Power Supply PWS Redacted.pdf

PDF 289 KB Posted

Attached to
Programmable AC/DC Power Supply System
Solicitation number
SP4706-27-Q-0002
Issued by

About this file

This is a Performance Work Statement (PWS) for the procurement, configuration, calibration, and delivery of a programmable AC/DC power supply system dated November 2026.

The Government requires a versatile, programmable AC/DC power supply system to support electrical testing, avionics simulation, and hardware verification. The system must operate from standard 110–120 VAC, 60 Hz single-phase input via NEMA 1-15, 5-15, or 5-20 receptacles, with capability for multiple synchronized units in master-slave or 3-phase configurations. The contractor shall furnish, configure, synchronize, calibrate, package, and deliver one complete programmable AC/DC power supply system as either a single multi-cord integrated unit or synchronized multi-unit modular system, including all interconnecting synchronization cables, input power cords, real-time monitoring software/displays, calibration certificates, and technical documentation. AC output requirements include variable voltage (12–360 VAC), variable frequency (16–800 Hz), and selectable 1-phase or 3-phase output with current capability of 0–15 A RMS (1-phase) or 0–5 A RMS per phase (3-phase). DC output must deliver variable voltage (0 to ±250 VDC) and variable current (0–20 A DC). The system must include real-time telemetry and display of output voltage, current, and frequency via front-panel display or computer software. Deliverables include hardware (due within 60 calendar days after award), real-time display/control software (concurrent with hardware delivery), operator and configuration/synchronization manuals (concurrent with hardware delivery), NIST-traceable calibration certificate and factory test report (concurrent with hardware delivery), and commercial warranty documentation covering minimum one year parts and labor (concurrent with hardware delivery). Quality assurance requires 100% inspection and functional check upon receipt for input compatibility, NIST calibration certificate review and Government acceptance test for AC and DC output verification, and 100% operational verification for real-time telemetry display. Delivery is FOB destination within the Continental United States to the DLA Product Test Center, 700 Robbins Street, Building 5-D, Philadelphia, PA 19111, with inspection and final acceptance within 14 calendar days of delivery. The contractor must provide a minimum one-year commercial warranty covering defects in materials, firmware, and workmanship. All invoices must be submitted through Wide Area Workflow (WAWF) under DoDAAC SL0701.

View the file

Other files

File Type Posted
Power Supply Tech Specs.pdf PDF
SF1449_SP470627Q0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .