Attachment_A_to_Amendment_0002_SPE60015R0519.docx

DOCX document 20 KB Posted

Attached to
Contractor Owned Contractor Operated fuel storage services (JP-5 and F-76) in the Port of Fujairah, UAE
Solicitation number
SPE600-15-R-0519
Issued by

About this file

Attachment A to amendment 0002 SPE60015R0519 (SPE60015R0519) fillable version

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPE600-15- R-0519

Attachment 2 Offeror Submission Package Port of Fujairah, UAE COCO Storage

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

The services to be furnished during the period specified herein and the unit prices are as follows:

CONTRACT LINE ITEM 0001 – OCONUS COCO STORAGE SERVICES, V20000034: (FIRM FIXED PRICE)

The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement, Section C, and all other terms and conditions set forth herein, for the FOUR (4) year period of February 01, 2016 through January 31, 2020.

AREA(S) OF CONSIDERATION: Port of Fujairah, United Arab Emirates (UAE).

The prices for the services and facilities to be provided during the FOUR-YEAR performance period (February 01, 2016 through January 31, 2020), as described in the Performance Work Statement, includes the following:

CLIN
Product/Tank #
Shell Capacity (BBLS)
Fill Capacity (BBLS)
OCONUS COCO STORAGE SERVICES (Prorated for part month) includes initial & final shipment PRICE (MUCC)
Annual Storage Use Charge
Four Year Cost
$/BBL/YR
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Dedicated Line Fill F-76

$
$
$
$

Dedicated Line Fill JP-5

$
$
$
$

CONTRACT TOTAL

$
$
$
$

NOTE: Monthly and Annual Storage Charges shall be based on FILL CAPACITY. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.”

NOTE: In accordance with (IAW) FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999), the contractor is accepting that prices for the six one (1) month extensions (if required) will remain the same as the offered prices under DLA Energy Contract Provision B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991) unless otherwise stipulated.

IAW Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY NOV 2003), tanks required to be cleaned/inspected at the contractors expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to CLIN 0001 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

Tank
Monthly OCONUS COCO Storage Service Price
Annual Storage Use Charge
Daily Reduction/Addition Per Tank When Removed From/Returned To Revenue IAW E18
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
CONTRACT TOTAL
$
$
$

NOTE: For each full calendar month a tank is out of service and removed from revenue, CLIN 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage is offered under E18 and utilized when cleaning/inspection occurs, the rates in the above chart shall not be utilized. Instead, the awarded $/BBL/YR and calibrated fill capacity for offered alternate tankage will be utilized for monthly price calculation. Rates above shall be determined for each tank offered under CLIN 0001 by utilizing the following formula:

Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-0003-C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA ENERGY JAN 2012)

(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site

File details come from the government source that posted it. Updated .