The document is a Questions and Answers (Q&A) Matrix for a federal solicitation (SP470326Q0009) for lead paint stripping at Defense Supply Center Richmond (DSCR) Building 98. The solicitation is a Request for Quote (RFQ) set aside for 100% small businesses in the Toxic Chemical Remediation industry (NAICS 562910), with a firm-fixed price award and 120-day performance period. Key details include a requirement for contractors to have a physical office within a 120-mile radius of DSCR, with award determined by lowest-priced, technically acceptable (LPTA) criteria.
The Q&A matrix addresses specific technical questions about the project, including confirmation that paint stripping is limited to ceiling surfaces, existing equipment to remain in place, ceiling height (25-26 feet), and work conditions. Notably, the building will not be vacant during work, with room contents being relocated as the contractor progresses. The contractor must provide standalone negative air systems, subcontract third-party clearance testing, and protect existing equipment with protective film. DSCR will move removable contents, while the contractor must propose a phasing plan. Questions are due by 5 December 2025, with quotes due by 12 December 2025, and the project is subject to FY26 funding availability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Photos.zip | ZIP file | |
| QA_Matrix_B98CeilingStripping.xlsx | XLSX spreadsheet | |
| Attachment 2 - Wage Determination.pdf | ||
| SF1442_SP470326Q0009.pdf | ||
| Attachment 1 - SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | File | Section | Question | Government Response | Response from: | |
| 1 | 1. Rafters and Purlins | |||||
| Please confirm whether the rafters and purlins are included within the scope of ceiling lead-paint stripping, or if the work is limited only to the primary ceiling surfaces | No, the stripping of paint will be restricted to solely the ceiling. | |||||
| 2 | 2. Equipment to Remain and Be Covered |
The SOW notes that equipment not removed from the building shall be covered to prevent exposure to lead.
| Could you please specify which existing equipment is expected to remain in place and must be protected? | The existing metal shelving, the metal cage, the implant rooms (bathroom, office, communication room), and the desk will remain in the building. | ||
| 3 | 3. Structure Above In-Plant Buildings / Access and Safety | ||
| There appears to be a structure on top of the in-plant buildings within Building 98. Please clarify what this structure consists of and advise whether it is designed to support worker access and can be used as a walking/working surface, or if it should be treated as not structurally safe for laborers to walk on. | The three implant rooms (bathroom, office, communication room) do seem to have a ceiling that can be utilized as a walking surface. Please see attached photos. | ||
| 4 | 4. Ceiling Height | ||
| Please provide the approximate average ceiling height for the areas included in the scope, and if available, the range of minimum and maximum heights. | The height of the ceiling is uniform throughout the building, for the most part. It ranges from roughly 25' to 26'. | ||
| 5 | 5. Please provide the Photos | ||
| 6 | |||
| 7 | 6. Please confirm the square footage or provide drawings with dimensions for the area requiring lead paint removal. | Per the SOW: Section 7. Important Considerations Subsection h. "The Contractor should conduct a site visit to each location to verify all measurements, sizes, interferences, quantity of material etc. for this project." | |
| 8 | 7. Please provide the height to the finished ceiling to determine whether scaffolding or lifts are required. | Per the SOW: Section 7. Important Considerations Subsection h. "The Contractor should conduct a site visit to each location to verify all measurements, sizes, interferences, quantity of material etc. for this project." | |
| 9 | 8a. Will DSCR provide a preferred phasing plan, or should the contractor propose one? | ||
| 8b. Will DSCR personnel handle relocation of occupied contents, or must the contractor assist? | 8a. The contractor shall propose a phasing plan |
8b. Everything that can be moved in buidling 98 will be moved by DSCR. Everything else must be covered in a protective film by the contractor.
| 10 | 9. Are work hours restricted due to occupancy (e.g., business hours only, nights/weekends allowed)? | Answered in SOW Section 17. "Hours of operation" |
| 10. Are there existing negative air systems we must tie into, or must the contractor provide full standalone systems? | Contractor must provide full standalone system | |
| 11. Should manifested hazardous waste disposal be included, or will DSCR accept waste on-site for pickup? | Answered in SOW Section 3. Specific requierments. | |
| 12. The SOW requires a third-party clearance test. Please confirm whether: DSCR will contract the tester, or The contractor must subcontract and provide the service. | Contractor must subcontract and provide service. | |
| 13. For compliance with the 120-mile commutable radius, will DSCR accept a small business that: Maintains a registered local labor office/subcontractor within the radius, or Subcontracts labor to a licensed local abatement firm within the radius? | No. The Offeror must have a physical office by which they deploy within the 120 mile radius. The facility or office of a subcontractor is not acceptable. |