TAB_2_Revised_SOW__Interior_Plantscaping_Services.docx

DOCX document 39 KB Posted

Attached to
Interior Plantscaping and Maintenance
Solicitation number
SP4705-18-R-0001
Issued by

About this file

Attachment 2 Revised SOW

View the file

Other files

File Type Posted
DLA_QUESTIONS_and_ANSWERS2.docx DOCX document
QUESTIONS_and_ANSWERS.docx DOCX document
SECTION_B.pdf PDF
SOW_Interior_Plantscaping_Services.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

STATEMENT OF WORK

ANDREW T. MCNAMARA (ATM)

HEADQUARTERS COMPLEX (HQC)

INTERIOR PLANTSCAPING AND MAINTENANCE

C.1 General Intention

The intention of this solicitation is to obtain support services for existing live and replica plants at the Defense Logistics Agency, Andrew T. McNamara Headquarters Complex (HQC), Bldg. 2462. The HQC is located at 8725 John J. Kingman Road on the North Post of Fort Belvoir, Virginia 22060. The facility is approximately a 1 million plus square foot complex consisting of ten (10) sections called Pods each having five (5) floors. The HQC has two (2) main Atrium areas, one (1) located in Pod 4 and one (1) located in Pod 10 with eight (8) minor Atrium areas each four (4) stories high. The Atriums are covered with a skylight the same size as the opening. The Atrium in Pod 10 has tall sheer windows with no skylights.

The Headquarters Complex currently has live plants located on four (4) floors. The Atrium level (first floor) has large potted live plants and in the Pod 4 (main entrance) floors two (2) through four (4) there are currently four (4) live potted plants on each floor. There is a monthly change out requirement for six (6) potted flower plants that are located at the main entrance Atrium Guard Desk. On floors two (2) through four (4), Pods one (1) through three (3) and five (5) through nine (9) there are two sizes of metal hanging planter containers located around the rail openings consisting of replica plants and silk flowers. The Contractor shall maintain and use existing decorative plant containers for the replica and live plants that reside on the Atrium and upper level floors. The Contractor shall maintain the replica plants/flowers and containers attached to the railings surrounding the opening above for each of three (3) floors in the eight (8) locations of the minor Atriums in Pods one (1) through three (3) and five (5) through nine (9). During the performance of this contract there will be a requirement for a cyclic replacement of all replica plants and flowers in all Atrium containers attached to the railings. The contractor shall include a price for replacement of replica plants and flowers in the solicitation proposal.

The Defense Threat Reduction Agency (DTRA) located in Pod 10 currently has live and replica plants. Pod 10 requires a secret clearance to enter the facility. All contractor personnel will be escorted by designated personnel during the scheduling of service. There are large potted live plants located in the Atrium lobby area, second floor Atrium stairwell landing, and first floor conference and corridor areas. There are replica plants located on the fourth floor command section and reception area that shall also be maintained.

C.2 General Requirements

C.2.1 The Contractor shall furnish all management, labor, supervision, tools, materials, equipment, storage and transportation necessary to perform work in accordance with general craft, industry standards, applicable laws, regulations, codes and Federal specifications for the work covered by the Statement of Work. The contract is for a base year, with four (4) one (1) year options. The Contractor shall plan, schedule, coordinate, and assure effective performance of all services described herein. The Contractor’s responsibilities include, but are not limited to the following tasks:

(1) Care for, change out, and replace live plants, trees, palms, and specialty plants.

(2) Clean and maintain, repair, change out, and replace replica plants and flowers.

(3) Clean and maintain, repair, change out, and replace plant containers provided as Government Furnished Equipment (GFE).

(4) Furnish live and replica plants and related materials, as required to replace existing plants, at no additional charge to the Government.

(5) Replace at its own expense any live or replica plants damaged or rendered unattractive or otherwise unusable as a result of the Contractor’s activities or failure to comply with the requirements of the contract.

(6) Pre-existing conditions (in the base year) recommendations for replacement of silk flowers or replica plants deemed unacceptable. The Contractor shall do a site survey to determine conditions of existing plants and flowers and provide an inventory of all live and replica plants and flowers along with pricing for replacement. The Contractor shall include in the technical proposal sample pictures of replica or silk flower selection(s). The replica plants and flowers shall be silk screened and embossed constituting a high grade replica.

C.2.1.1 The Contractor’s proposal will include its plan to accomplish the following tasks. The Contractor shall care for and replace as needed live potted plants throughout the HQC Atrium level and floors two (2) through four (4) Pod 4; clean, maintain, repair, and replace replica plants/flowers and railing containers on upper levels for Pods one (1) through three (3) and five (5) through nine (9), and seasonally change out and store replica flowers located in the short planter containers on floors two (2) through four (4), Pods one (1) through three (3) and five (5) through nine (9). There are an estimated 72 live container plants located throughout the HQC Atrium level, six (6) potted flower plants at the Atrium Guard Desk and 12 live container plants on floors two (2) through four (4), Pod 4. There are three types of replica flowers located in the upper level short railing containers and there are a variety of replica plants located in the upper level long railing containers. The Contractor shall change out the seasonal replica flowers three times a year and provide storage of replica flowers not being used. The replica mum flowers are installed from June 15 to November 15, the replica poinsettias plants are installed from November 15 to January 15 and the replica azalea, from January 15 to June 15. The installation shall include a cleaning and maintenance on all plants and flowers. The Contractor will replace any flowers that are damaged or otherwise found to be unusable following the cleaning maintenance. Storage associated with the seasonal change out of replica flowers shall be furnished by the Contractor. Existing replica plants/flowers are non-fire retardant and shall be replaced with non-fire retardant when required.

C.2.1.1.1 The Contractor shall care for and replace as needed live potted plants located throughout the DTRC lobby area and maintain, repair and replace as needed the replica plants located on the fourth (4th) floor. There are an estimated thirteen (13) live plants located throughout the DTRC lobby area, and ten (10) replica plants located on the fourth (4th) floor command section.

C.2.1.1.2 An inventory list of existing live and replica plants/flowers is in Attachment A.

C.2.1.2 Replica plants/trees/palms/flowers furnished by the Contractor shall be silk screened and embossed consisting of a high grade replica, non-fire retardant. The Contractor shall condition and prepare all planting materials, which are to result in a natural planting appearance for replica plants. When furnishing and replacing either live or replica plants the Contractor shall also furnish at its own expense all required related materials such as liners, floor protectors, moss and pine bark mulch top dressing.

C.2.2 The Contractor’s proposal for maintenance of live plants is to include a replacement guarantee. Each proposal shall address the following requirements at a minimum:

C.2.2.1 Fertilizing, spraying, misting, pruning, trimming, polishing, cleaning and watering all live plants.

C.2.2.2 Cleaning decorative containers.

C.2.2.3 Inspection and replacement of any plants that are unhealthy or unsightly with comparable plants.

C.2.2.5 Removal of yellow or brown foliage. The Contractor shall provide a maintenance schedule for approval by the Government.

C.2.2.6 Removal of any foreign particles from inside the containers.

C.2.2.7 Addition of pine bark top dressing.

C.2.2.8 Rotation of plants to expose all sides to the sunlight.

C.2.2.9 Water all plants as required. The current live plant containers have an internal sub irrigation watering system (CWI, Controlled Watering Inserts). Adjust water levels when necessary depending on the HQC HVAC system.

C.2.2.10 Clean dirt and dust from leaves as needed for live plants.

C.2.2.11 Clean up any area affected to include floor surface and Kiosks tops by the above list of services.

C.2.2.12 Light meter readings shall be taken as requested by the COR if plantings look below standard. The Contractor shall adjust planting types if light meter readings indicate inadequate or excessive amounts of light for the planting specified.

C.2.3 The Government reserves the right to select, inspect and approve all live plants prior to delivery and installation.

C.2.3.1 All live plants replaced by the Contractor shall be very healthy, in a vigorous growth condition, heavily branched and densely foliated.

2.3.2 Plant sizes and varieties shall be changed out with same type of plant unless otherwise approved by the COR.

C.2.3.3 All plants, including foliage, trunks, root systems and soil mass shall be free of pests, pathogens and weeds at all times.

C.2.4 Replica Plant/Flower Maintenance. The Contractor shall provide a maintenance and storage plan for the replica plants/flowers. This plan shall include cleaning and maintenance of the Government Furnished replica plants/flowers and railing containers as well as a storage plan for the change out of the seasonal replica flowers.

C.2.5 Pre-Existing Deficiencies. The site visit will be held at Fort Belvoir, Virginia at the address listed in Block 9 of Standard Form 1449. The site visit will allow interested parties to visit the HQC to determine any pre-existing conditions to the currently live and replica plants and flowers. All interested parties shall contact the Contracts Department to provide the names of two (2) or less representatives who will be attending. All attendees shall be prepared to show identification. The contractor’s proposal shall list any live or replica plant or flower deemed unacceptable, provide a color rendition of plant selection type to include a cost for replacement. Contact Beverly J. Williams via email at beverly.j.williams@dla.mil to provide the names of all attendees.

C.3 Live Plant Specifications

C.3.1 Plant Height. Overall height of existing plants or as specified in the planting schedule shall constitute a minimum requirement. Outstanding branches not visibly part of the foliage massing are to be discounted from the height measurement.

C.3.2 Plant Width or Diameter. Overall plant width or diameter shall produce a bushy appearance. Outstanding branches not visibly part of the foliage massing shall be discounted from the measurement.

C.3.3 Trunks, Stems, and Branches. All trunks must be well formed, sturdy, well rooted and self supporting. Staking is unacceptable.

C.3.4 Foliage. Foliage must be rich green, full, substantially erect and free of blemishes.

Foliage must be substantially free of dust and residues from spraying.

C.3.5 Root System. Roots must be well developed and distributed throughout the container such that roots visibly extend on all sides to the inside face of the growing container. Roots must provide firm support and insure physical stability of the plant parts above the soil. Roots must support life systems required to produce vigorous healthy growth.

C.3.6 Growing Medium. Shall provide thorough drainage and satisfactory aeration of roots. Shall provide adequate moisture and nutrient retention as may be necessary to promote vigorous but controlled growth. Shall be of sufficient density to insure the stability of the plant. Shall be free of chemical residues which could be hazardous to humans. Soil level in the growing container shall be maintained at recommended industry standard for the container height.

C.4 Government Furnished Equipment

C.4.1 The Government will provide the Contractor with upper level plant containers that are attached to the railing the full perimeter of each minor atrium on three floors for a total of 24 separate areas, approximately 188 linear feet. There are large potted live plant containers with an internal sub irrigation watering system (CWI, Controlled Watering Inserts) between 12 – 14 “ located on the Atrium level in nine separate areas. The live plants on floors two (2) through four (4), Pod 4, have 12” containers with the same type of internal watering system.

C.4.2 The Contractor shall be required to maintain the containers, so that they shall be clean and free from leaks, dirt, debris and shall not contain any material that will rust. Contractor is responsible for planter replacement as needed. See Attachment B for all container specifications.

C.4.3 Upper level replica plant/flower containers are mounted around the railings with a depth not to exceed 12” inches.

C.4.4 Upper level replica plant/flower containers are painted to match the railing surrounding the Atrium (white).

C.4.5 Upper level replica plant/flower containers installed are permanent fixtures. The planters are the property of the Government. Maintenance, cleaning and repair of the planters will be the Contractor’s responsibility.

C.4.6 Upper level replica plant/flower containers shall be concealed as much as possible by the trailing and bushy growth of the plants.

C.5 Live Plant Installation Procedures

C.5.1 All live plants requiring replacement shall be installed in the plastic nursery container in which the plant was grown or directly planted into specified water-tight container.

C.5.2 The inner container is to be supported so that its top is not more than 1 1/2" below the top of the decorative container.

C.5.3 Contractor shall deliver all replacement plants to the HQC and install according to the specifications.

C.5.4 It shall be the Contractor’s responsibility to place all plants in their designated location according to the current inventory list in Attachment A.

C.5.5 The Contractor shall provide monthly, six (6) flower plants to be placed at the HQC Atrium Guard Desk. The flowers shall be scheduled in coordination with seasonal holidays. The Contractor shall provide an annual schedule, for approval by the COR, indicating flower types for each month. This schedule shall be part of the Contractor’s technical proposal. This base year annual schedule is due thirty (30) days after contract start and then each option year’s annual schedule is due sixty (60) days prior to each option year.

C.5.6 The Contractor shall clean up all debris caused by the installation or replacement of plants and shall provide protection to all areas of the building in the travel path from the loading dock to the plant's final location. All damages caused by the Contractor to the building and furnishings shall be paid for by the Contractor.

C.6 Contractor Employees

C.6.1 The Contractor shall assign a Project Manager to oversee this contract. The Project Manager assigned will be required to have a Government security background check completed before work can start at the HQC. If a CAC card is required, an Electronic Questionnaires for Investigations Processing (e-QIP) can be filled out online. The contractor employee will fill out form DLAH 1728, bring to the COR for signature and submit to the Personnel Security Office who will provide an email invitation with instructions. Contractor employees not requiring a CAC card will be issued a Defense Biometric Identification System card. The employee will fill out form DLAH 1728, bring to the COR for signature and submit to the Pass and ID office. The COR will provide the Contractor with the appropriate paperwork and information to initiate before the assigned Project Manager can start work. For work performed in the DTRC, the contractor’s employees will be escorted due to the secret security clearance requirement for this facility.

C.6.2 All Contractor employees working in the facility will display at all times the DBIDS or HQC visitor's badge issued by the DLA Installation Support (DS-FFS) Security Office.

C.6.3 All Contractor employees shall wear a uniform clearly identifying the name of the Contractor and the employee.

C.6.4 The building is a non-smoking facility. Contractor employees found smoking in the facility will be required to vacate the installation.

C.6.5 All Contractor employees shall be citizens of the United States of America, or an alien who has been lawfully admitted for permanent residence or who presents other evidence from the Immigration and Naturalization Service that employment will not affect his/her immigration status. Contractor employees shall be able to read, write, speak and understand the English language in order to communicate with HQC tenants.

C.6.6 The Contractor shall assign a qualified Horticulturist to oversee quality assurance. The Horticulturist’s certification is required 10 days prior to contract start.

C.6.7 The Contractor shall be required to submit a resume on each employee to the COR for approval. The employee must meet certification requirements to include prior training and certification as a Certified Landscape Professional or equal. The Contractor shall be required to provide a Pesticide Business License and a Pesticide Applicator Certificate for each approved employee.

C.6.8. The Contractor and its employees are subject to DOD and DLA security and force protection measures and regulations, and will comply with these at all times while at the HQC. The Government may direct the Contractor to remove any employee from work on this contract for reasons related to security, force protection, or improper or criminal behavior while at the HQC.

C.7 Government Furnished Property

C.7.1 The Government will provide a water source in two (2) janitor’s closets located within the HQC. The locations of these closets shall be coordinated with the COR. There is no water source for the DTRC, Pod 10; therefore, the contractor shall be required to provide a water container source for this servicing this section.

C.7.2 The Government will not provide a work area for the repotting of plants. Any work that requires a work area must be performed at the Contractor's facility.

C.7.3 The Government owned Holiday decorations and Contractor provided decorations are to be used to decorate the HQC. The contractor shall inventory, install before the Holiday Season, and uninstall, repack, and return to storage all Government owned decorations after the Holiday Season.

C.8 Government Quality Assurance (QA)

C.8.1 In accordance with the FAR 52.212-4(a), “INSPECTION/ACCEPTANCE” clause, all work performed under this contract is subject to Government inspection when the Contractor tenders acceptance. The Government’s Quality Assurance Surveillance Program is not a substitute for Quality Control by the Contractor. All findings of unsatisfactory or non-performed work will be administered in accordance with the “CONSEQUENCES OF CONTRACTOR’S FAILURE TO PERFORM REQUIRED SERVICES” clause. All costs associated with re-work are the responsibility of the Contractor. The Government reserves the right to choose the inspection methods to be used in implementing its Quality Assurance Program and to vary the inspection methods utilized during the work without notice to the Contractor. If the Contractor does not adhere to the following requirements, an automatic 10% deduction will be taken from the Contractor’s monthly invoice. The Government is the governing authority in all disputes regarding Quality Assurance.

C.8.2 All workmanship shall meet the standards specified herein and shall be accomplished in conformance with approved and accepted standards of the industry; all applicable activity, local, state, and Federal standards; and all applicable building and safety codes.

C.8.3 Cleanup. During and at completion of work, debris shall not be allowed to spread unnecessarily into adjacent areas nor accumulate in the work area itself. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and/or at the end of each day work is in progress. Any work performed by the Contractor that requires cleanup after the Contractor leaves for the day, the Government will use other means and any costs associated with this cleanup will be automatically deducted in addition to the 10% deduction from the Contractor’s monthly invoice.

C.8.4 Protection and Damage. The Contractor shall provide all labor, materials and equipment necessary for the protection of the general public, equipment, and building furnishings from damage caused by the Contractor’s negligence. The Contractor shall take special care to protect Government property including furniture, walls, baseboards, floors and other surfaces from damage. Accidental splashes shall be removed immediately. Government property damaged due to work performed by the Contractor shall be repaired or replaced to the original condition and finished at no cost to the Government.

C.9 Variations in Quantities For Fixed Price Services

C.9.1 Quantities depicted throughout this contract represent the Government’s best estimate of the quantity of work for the period of performance. After contract award, situations may arise which impact upon the Government’s requirements and necessitate changes to this contract. Should this occur, the Contracting Officer (KO) will modify the contract in accordance with the provisions and limitations specified herein. No adjustments shall be made under the following provisions, except as may be specifically identified. Should other provisions in this Statement of Work conflict with the provisions herein, the other provisions will take precedence.

C.9.2 Upon notification from the Contractor, within the initial sixty (60) days of performance, the Government will adjust the contract price at the same unit price shown in the Schedule of Deductions, for validated errors in the quantities identified in this contract. The Contractor shall identify the specific error and the corrected quantity. Notification of errors after the initial sixty (60) days will not be considered.

C.9.3 If the Government elects to reduce services, adjustment will be made in the contract price at the same accepted unit price stated in the Schedule of Deductions, if the reduction does not reduce the work below ninety (90) percent of the original quantity identified, a negotiated equitable adjustment will be executed only for the work which is below ninety (90) percent of the original quantity.

C.9.4 The Government may elect during the base or option years to add to this requirement new planters, live plants or replica plants/flowers in other areas of the Complex. Any additional requirements approved by the Government shall be separately priced. Upon installation completion, the contract will be modified to include the Contractor’s additional costs for maintenance, service, repair and replacement.

C.10 Contractor Furnished Items

C.10.1 The Contractor shall provide all equipment, tools, materials, and services to perform all contract requirements. To insure continuity of essential services, the Contractor shall be prepared to fully commence work on the start date of this contract and should not assume that previous Contractor employees will be available to guide, direct or specifically orientate each Contractor employee. The Contractor shall recognize that services covered by this contract are vital to the Government’s mission. Continuity of services must be maintained at the utmost proficiency, without interruption, by the Contractor throughout the entire term of the contract. To maintain these critical services the Contractor shall provide as part of his proposal a draft quality control plan describing how he will ensure that all services will be continuously provided.

C.10.2 Quality Control Program (QCP). The Contractor shall establish and maintain a Quality Control Program in accordance with the FAR 52.212-4(a), “INSPECTION/ ACCEPTANCE” clause, to ensure that the work performed under this contract conforms to contract requirements. The Contractor’s final QCP shall be submitted to the KO fifteen (15) days after contract start for final approval.

C.10.2.1 The Contractor’s QCP shall provide Contractor management with an effective and efficient means for identifying and correcting problems throughout the entire scope of operations.

C.10.2.1.1 The Contractor’s QCP shall be available for Government Inspection and include:

(1) A description of the Contractor’s Quality Control (QC) system. The system must cover all contract services, specify work to be inspected on either a scheduled or unscheduled basis, and describe how inspections are to be conducted.

(2) The name(s) and qualifications of the individual(s) responsible for performing the QC inspections, and the extent of their authority.

(3) Provisions for recording the results of inspections and for recording corrective action taken.

(4) A file of all QC inspections both performed and scheduled, inspection results, and dates and details of corrective actions taken shall be maintained by the Contractor through the term of this contract. The file shall be the property of the Government and made available to the COR during regular working hours. The file shall be turned over to the COR within three (3) days following completion or termination of this contract.

C.10.3 Contractor Phase-In Plan. Up to ten (10) days prior to the start of the contract, the Contractor will be allowed to bring his employees on-site to become familiar with the services covered by this contract. The purpose of this phase-in period is to allow the Contractor opportunity to make necessary preparations to ensure uninterrupted performance at the start of this contract. The Contractor shall develop a phase-in plan for submittal to the KO as part of the Technical Proposal.

C.10.4 Schedule of Deductions. Thirty (30) days after contract award, the Contractor shall submit a Schedule of Deductions to the KO for review and approval, see Attachment C.

C.10.5 Contractor Licensing. The Contractor shall possess all licenses and bonding required by the local, state and Federal Government. Local Government includes Fairfax County and Ft. Belvoir. Contractor must be licensed by the Department of Agriculture for the application of pesticides, herbicides, and fungicides to any plant. The Contractor shall provide copies of all licenses and bonding 10 days prior to contract start.

C.10.6 Safety. The Contractor shall establish an accident and safety program which shall provide safety, health protection, and personnel medical maintenance as required by the Occupational Safety and Health Administration (OSHA) and all Code of Federal Regulation segments implementing OSHA. The Government reserves the right to conduct unannounced safety inspections at any time.

C.10.6.1 The Government reserves the right to investigate accidents involving Contractor personnel. The Contractor shall immediately report to the COR any bodily injury or death of Contractor personnel while in the performance of official duties, damage to Government property, or loss of Government property resulting from activities of the Contractor, its agents, or employees. The Contractor will fully cooperate with any Government investigation relating to such matters.

C.10.6.2 The Contractor shall provide employees with protection against health hazards by furnishing all industry standard protective equipment required for performance of this contract. Such equipment shall be National Institute of Occupational Safety and Health (NIOSH) or Mine Safety and Health Administration (MSHA) approved for the usage intended, whichever is the most stringent. Conflicting instructions shall be brought to the KO for resolution.

C.10.6.3 All waste material defined at 40 CFR 251.20 which could affect the environment must be disposed of in accordance with directions provided by the Environmental Office/Safety Officer.

C.10.6.4 The Contractor shall provide for use of any pesticides, herbicides and fungicides, the MSDS sheets. The Contractor shall submit the MSDS sheets 30 days after contract start. The MSDS sheets must be approved by the COR prior to Contractor’s use.

C.10.7 Fire Protection and Prevention. The Contractor shall comply with all safety and fire requirements outlined in the U.S. Army, Ft. Belvoir (USAFB) Fire Regulations, copies of which are available in the office of the Post Fire Marshall, USA Ft. Belvoir, Virginia. Ft. Belvoir has provided the HQC with a waiver for the purchase of non- fire retardant replica plants/flowers due to the sprinkler system design, location of silk plants, and fire alarm capabilities within the HQC.

C.11 Holiday Decorating C.11.1 DLA has historically and traditionally decorated the HQC for the Holiday Season and held a Holiday Tree Lighting Ceremony to start the Holiday Season festivities. The Ceremony date varies by year, but is after the first full weekend in December. Once the date is finalized, the contractor will be notified, and shall start decorating after Thanksgiving and shall complete the Holiday decorating by the first full weekend in December, prior to the Ceremony. The decorations will be disassembled and removed after New Year Day, and completed by 15 January. The Contractor shall decorate according to the Holiday Theme for that season, and submit a decoration plan no less than two weeks prior to the Thanksgiving Holiday.

C.11.2 The Contractor shall decorate the interior and exterior of the HQC for the Holiday Season utilizing a combination of Government owned decorations and decorations provided by the contractor. Contractor provided decorations shall reflect the Holiday Theme for that season. The exterior decoration areas shall consist, at a minimum, the evergreen trees at the Main entrance bedded areas, the front colonnade at the roadway, to include awning, and three (3) Spruce trees in the first island in the serpentine road. The interior areas to be decorated shall be at a minimum, the Main Entrance Lobby and Atrium, floors 1 through 4, the Main Entrance Vestibule, the Cafeteria, the Director’s Suite, the Kabieseman Room, and all first floor entrances and elevator lobbies.

C.11.3 The contractor shall decorate the HQC for the Holiday Season. Tasks shall be, but not limited to, erect the large tree and medium size trees that will be placed throughout the complex, assemble the different ornamental displays and decorations in several designated places as referenced in C.11.2, test and calibrate the effects. After the Holiday Season, disassemble all the trees and ornamental displays and decorations, retrograde and return spaces to their previous condition, and pack and store all the holiday items.

C.11.4 The contractor shall inventory all Government furnished decorations stored in the DLA warehouse, identify decorations that are deteriorating or need to be replaced, procure replacement decorations and additional decorations needed for the current Holiday Theme.

C.11.4.1 The following list contains the Holiday Decoration inventory and locations to be installed.

MINOR ENTRANCES

Install Decorated Garland on Rails, 4 - 9 LF Permanent Garland, 14" Wide w/ (3) Bows: Theme Decorated Install 3) nutcracker scenes MAIN LOBBY Install Kids Tree MAIN ENTRY VESTIBULE: Install Winter Scenes for both sides of Vestibule to include trees, snow deco & assorted Holiday Décor, 2 Custom Holiday Scene w/Props Trees, Lights, Snow MAIN LOBBY DESK: Install Garland 3 - 9 LF Permanent Garland, 14" Wide w/ (3) Bows: Theme Decorated MAIN LOBY BEHIND DESK: Install Tree 14' Artificial Holiday Slim Tree, Special Holiday Theme Install elves, nutcrackers w/ Tree

MAIN LOBBY 2 COLUMNS @ STAIR Install Lil Deco Garland @ 2 levels 8 - 9 LF Permanent Garland, 14" w/Lights and Theme Decorated MAIN LOBBY: 2 Levels Curved Rails 2 - 60"0. Artificial Wreath, Holiday Transitions

MAIN LOBBY: @ Canons 3 - 9 LF Permanent Garland, 14" Wide w/ (3) Bows: Theme Decorated

CENTER MAIN LOBBY RAILS 3 Level / 3 Sides, Each Level to receive 2.5 Strips Deco Garland 23-9 LF Permanent Garland, 14" Wide w/ (3) Bows: Theme Decorated CAFETERIA: Install Fireplace & nutcrackers to left of stair. Install mantle garland 6LF Artificial Garland, 12" Wide Theme Decorated CAFETERIA : Install 9' Tree, 9' Artificial Holiday Tree, Holiday Transitions 6 CAFE COLUMNS: Install Garland 18 - 9 LF Permanent Garland, 14" Wide w/ (3) Bows: Theme Decorated CAFETERIA: Install 60” Wreath, Artificial Wreath CAFETERIA: Install Garland@ Top Stair 3 - 9 LF Permanent Garland, 14" Wide w/ (3) Bows: Theme Decorated 8 KIOSKS IN PODS : Install 36” Boughs, 6 - 36" Artificial Holiday Bough, Holiday Transitions KABEISMAN CONF. RM - 4TH Fl. # 4419 Install fireplace scene & nutcrackers Install Garland & Mantle Décor, 9 LF Permanent Garland, 14" Wide w/ (3) Bows: Theme Decorated Install Horizontal Decor for 3 Display Case 3 24" Artificial Holiday Bough, Holiday Transitions Install 2 Alpine Tree Scene, 2 - 4', 5', 6', Artificial Holiday Alpine Trees

DIRECTORS OFFICE - 2nd Floor Install Tree & Wreaths 7.5' Artificial Holiday Slim Tree, Holiday Transitions 2 24"0. Artificial Wreath, Holiday Transitions, Install client owned Snowmen & Trains POD 10 LOBBY: Install tree 9' Artificial Holiday Slim Tree, Holiday Transitions

EXTERIOR MAIN ENTRANCE: Install lights to 5) Spruce, 2 in planters, 3 in front island 120 Holiday Mini Lights: Set of 50

4 EXTERIOR COLUMNS

4 36"0. Artificial Wreath 4 18" Red Velvet Exterior Bow w/Gold Trim (4 Loops)

ATTACHMENT A
INVENTORY LIST
QTY
SIZE
PLANT TYPE
CONT. SZ.
LOCATION
4
14
DRAC MARGINATA CHAR
36 BLK FBGL
POD 1
4
14
BJ FREEMAN
24 BLK FBGL
POD 1
3
14
AMATE
36 BLK FBGL
POD 2
4
10
DRAC WARNECKII
24 BLK FBGL
POD 2
2
14
ARBORICOLA BRAID TREE
36 BLK FBGL
POD 3
5
10
JANET CRAIG BUSH
24 BLK FBGL
POD 3
6
6
ROTATIONS
9 BLK PLST
POD 4 MAIN LOBBY - RECEPTION DESK
2
10
DRAC WARNECKII BUSH
24 BLK FBGL
POD 4 MAIN LOBBY
3
14
AMATE
48 BLK FBGL
POD 4 MAIN LOBBY
24
8
WITH U/P POTHOS
6
12
DRAC WARNECKII LEMON LIME
24 BLK FBGL
POD 4 MAIN LOBBY
2
10
FICUS SPIRE BUSH
18 FBGL BLK GRANITE
POD 4 SECOND FLOOR ATRIUM
2
10
AGLO JUBILEE
18 FBGL BLK GRANITE
POD 4 SECOND FLOOR ATRIUM
2
10
DRAC MASS CANE
18 FBGL BLK GRANITE
POD 4 THIRD FLOOR ATRIUM
2
10
DRAC WARNECKII BUSH
18 FBGL BLK GRANITE
POD 4 THIRD FLOOR ATRIUM
2
10
DRAC MARGINATA
18 FBGL BLK GRANITE
POD 4 FOURTH FLOOR ATRIUM
2
10
AGLO JUBILEE
18 FBGL BLK GRANITE
POD 4 FOURTH FLOOR ATRIUM
3
14
FICUS SPIRE
30 BLK FBGL
POD 5
4
14
ARBO BUSH
24 BLK FBGL
POD 5
4
14
ARBORICOLA BRAID TREE
36 BLK FBGL
POD 6
4
10
DRAC WARNECKII LEMON LIME
24 BLK FBGL
POD 6
2
14
DRAC MARGINATA CHAR
36 BLK FBGL
POD 7
6
12
BJ FREEMAN
24 BLK FBGL
POD 7
1
12
BJ FREEMAN
24 BLK FBGL
POD 8
3
14
AMATE
36 BLK FBGL
POD 8
4
14
DRAC WARNECKII BUSH
24 BLK FBGL
POD 8
3
14
JANET CRAIG CANE
36 BLK FBGL
POD 9
3
12
BJ FREEMAN
24 BLK FBGL
POD 9
2
10
JANET CRAIG BUSH
24 BLK FBGL
POD 9
84
Total
*LESS POTHOS AND 6 GUARD ROTATIONS
13
3’ – 12’
VARIOUS SPECIMEN
16” – 26” BLKGL
POD 10 ATRIUM LOBBY -DTRC
8
6”
VINING PLANT

POD 10 ATRIUM LOBBY - DTRC

10
18” – 6”
REPLICA PLANTS
14” – 16” BLKGL
POD 10, FOURTH FLOOR - DTRC
REPLICA PLANTS AND FLOWERS
RAIL PLANTERS
THROUGHOUT PODS

LONG HANGING AZALEA (ASST COLORS)

WINE AND GOLD CHRYSANTHEMUMS

DELUXE POTHOS LONG & SHORT

DELUXE IVY LONG & SHORT

DELUXE MAPLE IVY LONG & SHORT

AGLAONEMA LARGE

DELUXE NEPTHYTIS LONG & SHORT

SPIDER PLANTS

X-LONG BOSTON FERN

ATTACHMENT B

PLANT CONTAINER SPECIFICATIONS

ATTACHMENT B

CONTAINER SPECIFICATIONS

1. Item Number
132
2. Description
Planter
3. Manufacturer
Alle'

P.O. Box 478

Ramsey NJ 07446

4. Product Number
FPRR2424
5. Finish
Nury Cinder #208
Fabric
N/A
Frame
N/A
6. Specification
20 1/2" dia. X 20"h fiberglass

planter w/rim

7. GSA Unit Price
$.00
8. Quantity
Room Number
Quantity
Room Number
10
1430
3
1146
1
1253
3
1147
1
1254
3
1355
1
1669
3
1356
1
1670
3
1562
1
1849
3
1563
1
1832
3
1752
3
1753
3
1969
3
1970
4
2426
4
3426
4
4426

9. Total Quantity: 58

ATTACHMENT B

CONTAINER SPECIFICATIONS

1. Item Number
133
2. Description
Planter
3. Manufacturer
Alle'

P.O. Box 478

Ramsey NJ 07446

4. Product Number
FPRR3624
5. Finish
Nury Cinder #208
Fabric
N/A
Frame
N/A
6. Specification
31" dia. X 24"h fiberglass

planter w/rim

7. GSA Unit Price
$.00
8. Quantity
Room Number
Quantity
Room Number
2
1146
2
1147
2
1355
2
1356
2
1562
2
1563
2
1752
2
1753
1
1253
1
1254
1
1670
1
1849
1
1832
2
1970

9. Total Quantity: 23

ATTACHMENT B

CONTAINER SPECIFICATIONS

1. Item Number
134
2. Description
Planter
3. Manufacturer
Alle'

P.O. Box 478

Ramsey NJ 07446

4. Product Number
FPRR4824
5. Finish
Nury Cinder #208
Fabric
N/A
Frame
N/A
6. Specification
43" dia. X 24"h fiberglass

planter w/rim

7. GSA Unit Price
$.00
8. Quantity
Room Number
3
1430

9. Total Quantity: 3

ATTACHMENT C
DEDUCTION SCHEDULE

Interior Plantscaping Services – Base Year

CLIN
DESCRIPTION OF SERVICES
QUANTITY
UNITY
UNIT PRICE
EXTENDED

PRICE

0001
Guaranteed Maintenance Services – Live Plants throughout the HQC
12
Months
$___________
$___________
0002
Front Desk Flower Rotation

(6 plants rotated monthly)

12
Months
$___________
$___________
0003
Replica Flower Storage and Refurbishment / Holiday Decoration Storage
12
Months
$___________
$___________
0004
Replica Plants/Flowers Rotation Installations
3
Each
$___________
$___________
0005
Holiday Decoration Installation / Removal
1
Each
$___________
$___________
0006
Base Year Pre-existing Deficiencies
1
Each
$___________
$___________

File details come from the government source that posted it.