This Statement of Work (SOW) details a Liquefied Petroleum Gas (LPG) delivery service for the Defense Supply Center Richmond (DSCR). The contractor will provide routine delivery and filling of 128 propane cylinders (8 gallons each) across four building locations, totaling up to 6,718 gallons per 12-month performance period. The service requires weekly tank checks and fill-ups, with the ability to replace defective cylinders upon request, supporting material handling equipment critical to daily operations.
The contract is a firm-fixed price solicitation (SP470325Q0051) set aside for 100% small businesses, with a base performance period from September 26, 2025, through September 25, 2026, and potential for two additional 12-month option periods. Contractors must be registered in the System for Award Management (SAM), possess necessary propane service certifications, and comply with various federal safety and environmental regulations. Quotes are due by July 1, 2025, at 5:00 PM EST, with the point of contact being Justin Jones from the DLA Contracting Services Office in Richmond, Virginia.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis Sol combo LPG.docx | DOCX document | |
| Pricing Sheet LPG.xlsx | XLSX spreadsheet | |
| Pricing Sheet LPG.xlsx | XLSX spreadsheet | |
| Synopsis Sol combo LPG.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Defense Logistics Agency
DLA Installation Management Richmond DM-FRIF
Delivery of Liquefied Petroleum Gas (LPG)
May 27,2025
STATEMENT OF WORK (SOW)
1. SCOPE STATEMENT
The Contractor shall furnish all labor, transportation, equipment, materials, tools, instruments, supplies, supervision, and management required to support the delivery of Liquefied Petroleum Gas (LPG) to the Defense Supply Center Richmond (DSCR) essential for proper equipment operation and job performance. The Contractor will put DSCR on a routine delivery schedule and all tanks’ locations will be serviced and kept full without DSCR personnel having to call for services, unless the mission dictates the need for an increase in the deliveries.
The Contractor shall provide liquefied petroleum gas up to 6,718 gallons per performance period (12 months) to fill 128 tanks.
The contractor shall supply 128 (8 gallon) propane cylinders for material handling equipment. After initial delivery of the tanks, the Contractor shall provide weekly fill-up from their own large tank. The Contractor shall check bottles once a week to ensure all bottles in the cages are filled.
2. PROJECT OBJECTIVE
The Contractor shall assure that Contractor personnel completely understand the requirement of this Statement of Work. All Contractor service technicians must have all necessary certification for propane service and sound mechanical aptitude and ability; and extensive working knowledge of servicing, filling and inspecting condition of contractor’s propane tanks for ware and overall condition.
The contractor shall be available to come and fill in empty cylinders or replace defective cylinders upon DSCR request in the event an excessive number of bottles is empty.
The Contractor will put on a routine delivery schedule and all tanks will be kept full without DSCR personnel having to call for services.
3. BACKGROUND
The Defense Supply Center Richmond requires contract support to assist with the delivery and filling of 128 (8 gallon) propane cylinders for material handling equipment. This material handling equipment is very vital for these locations’ daily operation in support of the War Fighter.
4. SPECIFIC REQUIREMENTS
Serving Location
| Cage Location |
| Number Cylinders |
| Building 4 (North side) |
| 40 cylinders |
| Building 54 (East side-back of building) |
| 8 cylinders |
| Building 59 (East side parking lot |
| 40 Cylinders |
| Building 65 (corner 4th and C Road) |
| 40 Cylinders |
5. CONTRACTOR QUALIFICATIONS
The Contractor shall provide qualified personnel that process the knowledge of all applicable Federal, State, and Local code requirements transport and service LPG cylinders.
6. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The QASP identifies the methods the Government will use to measure the performance of the Contractor against the requirements and performance standards of this SOW. The QASP consists of guidelines for performance surveillance, evaluation, reporting, deficiency notification, and adjustments. The Government will conduct quality assurance inspections on all phases and types of work performed. The Government reserves the right to perform quality assurance inspections at any time. The Government will perform quality assurance of Contractor's performance under this contract using the method of surveillance 8.0.
7. PERFORMANCE REQUIREMENTS SUMMARY
The tasks the Contractor shall perform are defined in the SOW. All deliverables will be submitted to the COR for acceptance unless otherwise agreed upon.
The Government will make objective and subjective assessments of the Contractor’s performance to determine whether contract performance is acceptable. The Contractor is expected to perform all functions in a professional manner and prepare accurate and timely documentation. Progress will normally be tracked based on the milestone event such as when a delivery is due. It is expected that the documentation and procedures will comply with all major regulatory and process requirements, and agency policies and procedures.
8. Method of Surveillance The Government will ensure quality assurance and timeliness of all tasks via COR random inspections and customer feedback. The Government will inspect and evaluate the performance of each completed task required.
9. Method of Surveillance The Government will ensure quality assurance and timeliness of all tasks via COR random inspections and customer feedback. The Government will inspect and evaluate the performance of each completed task required.
10. General Acceptance Criteria N/A
10.1. Performance Review and Payments
The Contractor’s performance will be monitored by the COR. The tasks will be rated on the performance of the Contractor on the timeliness and quality of the services provided using the ratings for each criterion as shown below.
Below are the Performance Standards that will be used in evaluating performance.
Performance standards and ratings are designed to determine if performance meets or does not meet a given metric and acceptable quality level.
Note: The application of these performance ratings or failure of the Government to apply these performance ratings does not waive any of the Government’s rights to other remedies under this contract or otherwise available to the Government. The following overall ratings will be used:
Overall Performance Ratings
Satisfactory – Performance meets or exceeds contractual requirements. The contractual performance reflects a minor problem(s) for which corrective actions taken by the Contractor appear or were satisfactory.
Fair – Performance does not meet some contractual requirements. The contractual performance reflects a minor problem(s) for which the Contractor has not yet identified corrective actions or the Contractor’s proposed actions appear only marginally effective or were not fully implemented. The minor performance problems(s) do not adversely impact the mission of the Agency.
Marginal – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem(s) for which the Contractor has not yet identified corrective actions or the Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.
Timeliness
| Satisfactory |
| Meets or exceeds contractual requirements in terms of timeliness of delivery. |
| Fair |
| Does not meet some contractual requirements in terms of timeliness of delivery. The timeliness of contractual performance reflects a minor timeliness problem(s) for which the Contractor either has not yet identified corrective actions or the Contractor’s proposed actions appear only marginally effective or were not fully implemented. The minor timeliness problem(s) do not adversely impact on the mission of the Agency. |
| Marginal |
| Does not meet some contractual requirements in terms of timeliness of delivery. The timeliness of contractual performance reflects a serious problem(s) for which either the Contractor has not yet identified corrective actions or the Contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Does not meet most contractual requirements in terms of timeliness of delivery and recovery is not likely in a timely manner. The timeliness of contractual performance contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective. |
Quality
| Satisfactory |
| Meets or exceeds contractual requirements in terms of quality of work performed. The quality of contractual performance reflects a minor problem(s) for which corrective actions taken by the Contractor appear or were satisfactory. |
| Marginal |
| Does not meet contractual requirements in terms of quality. The quality of contractual performance reflects a serious problem(s) for which the Contractor either has not yet identified corrective actions or the Contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Does not meet most contractual requirements in terms of quality and recovery is not likely in a timely manner. The quality of contractual performance contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective. |
11. PERIOD OF PERFORMANCE
Deliveries to start 10 days from the notice to proceed
12. APPLICABLE DOCUMENTS
The contractor is required to reference and follow the latest editions of the following publications:
a. Occupational Safety and Health Administration (OSHA)
b. Regulations (CFR) 1910.110 (Storage and Handling of Liquefied Petroleum Gases)
c. The National Propane Gas Association (NPGA)
d. National Fire Protection Association’s Liquefied Petroleum Gas Code (NFPA 58)
e. The Environmental Protection Agency’s Code of Federal Regulations 40
13. INSTALLATION SECURITY REQUIREMENTS
Work to be performed under this contract or task order may, in full or in part, be performed at the Defense Supply Center Richmond), with physical access to a federally controlled facility. Prior to beginning work on a contract, DLA and its field activity offices require all contractor personnel working on the federally controlled facility to have a minimum of a favorably adjudicated National Agency Check with Written Inquiries (NACI) or NACI equivalent.
i. The Contractor shall comply with current visitor pass requirements for access to and/or performance of work at DSCR, which can be found at https://www.dla.mil/Aviation/Installation/Visitors.aspx
ii. No employee or representative of the Contractor will be admitted to the work site unless he/she furnishes satisfactory proof that he is a citizen of the United States or an alien who has been lawfully admitted for permanent residence, or who presents evidence from the Immigration and Naturalization Service that employment will not affect his immigration status.
iii. Personnel Information: All authorized non-military personnel utilizing the base are required to always have in their possession an installation visitor pass or access control badge. This pass shall be worn on the outer most garment above the waistline. This pass is issued by the DSCR Visitor Center, located at Building 210. The Visitor Center is open Monday through Friday except federal holidays from 6:30 a.m. to 4:30 p.m. To obtain pass/badge, the Contracting Officer or designee will request personal identifiable information (PII) from each contractor. The contractor should complete DBIDS pre- registration online using the following link DBIDS Pre-Enrollment (dmdc.mil). Once pre-registration has been complete, they should forward their alpha-numeric code to their COR/PM.
iv. One day pass: Contractors requiring only a one-day visit may request a one-day pass through DBIDS pre-registration online. Contractors are permitted one, one day pass per year. Once the COR/PM submits the alpha numeric code and receive an approved status from Security the personnel can arrive at the visitor’s center with the alpha numeric code to receive their day pass.
v. Official Capacity: The Contractor shall comply with visitor pass requirements for the performance of work at DSCR.
vi. If entry is denied, the COR/PM will be notified. The vetting official (VO) will deny access to any person who the Installation Commander has deemed unfit for unaccompanied access.
vii. Proof of Identity: Official identification consists of any current Government issued picture identification. Examples of official identification are valid state issued driver's license, military ID card, military dependent ID card, green card, etc. Expired identification is not valid.
viii. Pass or Badge Management: Expired, invalid, inaccurate, inoperative, or terminated pass or Access Control Badge shall be returned to the Contracting Officer or his designee for disposition. These cards are the property of the U.S. Government and shall not be retained by the cardholder upon expiration, replacement, or when the DoD affiliation of the employee has been terminated. The Contract Officer or his designee shall deliver all returned contractor badges to Security & Emergency Services in building 201 or designee at the Visitor Center within 5 business days. If the Pass or Access Control Badge is lost or stolen, a police report will be completed, and the applicant must submit a new request through DBIDS pre-registration portal. Compliance with this requirement is mandatory and certification thereof to the Contracting Officer is required prior to submitting final invoices. Failure to return badges will hold up Contractor's final payment.
ix. Contractor Security Responsibilities: The contractor is responsible for employees and subcontractors under their employment. Contractors will ensure that employees are familiar with and obey installation traffic, safety, and security regulations. Contractor employees, including subcontractors, are required to always wear the ID card conspicuously on their outer clothing and above the waist while working on DSCR. Personnel are subject to challenge and removal from the work area if the ID card is not being worn. It is the COR/designee’s responsibility to enforce this requirement. Failure to do so is just cause for ordering that work on a contract be stopped.
x. Unofficial photography, cameras, or photographs are prohibited on DSCR property. When official photographs are required, submit a written approval request containing specific justification and details to your Contracting Officer 5 days prior.
xi. Firearms, Weapons, Illegal Drugs, and Contraband are prohibited on DSCR property. Violators may be prosecuted. State issued/authorized concealed weapons permits are not valid on Federal (DSCR) property. See Attachment 7 for additional details.
xii. Trusted Traveler Program (TTP): Trusted Traveler program allows Uniformed Service Members, DoD civilian employees, Military retirees, adult dependent (spouse) of active duty or retired Service Members to escort. Contractors are not authorized to use the TTP to escort individuals on to the installation. The TTP only applies to installation access and does not authorize vehicle occupants to enter any controlled areas, restricted areas or other areas as designated by the Commander without first meeting the security requirements and procedures of those areas.
xiii. Camera Security Policy
a. If a contractor would like to take photographs on DSCR it must follow the below guidance. Submit all requests to the PM/COR on the visit request form with all information filled out.
b. This guidance applies to the use of photographic devices, i.e., cameras, video recorders (including cell phones and other electronic communications devices) on DSCR, including tenant activities.
c. DLA Aviation Public Affairs Office (PAO) is the approving authority for all photography on DSCR pertaining to media and the taking of photographs and/or videos by non-federal employees for use in non-DLA or DoD news or promotional materials. Members of the DLA Aviation PAO will coordinate, approve, and escort members of the media on DSCR at all times. Under no circumstances will media be allowed on DSCR or to take photographs without having a PAO representative present.
d. DLA Installation Management Richmond, Security and Emergency Services Division (DM-FRS) is the approving authority for all photography and/or videography conducted by contractors in support of projects being overseen or granted by DLA Installation Management. DM-FRS is responsible for oversight of such contractors taking photographs on DSCR and will process and issue camera passes to contractors.
e. Contractors who take photographs must be escorted and obtain prior approval of their photography from the PM/COR.
f. Requests for camera passes must be submitted by employees charged with escorting contractors. Submit requests via email to avnvisitrequest@dla.mil with “Camera Pass” in the subject line. Requests should be made no later than 3 days in advance of the event date requested and must include the name, title, and company of the individual to be issued the pass, area to be photographed and purpose, the escort’s point of contact information, and the desired length of the pass.
g. All employees are responsible to ensure that classified information under their control, and unclassified material that falls under the Privacy Act of 1974 or protected under the Freedom of Information Act, will be not photographed.
h. Cameras will not be allowed in areas where classified information is discussed, electronically or physically stored, processed, or transmitted. Photography is also not authorized in locker rooms, and restrooms. Visitors and members of the general public who are granted access to the installation may take photographs of outdoor areas such as the static aircraft displays, historic buildings, the elk herd, and at social gatherings.
i. Photographs will not be taken of access control points.
xiv. The Government is not responsible for job site security. Removal of material from jobsite and DSCR are subject to security checks. The contractor is to notify DSCR security of any special measures (watchmen, alarm, etc.), security concerns, security problems, or unusual activities within the job site.
xv. Traffic laws and enforcement:
a. Motor Vehicle Operation: Ingress and egress of personnel will be subject to the DSCR security regulations. All personnel must be made aware of the base speed limits, which is 25 mph (unless otherwise posted). Speed limits are enforced, and violators will be ticketed. DSCR traffic violations are processed through the federal court system.
b. Seatbelts are MANDATORY.
c. Use of cellphones while driving is prohibited. Exception: use of "hands free" devices for cellphone use is authorized.
d. Parking is in designated areas only, between two white lines. No parking is permitted in fire lanes, on seeded areas, in reserved parking slots, or assigned handicapped parking. Any equipment or vehicle that does not fit within a standard parking space must contact the Contracting Officer to determine a designated area for parking such equipment or vehicle.
e. Traffic accidents should be reported immediately to the DSCR Emergency Dispatch by calling 911 or (804) 279-4888 for non-emergencies.
f. All personnel entering DSCR are subject to random vehicle inspections/searches at any time while on the Installation. The purpose of these inspections is to detect the theft of Government and private property, or entry onto DSCR with firearms, weapons, alcoholic beverages, illegal drugs, or contraband.
xvi. Truck deliveries:
a. The contractor shall notify the Contracting Officer of truck deliveries and escort trucks from the truck gate to its destination.
b. All commercial vehicles will enter DSCR through the Commercial gate adjacent to the North Gate access control point (ACP). All commercial vehicles will also depart the installation via the North Gate. Commercial vehicles include, but are not limited to, semi-trucks, box trucks, passenger busses, cargo vans, dump trucks and walk-in vans. All such vehicles entering the gate will be processed through an entrance security inspection point before continuing onto the Installation.
c. Vehicle Inspection: DLA police per the most current Police Standard Operating Procedure will conduct Commercial/large vehicle inspections on all vehicles. The inspection may be upgraded based upon Force Protection Conditions (FPCON).
d. Shipment Validation: All deliveries to DSCR will have some form of identifying documentation. For example, a bill of lading must identify: 1) a DSCR POC and 2) a delivery location. Validation will consist of reviewing the delivery documentation by DLA police officers as provided by the delivery truck driver. Failure to do so may result in delivery delay or denial of the delivery. The source of delivery will be identified and verified by DLA police officers.
e. Driver Vetting: DLA police officers will vet all delivery/commercial truck drivers prior to allowing entrance onto DSCR. Vetting will consist of conducting a background check of the driver and all passengers using Virginia Criminal Information Network (VCIN). Any driver or passenger having an outstanding warrant will be handled in accordance with DLA/DSCR procedures. If the driver and/or passengers have personal weapons (firearms) or dangerous weapons, they will not be authorized entrance to the facility. If procedural requirements have not been met, the driver will not gain access.
f. Increased FPCON requires increased screening requirements. FPCON Charlie and Delta require the opening and visual inspection of each package.
Starting May 7, 2025, visitors seeking unescorted access to Defense Supply Center Richmond (DSCR) must present a Real ID-compliant driver’s license or identification card, or an alternative ID such as a passport.
DSCR will no longer solely accept a state-issued identification that does not meet the Real ID Act of 2005 standards as proof of identity. For more information on the Real ID Act, please visit these sites: REAL ID | Homeland Security (dhs.gov) and REAL ID FAQs | Homeland Security (dhs.gov).
It’s incumbent on government sponsors to inform first-time visitors and personnel renewing expired passes of the Real ID requirement. Government sponsor and visitors can further expedite this process by following the pre-approval steps: DBIDS Pre-Enrollment Instructions. More information on this process and other services at the Visitor Center can be found at: DSCR Visitor and ID Office. Personnel with current passes will not be asked to provide a Real ID until a new pass is requested.
Visitors requesting access without a Real ID Act-compliant ID or who can’t provide a supplemental ID will be denied unescorted access.
DSCR contractors/employees that utilize private transportation companies such as UBER/LYFT may be affected by this new requirement. If the driver for the private transportation service does not possess a Real ID, they will be denied access to the Installation. This will apply to both drop-offs and pick-ups. In these situations, the employee may be dropped off at or picked up from the Visitor Center.
14. PHYSICAL SECURITY
The contractor shall be responsible for safeguarding all Government equipment, information and property accessed while performing the work of this SOW. At the end of normal duty hours and/or after normal duty hours, all Government facilities, equipment, and materials shall be secured.
a. SECURITY INCIDENTS
i. In the event keys are lost or duplicated, the contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its sole option, may replace the affected lock or locks or perform re-keying. When the Government, the total cost of re-keying or the replacement of the lock, performs the replacement of locks or re-keying or locks shall be deducted from the monthly payment due the Contractor.
ii. The contractor shall prohibit the use of Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
b. LOCK COMBINATIONS The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
c. SAFETY AND HEALTH REQUIREMENTS The contractor shall comply with all applicable federal and state safety rules and regulations pertaining to this SOW in Attachment 2.
d. ENVIRONMENTAL REQUIREMENTS The contractor shall comply with all applicable federal and state environmental laws and regulations pertaining to this SOW in Attachment 3. Any concrete washout shall be properly contained (kiddie pool, plastic etc.) and allowed to dry prior to disposal. No concrete washout will be permitted directly on the ground anywhere on DSCR.
e. DISCLOSURE OF INFORMATION Information made available to the contractor by the Government for the performance or administration of this effort shall be used only for those purposes and shall not be used in any other way without the written agreement of the Contracting Officer. The contractor agrees to assume responsibility for protecting the confidentiality of Government records, which are not public information. Each contractor or employee of the contractor to whom information may be made available or disclosed shall be notified in writing by the contractor that such information may be disclosed only for a purpose and to the extent authorized herein.
f. LIMITED USE OF DATA Performance of this effort may require the contractor to access and use data and information proprietary to a government agency or government contractor that is of such a nature that its dissemination or use, other than in performance of this effort, would be adverse to the interests of the Government and/or others. Contractor and/or contractor employee shall not divulge, or release data or information developed or obtained in performance of this effort until made public by the Government, except to authorize Government personnel or upon written approval from the Contracting Officer. The contractor shall not use, disclose, or reproduce proprietary data that bears a restrictive legend, other than as required in the performance of this effort. Nothing herein shall preclude the use of any data independently acquired by the contractor without such limitations or prohibit an agreement at no cost to the Government between the contractor and the data owner that provides for greater rights to the contractor.
g. DATA RIGHTS The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without prior written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
15. OTHER PERFORMANCE REQUIREMENTS
a. SECTION 508 COMPLIANCE REQUIREMENTS Any/all electronic and information technology (EIT) procured through this effort must meet the applicable accessibility standards at 36 CFR 1194. 36 CFR 1194 implements section 508 of the rehabilitation act of 1973, as amended, and is viewable at http://www.section508.gov.
b. PERMITS The contractor shall, without additional expense to the Government, obtain all appointments, licenses, and permits required to perform under this contract. Evidence of such permits and licenses shall be provided to the Contracting Officer and/or his designated representative before work commences and at other times as requested by the Contracting Officer and/or his designated representative. The contractor shall notify the COR/PM at least 24 hours in advance of any work that involves open flames, grinding, or spark producing operations, and shall obtain a Hot Work Permit from the fire prevention office in advance of performing any work requiring a hot work permit.
c. PAYMENTS FOR UNAUTHORIZED WORK No payments will be made for any unauthorized supplies/services or for any unauthorized changes to the work specified in this SOW; this includes any services performed by the contractor of their own volition or at the request of an individual other than a duly appointed Contracting Officer. Any additional work to be performed beyond the terms of this SOW must be approved by a Contracting Officer in writing prior to the commencement of such work; thus, only a duly appointed Contracting Officer is authorized to change the specifications, terms, and conditions under this effort.
d. INVOICING AND PAYMENT SCHEDULE
i. The contractor shall submit the invoice monthly. The invoice shall include the specific performance standards performed and accepted and associated performance payments being invoiced for the month. Invoices are to be sent directly to the COR electronically at the address included in this SOW. Within seven days of the receipt of the invoice, the COR will review for accuracy and payment will be certified in the appropriate system by the Contracting Officer or COR. The requirements of a proper invoice are subject to FAR 52.232‐25 - Prompt Payment. The vendor may check on the status of their invoice(s) by registering for My Invoice at https://myinvoice.csd.disa.mil/ or contacting DLA at (800) 756-4571.
ii. The following correct information constitutes a proper invoice per the Prompt Payment Act standards, and/or is required documentation for payment requests submitted electronically. Hard copy invoices cannot be accepted.
iii. Name and Address of Contractor or Vendor
iv. Invoice date
v. Contract number (including the order/call number where applicable), or other authorization for delivery of goods or services. Note: DO NOT USE THE BID OR SOLICITATION NUMBER.
vi. Invoice number, account number, and/or any other identifying number agreed to by contract.
vii. Shipment Number, including the date (where applicable). Same as Block 2 of the DD Form 250. (See “Shipment Number Construction and Usage”, page 13 for format).
viii. Description: line item number, National Stock Number, Manufacture’s Part Number, unit of measure, quantity shipped, unit price, and extended amount, where applicable.
ix. Shipping and payment terms (unless mutually agreed that this information is only required in the contract); including terms of any discount for prompt payment offered.
x. Electronic Funds Transfer (EFT) banking information, unless agency procedures provide otherwise, or except in situations where the EFT requirement is waived under 31 CFR 208.4.
xi. Point of Contact (POC) name (where practicable), title and telephone number of person to notify in the event that the invoice is defective.
xii. Other substantiating documentation or information required.
xiii. The contractor’s failure to include the necessary information will result in invoices being rejected.
xiv. Back up documentation (such as timesheets, receiving reports etc.) can be included and attached to the invoice. Attachments created in any Microsoft Office product are attachable to the invoice. Maximum size limit of each attachment is 2 Megabytes (MB). Total size limit for all files is 5MB.
xv. After clicking the “submit” button, a Notice of Successful/Unsuccessful Submission will appear. This screen contains a “Send More E‐Mail Notifications” button. Click on this button and add the email addresses for the Program Office and others as desired. Notification shall be provided for each invoice submitted.
xvi. WAWF Tools and Help
xvii. The vendor may have their CAGE code activated (required only first time) in WAWF by calling 866‐618‐5988. Once activated, the vendor should self‐register at the web site https://wawf.eb.mil.
xviii. Vendor training is available at: http://www.wawftraining.com. Additional support can be obtained by calling the DISA Ogden Help Desk at 1‐866‐618‐5988 or e‐mailing to cscassig@ogden.disa.mil.
xix. WAWF Vendor “Quick Reference” Guides are located at:
xx. https://acquisition.navy.mil/rda/home/acquisition_one_source/ebusiness/don_ebusiness_solution s/wawf_overview/vendor_information.
xxi. PERSONNEL AND RELATED REQUIREMENTS
xxii. CONTRACTOR EMPLOYEES
xxiii. Contractor personnel shall present a neat appearance and be easily recognized as Contractor employees by wearing a Security Identification Badge at all times above the waist while on Government premises. When Contractor personnel attend meetings, answer phones, and work in other situations where their status is not obvious to third parties, they must identify themselves as such to avoid creating the impression that they are Government employees.
e. CONTRACT OVERSIGHT POSITION The contractor’s proposal shall include the name and contact information of the individual responsible for the following functions:
a. Authority to act as the principal point of contact with the Contracting Officer.
b. Authority to submit invoices and act on the vendor’s behalf in contract performance matters.
f. CONTRACTOR INTERFACES The Contractor may be required as part of the performance of this effort to work with other Contractors or Government employees working for the Government. Also, this Contractor shall not direct the work of other Contractors in any manner. Contract personnel will also interface with other support personnel, such as the Contracting Officer Representative (COR), and the Government Program Manager as required. Contract personnel will also interface with internal and external customers.
16. HOURS OF OPERATION
Normal hours for contractor work on DSCR will be from 7:00am-5:00pm Monday through Friday excluding holidays or base closures. Each project may have different work hours. The contractor shall request what hours they would like to work from the PM for approval.
17. FEDERAL HOLIDAYS
The Contractor shall not provide services on the eleven Federal holidays observed at DLA unless approved by the Contracting Officer. The following holidays are observed:
a. New Year's Day (January 1)
b. Martin Luther King's Birthday (Third Monday in January)
c. Presidents’ Day (Third Monday in February)
d. Memorial Day (last Monday in May)
e. Juneteenth (June 19)
f. Independence Day (July 4)
g. Labor Day (first Monday in September)
h. Columbus Day (Second Monday in October)
i. Veteran's Day (November 11)
j. Thanksgiving Day (Fourth Thursday in November)
k. Christmas Day (December 25th)
l. When one of the above holidays falls on Sunday, the following Monday will be observed as a legal holiday. When the federal holiday falls on a Saturday, the preceding Friday is observed as the holiday.
18. OTHER DAYS OF INSTALLATION CLOSURE
When the Installation Commander closes the installation for any reason, including but not limited to days of inclement weather, the Contractor shall not provide services until DSCR reopens.
In cases of inclement weather or other emergency installation closures the contractor shall contact DSCR emergency notification hotline at (804) 279-3599 to verify status.
19. PLACE OF PERFORMANCE
Place of performance will be the Defense Supply Center Richmond (DSCR) located at 6090 Strathmore Rd., Richmond, VA 23237 Richmond, Virginia.
20. POINTS OF CONTACT
CONTRACTING OFFICER Name: ADD TEXT Comm. Phone: (804) 279- ADD TEXT Fax: (804) 279- ADD TEXT Email: ADD TEXT DLA Contracting Services Office (Richmond) 6090 Strathmore Rd.
Richmond, Virginia 23237
CONTRACT SPECIALIST
Name: ADD TEXT Comm. Phone: (804) 279- ADD TEXT Fax: (804) 279- ADD TEXT Email: ADD TEXT DLA Contracting Services Office (Richmond) ATTN: ADD TEXT 6090 Strathmore Rd.
Richmond, Virginia 23237
CONTRACTING OFFICER REPRESENTATIVE (COR)
The Installation Management Richmond COR point of contact is: Name: Clarence Moore Alternate: Heather Reese Comm. Phone:
Cell Phone: 804-971-3220 Fax: (804) 279- ADD TEXT Email: Clarence.Moore@dla.mil DLA Installation Management Richmond 6090 Strathmore Rd.
Richmond, Virginia 23237
PROJECT MANAGER (PM) Name: ADD TEXT Comm. Phone: (804) 279- ADD TEXT Cell Phone: ADD TEXT Email: ADD TEXT DLA Installation Management Richmond 6090 Strathmore Rd.
Richmond, Virginia 23237
ATTACHMENT 2
SAFETY AND HEALTH REQUIREMENTS
Contractors shall comply with all federal, state, and local occupational safety and health regulations, such as but not limited to US Department of Labor and Industry Occupational Safety and Health Administration (OSHA) , 29 CFR 1904,1910,1926, 41 CFR 50-204 if applicable; in addition to safety requirements of US Army Corps of Engineers EM385-1-1 (latest edition), National Electric Codes (NEC), National Fire Protection Association (NFPA) Codes and Standards, Department of Defense (DoD) and Defense Logistics Agency (DLA) safety regulations, for the life of the contract. The safety provisions listed above are only general in nature and not intended to be all-inclusive. For COVID-19 requirements see attachment 6.
1. SAFETY PLAN DELIVERABLE
The Contractor shall submit a site-specific Occupational Safety and Health Plan (OSHP) to the DLA Aviation Safety Office approval prior to the issuance of a notice to proceed for any on-site work for this SOW. Failure to submit an OSHP may result in termination of the contract. All site specific OSHP shall be developed to comply with all federal, state, and local occupational safety and health regulations, consensus standards, and any trade specific practices which will include but not limited to the following; US Department of Labor and Industry Occupational Safety and Health Administration (OSHA) , 29 CFR 1904,1910,1926, 41 CFR 50-204 if applicable; in addition to safety requirements of US Army Corps of Engineers EM385-1-1 (latest edition), National Electric Codes (NEC), National Fire Protection Association (NFPA) Codes and Standards, Department of Defense (DoD) and Defense Logistics Agency (DLA) safety regulations; and must at a minimum, be strictly adhered to by all contracted personnel. The following are required and must be submitted to the safety office via the PM.
An OSHP will be required for all contracted services involving the construction, alteration, and/or repair, including painting or decorating of Government buildings, public works, and equipment in addition to all activities using/applying products requiring safety data sheets (formerly material safety data sheets (MSDS)). OSHPs will also be required for all activities were there are potential health hazards that could be a result of the contracted services (i.e., hazardous material surveys and clean up, confined space entry, etc.). All contractors who are subjected to the submittal of OSHP shall also submit their most recent OSHA 300 log in accordance with 29 CFR 1904.
An OSHP will not be required for non-personal services contracts including, but not limited to, those, which are administrative only, deliveries/pickups, transportation, or for nondestructive surveys. However, if contracted services specify a DSCR provided workspace the contractor should submit an OSHP or provide their COR and/or COTR with a letter stating that they will adopt and operate under DLA Aviation’s written occupational safety and health control programs. The contractor should work through the Government assigned COR/COTR/PM and the Government assigned COR/COTR/PM will work with the DLA Aviation Safety Office.
All Contracted services requiring an OSHP where operations involving demarcating work areas with protective coverings, shields, protective barriers, barricades, warning signs and the like, will be furnished and installed by the Contractor where a hazard or potential hazard exists. Notices shall be provided to the PM twenty-four (24) hours prior to the planned installation of protective barriers and barricades, the Contractor will coordinate with the COR and/or COTR for concurrence. Barricades and barriers will be removed by the Contractor at the completion of the work in the area.
2. ACCIDENT/INCIDENT
Contractors shall notify the Contracting Officer Representative (COR)/Project Manager and the COR/PM will IMMEDIATELY notify the DLA Aviation Safety Office after an accident/incident of any kind. If there is a fatality, loss of an eye, inpatient hospitalization, or amputation to any of the contractor's employees, the contractor will submit a completed and detailed DLA Form 1591 or equivalent form to the COR/PM, who in- turn, will submit it to the DLA Aviation Safety Office for recordkeeping purposes.
Any other near misses or mishaps shall be immediately reported through a contractor incident report. The form will be provided upon notification from the contractor.
3. SAFETY AND HEALTH VIOLATIONS
US Department of Labor and Industry Occupational Safety and Health Administration (OSHA), 29 CFR 1904,1910,1926, 41 CFR 50-204 if applicable; in addition to safety requirements of US Army Corps of Engineers EM385-1-1 (latest edition), National Electric Codes (NEC), National Fire Protection Association (NFPA) Codes and Standards, Department of Defense (DoD) and Defense Logistics Agency (DLA) safety regulations must, at a minimum, be strictly adhered to by all contractors. After consultation with the contracting officer, the Installation’s Safety and Health Manager reserves the right to contact the OSHA, Norfolk District Office for assistance if there are frequent safety and health violations by contractors.
DLA Aviation Safety Specialists, Industrial Hygienists and COR/PM shall perform unannounced inspections of Contractor job sites to ensure compliance with applicable standards. Violations shall be reported to the Contracting Officer, or his/her authorized representative. The Safety Specialist, Industrial Hygienist and COR/PM reserves the right to stop operations when violations could cause any injury, death, and/or property damage. The Safety Specialist, Industrial Hygienist and COR/PM reserves the right to stop any activity where DSCR employees are impacted. Frequent safety violations shall be reported to the Virginia Occupational Safety and Health (VOSH) Office.
Safety is the responsibility of every person on DSCR. If anyone perceives a safety violation, they are authorized to stop the work associated with the perceived violation. Even if the contractor believes there is no violation, the contractor shall stop that work element and immediately inform the COR/PM and DSCR Safety Office to discuss the alleged violation with the reporting party. Once the Government and contractor agree there is no safety violation, or that safety violation is corrected the work element may continue. The contractor will not be compensated for any stoppage of work due to an alleged safety violation.
ATTACHMENT 3 ENVIRONMENTAL REQUIREMENTS
1. COMPLIANCE WITH ENVIRONMENTAL LAWS AND REGULATIONS
Contractor shall comply with all applicable federal, state, local, Defense Logistics Agency (DLA), and Defense Supply Center Richmond (DSCR) environmental laws, statutes, regulations, executive orders, permits. Contractor shall immediately report any conflicts between applicable federal, state, local, DLA and DSCR, and any specifications within this contract to the Contracting Officer Representative (COR) and the DLA Installation Management Richmond, Environmental Management Division.
2. COMPLIANCE WITH GREEN PROCUREMENT REQUIREMENTS
Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource- efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.
3. REPORTING NONCOMPLIANCE
Contractor shall immediately report any nonconformance and/or noncompliance with applicable federal, state, local, DLA and installation environmental regulations and laws to the COR and Environmental Management Division. Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has beentaken.
4. AWARENESS AND CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEM
DLA Installation Management Richmond currently maintains an ISO 14001 registered Environmental Management System. This system is applicable to those individuals working on our behalf. The Environmental Policy Statement and our List of Significant Aspects are available from the Environmental Management Division. Contractor personnel shall be aware of their potential contribution to the success of this Environmental Management System and the potential implications of not performing within its requirements. Contractor personnel shall be competent to perform the work specified within the contract. Contractor personnel shall also take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of environmental contamination, or can negatively affect the natural and/or human environment.
5. PROTECTION OF WORK SITE RESOURCES
Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Contractor shall notify the Environmental Management Division if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless the Environmental Management Division has granted permission.
6. NOTIFICATION OF FEDERAL AND STATE REGULATORS
Contractor shall immediately notify the COR and Environmental Management Division of the arrival on site of any federal, state, and/or Department of Defense (DoD) environmental regulator or enforcement agent and/or the receipt of any correspondence from a federal, state, and local environmental agency.
7. CULTURAL RESOURCES PROTECTION
a. This project has been identified as having the potential to affect a resource eligible for listing in the National Register of Historic Places.
b. In accordance with Section 106 of the National Historic Preservation Act, a Section 106 Review must be initiated to identify and assess any adverse effects that may result from this project. The contractor shall not begin fieldwork on the actual resource until the process is complete and documentation from the State Historic Preservation Office has been received stating either the project will not have an adverse effect on the historic resource or that any adverse effect has been mitigated. Administrative and planning efforts may proceed while the review process is occurring.
8. FEDERAL AND STATE LAND DISTURBING REQUIREMENTS
a. Any land disturbing activities with a footprint of greater than 5,000 square feet must satisfy Unified Facilities Criteria on Low Impact Development (UFC 3-210-10) requirements per Section 438 of the Energy Independence and Security Act as to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow. These requirements do not apply to internal renovations, maintenance, or resurfacing of existing pavements.
b. Land disturbance projects greater than 10,000 square feet are subject to Virginia Erosion and Sediment Control Regulations per 9VAC25-840. An Erosion and Sediment Control Plan must be submitted to the Virginia Department of Environmental Quality for approval prior to the start of any qualify disturbance activities. Exempt activities include: the installation of individual service connections; installation, maintenance, or repair of any underground public utility lines when such activity occurs on existing hard surfaced road, street, or sidewalk, provided the disturbing activity is confined to the area of the road, street, or sidewalk that is hard surfaced; septic tank lines or drainage fields; installation of fence/sign posts, telephone/electric poles, and other kinds of posts/poles; and emergency work to protect life, limb, or property, and emergency repairs.
c. Land disturbance projects greater than 1 acre are subject to Virginia Stormwater Management Program Regulations per 9VAC25-870. Stormwater Pollution Prevention Plans and applicable fees must be submitted to the Virginia Department of Environmental Quality for approval prior to the start of disturbance activities upon issuance of VAR10 permit coverage. Routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original construction is exempt from permit coverage.
9. COMPLIANCE WITH STORMWATER DISCHARGE REQUIREMENTS
The DSCR General Virginia Pollution Discharge Elimination System (VPDES) Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems (VAR040001) authorizes discharges of stormwater and authorized non-stormwater discharges. Authorized non-stormwater discharges are those detailed in 9VAC25-890-20 D. Such authorized non-stormwater discharges include those covered by a separate individual or general VPDES or state permit for non-stormwater discharges, individual non- stormwater discharges or flows that have been identified by the Virginia Department of Environmental Quality as de minimis and not significant sources of pollutants to surface waters and do not require a separate VPDES permit, and certain non-stormwater discharges identified by DSCR as not being significant contributors of pollutants, as detailed in Section 2.3.2 of the DSCR Stormwater Management Plan.
All other non-stormwater discharges are not authorized and must be covered under a separate VPDES permit.
10. SOLID WASTE REPORTING
Contractor shall report solid waste generation of Construction…