdf attachment

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO.

Port of Fujairah, UAE

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60015R0519

X

2015 SEP 25

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

USA

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUED ON NEXT PAGE

A. This amendment is hereby issued under the above mentioned solicitation to provide a fillable version of pages 6 and 7, of attachment 2 to solicitation SPE60015R0519, the Offeror Submission Package (OSP). The aforementioned word document is contained in Attachment A to this amendment, SPE60015R05190002.

NOTE: For issues downloading this document, please contact the contracting office/specialist listed in block 9 of the SF1449 from SPE60015R0519 and the OSP.

PAGE 2 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE60015R0519-0002

Attachments

List of Attachments

Description File Name ATTACH.Attachment A to Amendment 0002

SPE60015R0519

TAB 14 - SOLICITATI

PAGE 3 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE60015R0519-0002

SPE600-15- R-0519

Attachment 2 Offeror Submission Package

Port of Fujairah, UAE COCO Storage

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

The services to be furnished during the period specified herein and the unit prices are as follows:

CONTRACT LINE ITEM 0001 – OCONUS COCO STORAGE SERVICES, V20000034: (FIRM

FIXED PRICE)

The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement, Section C, and all other terms and conditions set forth herein, for the FOUR (4) year period of February 01, 2016 through January 31, 2020.

AREA(S) OF CONSIDERATION: Port of Fujairah, United Arab Emirates (UAE).

The prices for the services and facilities to be provided during the FOUR-YEAR performance period

(February 01, 2016 through January 31, 2020), as described in the Performance Work Statement, includes the following:

CLIN

Product/

Tank #

Shell

Capacity

(BBLS)

Fill

Capacity

(BBLS)

OCONUS COCO

STORAGE

SERVICES

(Prorated for part month) includes initial & final shipment PRICE

(MUCC)

Annual

Storage Use

Charge

Four Year

Cost

$/BBL

/YR

0001 $ $ $ $

Dedicate d Line

Fill F-76

Dedicate d Line

Fill JP-5

CONTRACT

TOTAL

NOTE: Monthly and Annual Storage Charges shall be based on FILL CAPACITY. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage

Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.”

SPE600-15- R-0519

Attachment 2 Offeror Submission Package

Port of Fujairah, UAE COCO Storage

NOTE: In accordance with (IAW) FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999), the contractor is accepting that prices for the six one (1) month extensions (if required) will remain the same as the offered prices under DLA Energy Contract Provision B-0001-B34.01 SERVICES TO BE

FURNISHED AND PRICES (DLA ENERGY FEB 1991) unless otherwise stipulated.

IAW Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE

TANKS (DLA ENERGY NOV 2003), tanks required to be cleaned/inspected at the contractors expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to

CLIN 0001 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

Tank Monthly OCONUS COCO

Storage Service Price

Annual Storage Use

Charge

Daily Reduction/Addition Per Tank

When Removed From/Returned To

Revenue IAW E18

CONTRACT

TOTAL

NOTE: For each full calendar month a tank is out of service and removed from revenue, CLIN 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage is offered under E18 and utilized when cleaning/inspection occurs, the rates in the above chart shall not be utilized. Instead, the awarded $/BBL/YR and calibrated fill capacity for offered alternate tankage will be utilized for monthly price calculation. Rates above shall be determined for each tank offered under CLIN 0001 by utilizing the following formula:

Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition

365 Days

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-0003-C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA

ENERGY JAN 2012)

(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM

REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site

Word Bookmarks
3

File details come from the government source that posted it. Updated .