Attachment QASP.pdf

PDF 135 KB Posted

Attached to
Sole Source Posting Automated Fuel Service Station (AFSS) Corrective and Preventive Maintenance
Solicitation number
SP4702-21-R-0029
Issued by

View the file

Other files

File Type Posted
Attachment 3 Preventative Maintenance.pdf PDF
RFP SP4702-21-R-0029 v2.pdf PDF
Attachment 2 AFSS Maintenance.pdf PDF
AFSS PWS v2.pdf PDF
Attachment 1 FMU List.pdf PDF
Attachment 5 QASP.pdf PDF
Attachment 1 PWS.pdf PDF
RFP SP4702-21-R-0029.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP

CDRL Title Acceptable Quality Level (AQL) Method of Surveillance

A001 Technical/Analysis Reports, General

• All Site and Vendor Sign-Off Forms, Drawings signed by appropriate RO and uploaded into ITSM, with no requirements to return to the site

• All forms completed within prescribed timeframes

100% Inspection

A002 Inventory Tracking Report

• 100% accurate and timely reports delivered monthly on the 10th calendar day.

100% inspection

Attachment #5

A003 Contract Status Report (CSR)

• Completed activities

• Documents and tracks contractor and Government identified program risks, including a description of the risk, the date the risk is identified, the date the risk is updated, a rating of the consequence (low to high) and likelihood (low to high), and risk treatment strategy

• Costs Expended by CLIN.

• Staffing Plan and Training Status

• Areas requiring Governmental action

• Statistics/Metrics as defined by EPoS/AFSS PMO

• Planned activities and Monthly Preventive

Maintenance Schedule.

• All other areas identified covered per PWS 3.4.2

100% Inspection

A004 Contract Closeout Plan

• Must be delivered on time.

• Deliverable reflects knowledge and understanding of all requirements necessary to close out the contract, including government furnished equipment status, personnel closeout, and status.

100% Inspection

A005 Contract Closeout Report

• Reflects closeout, return and turnover of all equipment, status, and personnel access.

100% Inspection

A006 Invoice Support Documentation

• Materials contain required information and are delivered on time

• Revisions are minor (less than 5%) and are resolved in a satisfactory manner

Periodic Inspection

A010 Cost and Milestones Schedule Plan

• Includes a work breakdown structure (WBS) that shows

• tasks required to complete the work and the dependencies of each task for the contract. Materials contain required information and are delivered on time at least 90% of the time.

• Revisions are minor (less than 5%) and are resolved in a satisfactory manner

Periodic Inspection

A011 OCONUS

Deployment Package

• Materials contain required information and are delivered on time at least 90% of the time.

• Revisions are minor (less than 5%) and are resolved in a satisfactory manner

100% Inspection

File details come from the government source that posted it. Updated .