Solicitation_SP4702-19-R-0021.pdf
PDF 9 MB Posted
- Attached to
- Building Renovation and HVAC
- Solicitation number
- SP470219R0021
About this file
RFP- SP470219R0021
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
CODE 8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
SP4702-19-R-0021
DLA CONTRACTING SERVICES OFFICE, COLUMBUS
ATTN: DCSO-C
P. O. Box 3990 Columbus, OH 43218-3990
SEE TABLE OF CONTENTS PAGE 3 0F 233
DEFENSE SUPPLY CENTER, COLUMBUS
ATTN: DCSO-C
P. O. Box 3990 Columbus, OH 43218-3990 For Courier Services, offers must be address to:
3990 East Broad Street, Columbus, OH 43213-1152.
5. REQUISITION/PURCHASE REQUEST NUMBER
80050999
SP4702
a. NAME
Kristin Schoeck
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
614-692-0489
6. PROJECT NUMBER
CSC-19300
1 97407/19/2019 local time 08/19/2019
1:00 PM
(See Clause (FAR 52.211-10
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
TABLE OF CONTENTS
SECTION A. . . . . . . . . . Solicitation/Table of Contents – STANDARD FORM 1442
SECTION B. . . .. . . .. . . Supplies or Services and Prices/Costs
SECTION C. . . . . . . . . . Descriptions/Specifications/Performance Work Statement
SECTION D. . . . . . . . . . Packaging and Marking (Not Applicable). . . . . . . . . . . . . . . . . . . . . . . . N/A
SECTION E. . . . . . . . . . Inspection and Acceptance
SECTION F. . . . . . . . . . Deliveries or Performance
SECTION G. . . . . . . . . Contract Administration Data (Not Applicable). . . . . . . . . . . . . . . . . . . . N/A
SECTION H. . . . . . . . . Special Contract Requirements
SECTION I. . . . . . . . . . Contract Clauses
SECTION J. . . . . . . . . . List of Documents, Exhibits, and Other Attachments. . . . . . . . . . . . . . N/A
SECTION K. . . . . . . . . Representations, Certifications, and Other Statements of Offerors. . . 950
SECTION L. . . . . . . . . . Instructions, Conditions and Notices to Offerors
Attachment 1 DOL Wage Rate Determination (41 Pages)
Attachment 2 Eng. Form 93 (2 Pages)
Attachment 3 Eng. Form 4025-R (2 Pages)
Attachment 4 Drawing 3-1691 (50 sheets)
Attachment 5 Construction Cost Estimate/Bid Form (1 Page)
SECTION M . . . . . . . . . Evaluation Factors
DKS0094
Cross-Out
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION OF SERVICES
The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-19300 Building 308 Renovations and HVAC) , contract drawing No. 3-1691 (50 sheets), complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project.
TERM OF CONTRACT
The period of performance for this project is 540 calendar days after the issuance of the Notice to
Proceed.
OFFER FOR SERVICES
CONRACT
LINE TEM
NO.(CLIN)
SUPPLIES/SERVICES QUANTITY UNIT TOTAL AMOUNT
0001 CSC-19300 Building 308
Renovations and HVAC, FY19
1 JOB $
ALL CLIN PRICING SHALL BE INCLUSIVE OF OVERHEAD, PROFIT AND BONDING
COSTS
When invoicing in Wide Area Work Flow, reverse the quantity and unit price as shown above on each CLIN. Failure to do so will result in a delay in payment of the invoice as the invoice will have to be rejected and resubmitted. If you have any questions regarding this matter, contact your
WAWF representative Matt Foreman at 614-692-1050 or matthew.foreman@dla.mil.
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
The text of any referenced FAR, DFARS, or DLAD clause/provision may be obtained electronically at http://farsite.hill.af.mil (DLA Procurement Regulations). The complete edition of Federal Acquisition Regulations (FAR) or DoD FAR Supplement (DFARS) may be obtained by purchase from the Superintendent of Documents, Government Printing Office, Washington, DC 20402.
The clauses/provisions incorporated by reference have the same force and effect as if they were in full text; however, those having no bearing on the instant acquisition become self-deleting.
MAGNITUDE OF THIS CONSTRUCTION PROJECT IN TERMS OF ESTIMATED COST:
( ) This Project is estimated less than $25,000.
( ) This Project is estimated between $25,000 and $100,000.
( ) This Project is estimated between $100,000 and $250,000 .
( ) This Project is estimated between $250,000 and $500,000 .
( ) This Project is estimated between $500,000 and $1,000,000 .
(X) This Project is estimated between $1,000,000 and $5,000,000 .
( ) This Project is estimated between $5,000,000 and $10,000,000.
( ) More than $10,000,000.
DESCRIPTION OF WORK:
The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-19300 Building 308 Renovations and HVAC) , contract drawing No. 3-1691 (50 sheets), complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project.
NOTE: While the Government currently intends to purchase the requirements sought in this solicitation, it may nevertheless be canceled in the event of spending cutbacks necessitated by passage of the Balanced Budget and Emergency Deficit Control Act of 1985, P.L.99-177.
NOTICE: Any contract awarded to a contractor who, at the time of award was suspended, debarred, and ineligible for receipt of contracts with government agencies or in receipt of a notice of proposed debarment from any government agency, is voidable at the option of the Government.
(The following is applicable when marked with an "X".)
(X) Wage Rate Decision OH180002 05/03/2019 No. of Pages 41 (attached).
Common Access Card (CAC) Procedures
Performance under this contract may require the contractor to obtain a Common Access Card (CAC). If CACs are issued under this contract, the contractor shall complete and comply with the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish procedures to control and account for contractor CACs at all times. This process is only for the issuance and accountability of CACs. Contractors may be required to provide additional forms and follow additional procedures for other forms of access and/or background/security checks depending on local site/installation requirements.
1. The contractor has each contractor employee requiring a CAC complete and sign Sections I and II of the DD Form 1172-2. The instructions for completing the DD Form 1172-2 are located at http://www.cac.mil/docs/1172-2-Instructions.pdf.
o For Section II, Block 22 - If the contractor employee signs and the DD Form 1172-2 it is then forwarded by the contractor. This provides verification for the employee information. If the contractor is submitting a DD Form 1172-2 for him/herself (e.g., the owner), with no higher authority above them for verification, then the signature in Block 22 must be notarized to verify identity.
2. The contractor forwards the DD Form(s) 1172-2 via hand-carry, secure mail, or encrypted email to (NOTE: The contractor may forward these forms individually or as a group):
O The Contracting Officer’s Representative (COR) for the contract, if a COR was designated.
O The Contracting Officer (CO) for the contract, if no COR was designated.
3. Each contractor employee must verify his/her account information upon receipt of an email from the Government containing a username and password for the Trusted Associate Sponsorship System (TASS). The web link for TASS is included in the email.
4. Each contractor employee will receive an email via TASS when his/her account has been approved. The email will notify the employee to obtain a Government-issued CAC from the nearest Real-Time Automated Personnel Identification System (RAPIDS) office. The email will also provide a link that identifies the locations of RAPIDS offices.
5. Each contractor employee shall obtain his/her issued CAC from the RAPIDS office.
6. The contractor, within one (1) business day of issuance, provides written notice via email to the COR (or the CO, if no COR was designated) for each contractor CAC issued identifying the contractor employee’s name, the date of issuance, and the date of expiration of the CAC. This notification may be made individually for each contractor employee or together for a group of contractor employees.
7. The contractor establishes procedures to control and account for Government-issued contractor CACs at all times, to include the following:
O Ensure contractor CACs issued for this contract are only used for the purpose of performing under this contract.
O Ensure contractor CACs are secured in a manner that precludes unauthorized use and that recognizes the CAC is the property of the U.S. Government.
O Ensure contractor employees do not abuse or place holes in their CACs.
O Ensure contractor employees do not display their CACs in public.
8. If a contractor CAC is lost or stolen:
o The contractor employee shall immediately notify the contractor that the contractor CAC has been lost or stolen.
o The contractor shall immediately notify the COR (or the CO, if no COR was designated), detailing the circumstances regarding the lost or stolen contractor CAC, as follows:
• In person, followed within one (1) business day by a written notice via email, or
• In writing, via email, or
• By telephone, followed within one (1) business day by a written notice via email.
o The contractor shall report the lost or stolen CAC card to the local DLA
Police/host installation police, who will provide the contractor a police report. If there is no local DLA Police/host installation police, or no police report is provided, the contractor shall provide information to the COR/CO, as applicable, detailing the circumstances of how the CAC was lost or stolen. The COR/CO will provide a memorandum for the contractor employee to support issuance of new CAC.
o The contractor has the contractor employee bring the report/memorandum to the nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the report/memorandum to the nearest CAC office for reissue. If the CAC cannot be reissued in 24 hours, follow the steps for a new CAC, beginning at Step 1.
9. If the expiration date for a contractor CAC is prior to completion of the contract and the contractor employee is to continue working under the contract and still requires a CAC, the contractor:
o Notifies the COR as follows:
• In person, followed within one (1) business day by a written notice via email, or
• In writing, via email, or
• By telephone, followed within one (1) business day by a written notice via email o No less than two (2) weeks prior to the current CAC’s expiration date, completes and complies with the steps above beginning with Step 2 for issuance of a new contractor CAC for the employee.
o Brings the expiring CAC to the RAPIDS office for turn-in and receives new CAC.
o Notifies the COR once a new CAC has been issued.
10. The contractor/contractor employee turns in any found CACs immediately, via handcarry, to the nearest Federal law enforcement office.
11. The contractor immediately collects all contractor CAC(s) from the contractor employee(s) at:
o Contract completion or termination o Termination/Reassignment of an employee (this includes any reason the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC)
12. The contractor:
o For contract completion or termination – within one (1) business day after collecting the contractor CAC(s), arranges for turn-in via one of the below methods:
i. If the COR/CO is co-located or near enough that in-person transfer of CACs can be arranged, the contractor:
• Arranges to meet the COR (or the CO, if no COR was designated) to turn-in the collected contractor CAC(s).
• Hand-carries all collected contractor CACs for turn-in to meet the
COR (or the CO, if no COR was designated).
• Completes and signs the Government-Issued Contractor CAC
Turn-In Receipt with the COR (or the CO, if no COR was designated). The contractor is provided a copy of the receipt.
ii. If in-person transfer of CAC cannot be arranged, the contractor:
• Sends, via certified mail, the CACs to the COR/CO. The contractor includes in the package the Government-Issued Contractor CAC Turn-In Receipt, with signed acknowledgement of contractor turn-in.
• Notifies COR/CO that CACs have been sent via certified mail.
• Receives a completed copy of the receipt from the COR/CO once the COR/CO has received the CACs.
o For termination/reassignment of an employee:
i. Immediately notifies the COR (or the CO, if no COR was designated) that the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC, as follows:
• In person, followed within one (1) business day by a written notice via email, or
• In writing, via email, or
• By telephone, followed within one (1) business day by a written notice via email.
ii. Follows the turn-in procedures above for contract completion or termination, as applicable.
Contractor Reporting Requirements: The contractor is required to submit, on a monthly basis, to the COR (or the CO, if no COR was designated) a report of all employees working on the contract who have been issued CAC cards and a verification of whether each listed employee still requires a CAC. The report must note where changes have occurred (additions or deletions) since the previous month. Contractor employees who already have a CAC related to another DLA or DoD contract must be included in the monthly report. Contractor shall note the issuing organization and the CAC expiration date. Contractor is still responsible for notifying the COR/CO when the individual is no longer working under the subject contract.
The above procedures have been established as a DLA security measure. Contractors are advised that failure to comply with any of the above requirements will be considered a violation of the terms and conditions of the contract and the Contracting Officer may take action to remedy such violations. Specifically, failure to safeguard, follow these procedures, including reporting requirements, or turn-in CACs within the established timeframes may result in the following actions, which are in addition to other actions the Contracting Officer may take under governing law and regulation and the terms and conditions of the contract:
• Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution of CAC issue
• Disapproval of invoices and delay of payment
• Withholding of final payment (in accordance with FAR 52.204-9)
• Documentation of CAC Non-Compliance in the Contractor Performance Assessment
Reporting System (CPARS)
STATEMENT OF WORK
CSC-19300
DS-FCI ENGINEERING PROJECT DATA SHEET
PROJECT CSC #: CSC-19300
PROJECT NAME: Building 308 Improvements
PROJECT LOCATION(S): Building 308
CUSTOMER: DSCC
PROJECT TYPE: Maintenance & Repair
CURRENT SITUATION:
Building 308 is 51,000 square foot and is the location of base facility engineering division. It a combination of office space and warehouse space. The 10,500 square foot west office area has not been up dated since 2000. The space no longer fits the requirements of the occupants. The chiller is at the end of its serviceable life and is need of replacement. The boiler for the building is oversized and is getting to the end of its serviceable. Insulation on existing steam supply lines have asbestos insulation and has the potential to be a hazard.
REGULATORY REQUIREMENTS:
DSCC is required to provide the same high quality level of operations for buildings to our military and civilian customers who work at DSCC. Building 308 shall be maintained in good condition to meet the regulatory requirements.
Executive Order 13693 Planning for Federal Sustainability in the Next Decade requires Federal agencies to reduce building energy intensity measured in British thermal units per gross square foot by 2.5 percent annually through the end of fiscal year 2025, relative to the baseline of the agency's building energy use in fiscal year 2015.
The UFC 3-410-01FA states that warehouse space shall be kept at 55F.
SCOPE OF WORK:
This project involves the renovations of the west office space in Building 308 and the replacement of the steam heating system for the entire building.
A 10,500 SF office area in Bldg. 308 will be fully demolished including all carpet, ceiling, HVAC and lighting. This area will be renovated to include painting, new offices, new breakroom, new carpeting, new ceiling system, new HVAC systems (40 ton chiller, dry cooler,
(2) AHU’s, (17) VAV’s) and new lighting system. Systems will be tested balanced and commissioned after installation.
The steam replacement will include the demo of existing boiler and steam piping throughout the building. Asbestos on pipe insulation will be abated. After demolition 3 new condensing boilers, pumps and hot water piping will be installed.
See Section 01 50 03 General Requirements Scope of Work.
SCOPE OF WORK
FOR
BUILDING 308 IMPROVEMENTS
PROJECT CSC-19300
DEFENSE SUPPLY CENTER COLUMBUS
3990 EAST BROAD STREET
COLUMBUS, OHIO 43216-5000
MAY 2019
Section 01 20 00.00 20 Section 01 32 16.00 20 Section 01 33 00 Section 01 35 26 Section 01 35 31 Section 01 42 00 Section 01 45 00.1020 Section 01 50 03 Section 01 57 19 Section 01 62 35 Section 01 74 19 Section 01 78 00 Section 01 78 23 Section 01 91 00.15 10 Section 01 93 00
TABLE OF CONTENTS
DIVISION 01
Price and Payment Procedures Small Project Construction Progress Schedules Submittal Procedures Governmental Safety Requirements Safety, Security, and Fire Provisions Sources for Reference Publications Quality Control for Minor Construction General Requirements and Scope of Work Temporary Environmental Controls Recycled Recovered Materials Construction and Demolition Waste Management Closeout Submittals Operation and Maintenance Data Total Building Commissioning Submittals
Section 02 41 00 Section 02 42 51 Section 02 81 00 Section 02 82 00 10
DIVISION 02
Demolition and Deconstruction Carpet Removal and Reclamation Transportation and Disposal of Hazardous Materials Removal And Disposal Of Asbestos Containing Materials
Section 03 30 00 Section 03 30 53
DIVISION 03
Cast-In-Place Concrete Miscellaneous Cast-In-Place Concrete
Section 04 20 00
DIVISION 04
Unit Masonry
Section 05 40 00
DIVISION 05
Cold-Formed Metal Framing
Section 06 10 00 Section 06 61 16
DIVISION 06
Rough Carpentry Solid Polymer (Solid Surfacing) Fabrications
Section 07 84 00 Section 07 92 00
DIVISION 07
Fire stopping Joint Sealants
Section 08 11 13 Section 08 41 13 Section 08 51 13 Section 08 71 00
DIVISION 08
Steel Doors and Frames Aluminum-Framed Entrances and Storefronts Aluminum Windows Door Hardware
Section 09 29 00 Section 09 51 00 Section 09 65 00 Section 09 68 00 Section 09 72 00 Section 09 90 00
DIVISION 09
Gypsum Board Acoustical Ceilings Resilient Flooring Carpeting Wallcoverings Paints and Coatings
Section 10 21 13 Section 10 28 13
DIVISION 10
Toilet Compartments Toilet Accessories
Section 21 13 13.00 10
DIVISION 21
Wet Pipe Sprinkler System, Fire Protection
Section 22 00 00
DIVISION 22
Plumbing, General Purpose
23 00 00 23 05 93 23 07 00 23 09 00 23 09 13 23 09 23.02
23 21 13.00 20 23 52 43.00 20
23 64 10 23 64 26
DIVISION 23
Air Supply, Distribution, Ventilation, And Exhaust Systems Testing, Adjusting, And Balancing For HVAC Thermal Insulation For Mechanical Systems Instrumentation And Control For HVAC Instrumentation And Control Devices For HVAC BacNET Direct Digital Control For HVAC And Other Building Controls Low Temperature Water (LTW) Heating System Low Pressure Water Heating Boilers (Under 800,000 Btu/Hr Output) Water Chillers, Vapor Compression Type Chilled, Chilled-Hot, And Condenser Water Piping Systems
26 00 00.00 20 26 05 00.00 40 26 20 00 26 51 00.00 40 26 52 00.00 40
DIVISION 26
Basic Electrical Materials And Methods Common Work Results For Electrical Interior Distribution System Interior Lighting Emergency Lighting
Section 01 20 00.00 20 Page 1 of 5 6/19/2019
SECTION TABLE OF CONTENTS
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
08/16
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SCHEDULE OF VALUES
1.3.1 Data Required
1.3.2 Schedule Instructions
1.4 CONTRACT MODIFICATIONS
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
1.5.2 Submission of Invoices
1.5.3 Final Invoice
1.6 PAYMENTS TO THE CONTRACTOR
1.6.1 Obligation of Government Payments
1.6.2 Payment for Onsite Materials
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
Section 01 20 00.00 20 Page 2 of 5 6/19/2019
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP-1110-1-8 (2009) Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Schedule of Values; G
1.3 SCHEDULE OF VALUES
1.3.1 Data Required
Within 14 calendar days of notice to proceed, prepare and deliver to the
Contracting Officer a Schedule of Values (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.
1.3.2 Schedule Instructions
Payments will not be made until the Schedule of Values has been submitted to and accepted by the Contracting Officer.
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause "DFARS 252.236-7000, Modification
Proposals-Price Breakdown," and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the EP-1110-1-8.
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract
Section 01 20 00.00 20 Page 3 of 5 6/19/2019
Clause FAR 52.232-27, Prompt Payment Construction Contracts and FAR
52.232-5, Payments Under Fixed-Price Construction Contracts. The requests for payment shall include the documents listed below.
a. The Contractor's invoice, on ENG Form 93, showing in summary form, the basis for arriving at the amount of the invoice. ENG Form 93 shall include certification by Quality Control (QC) Manager as required by the contract. This form may be provided upon request or is available at the USACE Publications website:
http://www.publications.usace.army.mil/Portals/76/Publications/Eng ineerForms/Eng_Form_93_2014Mar.pdf
b. The Payment Estimate for Contract Performance showing in detail:
the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract
c. Updated Project Schedule and reports required by the contract.
d. Other supporting documents as requested.
e. Updated copy of submittal register.
f. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.
g. Materials on Site.
h. Monthly Work-hour report.
i. Solid Waste Disposal Report.
1.5.2 Submission of Invoices
If DFARS Clause 252.232-7003 is included in the contract, the documents listed in paragraph "CONTENT OF INVOICE" shall be provided in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction it shall be provided as instructed by the Contracting Officer.
1.5.3 Final Invoice
a. A final invoice shall be accompanied by the Contractor's Final
Release. If the Contractor is incorporated, the Final Release shall contain the corporate seal. An officer of the corporation shall sign and the corporate secretary shall certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's
Final Release must be provided directly to the respective Contracting
Officer prior to submission of the final invoice. Once receipt of the original Final Release has been confirmed by the Contracting Officer, the Contractor shall then submit final invoice and attach a copy of the
Final Release in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release will be considered incomplete and will be returned to the Contractor.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_93_2014Mar.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_93_2014Mar.pdf
Section 01 20 00.00 20 Page 4 of 5 6/19/2019
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.6.3 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this contract will, at the discretion of the Contracting
Officer, be subject to reductions and/or suspensions permitted under the
FAR and agency regulations:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this contract;
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to provide up to date record drawings not current.
1.6.4 Payment for Onsite Materials
Progress payments may be made to the contractor for materials delivered on the site under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, shall be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation shall be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Values requirement of this contract.
Requests for progress payment consideration for such items shall be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 have been met.
d. Materials are adequately insured and protected from theft and exposure.
PART 2 PRODUCTS
Not Used
Section 01 20 00.00 20 Page 5 of 5 6/19/2019
PART 3 EXECUTION
-- End of Section --
SECTION 01 32 16.00 20 Page 1
SECTION TABLE OF CONTENTS DIVISION
01 - GENERAL REQUIREMENTS
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
05/19
1.1 SUBMITTALS
1.2 ACCEPTANCE
1.3 SCHEDULE FORMAT
1.3.1 Bar Chart Schedule
1.3.2 Schedule Submittals and Procedures
1.4 SCHEDULE MONTHLY UPDATES
1.5 3-WEEK LOOK AHEAD SCHEDULE
1.6 CORRESPONDENCE AND TEST REPORTS:
1.7 ADDITIONAL SCHEDULING REQUIREMENTS
SECTION 01 32 16.00 20 Page 2
SECTION 01 32 16.00 20
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
05/19
1.1 SUBMITTALS
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
Construction Schedule; G
SD-07 Certificates
Monthly Updates
1.2 ACCEPTANCE
Prior to the start of work, prepare and submit to the Contracting Officer for acceptance a construction schedule in the form of a Bar Chart Schedule in accordance with the terms in Contract Clause "FAR 52.236-15, Schedules for Construction Contracts," except as modified in this contract.
The acceptance of a Baseline Construction Schedule is a condition precedent to:
a. The Contractor starting work on the demolition or construction stage(s) of the contract.
b. Processing Contractor's invoice(s) for construction activities/items of work.
c. Review of any schedule updates.
Submittal of the Baseline Schedule, and subsequent schedule updates, is understood to be the Contractor's certification that the submitted schedule meets all of the requirements of the Contract Documents, represents the
Contractor's plan on how the work will be accomplished, and accurately reflects the work that has been accomplished and how it was sequenced (as-built logic).
1.3 SCHEDULE FORMAT
1.3.1 Bar Chart Schedule
The Bar Chart must, as a minimum, show work activities, submittals, Government review periods, material/equipment delivery, utility outages, on-site construction, inspection, testing, and closeout activities. The
Bar Chart must be time scaled and generated using an electronic spreadsheet program.
1.3.2 Schedule Submittals and Procedures
Submit Bar Chart Schedules and updates in hard copy and on electronic media
SECTION 01 32 16.00 20 Page 3 that is acceptable to the Contracting Officer. Submit an electronic back-up of the project schedule in an import format compatible with the Government's scheduling program.
1.4 SCHEDULE MONTHLY UPDATES
Update the Construction Schedule at monthly intervals or when the schedule has been revised. The updated schedule must be kept current, reflecting actual activity progress and plan for completing the remaining work. Submit copies of purchase orders and confirmation of delivery dates as directed by the Contracting Officer.
a. Narrative Report: Provide with schedule updates. Identify and justify;
(1) Progress made in each area of the project
(2) Critical Path
(3) Date/time constraint(s), other than those required by the contract
(4) Changes in the following; added or deleted activities, original and remaining durations for activities that have not started, logic, milestones, planned sequence of operations, and critical path
(5) Status of Contract Completion Date and interim milestones;
(6) Current and anticipated delays (describe cause of delay and corrective actions(s) and mitigation measures to minimize);
(7) Description of current and future schedule problem areas.
Each entry in the narrative report must cite the respective Activity ID and
Activity Description, the date and reason for the change, and description of the change.
1.5 3-WEEK LOOK AHEAD SCHEDULE
Prepare and issue a 3-Week Look Ahead schedule to provide a more detailed day-to-day plan of upcoming work identified on the Construction Schedule.
Additionally, include upcoming outages, closures, preparatory meetings, and initial meetings. Identify critical path activities on the Three-Week Look
Ahead Schedule. The detail work plans are to be bar chart type schedules, maintained separately from the Construction Schedule on an electronic spreadsheet program and printed on 8-1/2 by 11 inch sheets as directed by the Contracting Officer. Activities must not exceed 5 working days in duration and have sufficient level of detail to assign crews, tools and equipment required to complete the work. Deliver three hard copies and one electronic file of the 3-Week Look Ahead Schedule to the Contracting Officer no later than 8 a.m. each Monday, and review during the weekly CQC
Coordination or Production Meeting.
1.6 CORRESPONDENCE AND TEST REPORTS:
All correspondence (e.g., letters, Requests for Information (RFIs), e-mails, meeting minute items, Production and QC Daily Reports, material delivery tickets, photographs) must reference Schedule Activities that are being addressed. All test reports (e.g., concrete, soil compaction, weld, pressure) must reference Schedule Activities that are being addressed.
SECTION 01 32 16.00 20 Page 4
1.7 ADDITIONAL SCHEDULING REQUIREMENTS
Any references to additional scheduling requirements, including systems to be inspected, tested and commissioned, that are located throughout the remainder of the Contract Documents, are subject to all requirements of this section.
Not used.
Not used.
Section 01 33 00 Page 1 of 19 6/19/2019
SECTION 01 33 00
SUBMITTAL PROCEDURES
02/16
1.1 SUMMARY
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.3 SUBMITTALS
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Government Approved (GA)
1.4.2 For Information Only
1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL
1.5.1 Submittals Required from the Contractor
1.5.1.1 O&M Data
1.6 PREPARATION
1.6.1 Transmittal Form
1.6.2 Identifying Submittals
1.6.3 Format for SD-02 Shop Drawings
1.6.4 Format of SD-03 Product Data and SD-08 Manufacturer's
Instructions
1.6.5 Format of SD-04 Samples
1.6.6 Format of SD-05 Design Data and SD-07 Certificates
1.6.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field
Reports
1.6.8 Format of SD-10 Operation and Maintenance Data (O&M)
1.6.9 Format of SD-01 Preconstruction Submittals and SD-11 Closeout
Submittals
1.6.10 Source Drawings for Shop Drawings
1.6.10.1 Terms and Conditions
1.6.11 Electronic File Format
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
1.7.2 Number of Copies of SD-03 Product Data and SD-08
Manufacturer's Instructions
1.7.3 Number of Samples SD-04 Samples
1.7.4 Number of Copies SD-05 Design Data and SD-07 Certificates
1.7.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's
Field Reports
1.7.6 Number of Copies of SD-10 Operation and Maintenance Data
1.7.7 Number of Copies of SD-01 Preconstruction Submittals and SD-11
Closeout Submittals
1.8 INFORMATION ONLY SUBMITTALS
1.9 VARIATIONS
1.9.1 Considering Variations
1.9.2 Proposing Variations
1.9.3 Warranting that Variations are Compatible
1.9.4 Review Schedule is Modified
1.10 SUBMITTAL REGISTER AND DATABASE
1.10.1 Use of Submittal Register
1.10.2 Contractor Use of Submittal Register
1.10.3 Action Codes
1.10.3.1 Government Review Action Codes
1.10.3.2 Contractor Action Codes
Section 01 33 00 Page 2 of 19 6/19/2019
1.10.4 Copies Delivered to the Government
1.11 SCHEDULING
1.11.1 Constraints
1.12 GOVERNMENT APPROVING AUTHORITY
1.12.1 Review Notations
1.13 DISAPPROVED SUBMITTALS
1.14 APPROVED SUBMITTALS
1.15 APPROVED SAMPLES
1.16 WITHHOLDING OF PAYMENT
1.17 PROGRESS SCHEDULE
1.17.1 Bar Chart
1.18 STATUS REPORT ON MATERIALS ORDERS
Section 01 33 00 Page 3 of 19 6/19/2019
SECTION 01 33 00
SUBMITTAL PROCEDURES
02/16
1.1 SUMMARY
The engineering representative may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager and the Designer of
Record, if applicable, to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited
to) catalog cuts, diagrams, operating charts or curves; test reports;
test cylinders; samples; O&M manuals (including parts list);
certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby.
Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
A submittal register showing items of equipment and materials for when submittals are required by the specifications is provided as "Appendix A
- Submittal Register".
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
Submittals which are required prior to start of construction (work), commencing work on site or the start of the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates of insurance
Surety bonds
Section 01 33 00 Page 4 of 19 6/19/2019
List of proposed Subcontractors
List of proposed products
Construction progress schedule
Submittal register
Schedule of values
Health and safety plan
Work plan
Contractor Quality Control (CQC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
Design submittals, design substantiation submittals and extensions of design submittals.
Section 01 33 00 Page 5 of 19 6/19/2019
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS) concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
Section 01 33 00 Page 6 of 19 6/19/2019
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third
Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
1.2.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.3 SUBMITTALS
submittals not having a "G" designation are for Contractor QC approval.
Submit the following in accordance with this section.
Submittal Register; G
1.4 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.4.1 Government Approved (GA)
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting
Officer. Government approval is required for any deviations from the
Solicitation or Accepted Proposal and other items as designated by the
Contracting Officer. Within the terms of the Contract Clause
SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are considered to be
Section 01 33 00 Page 7 of 19 6/19/2019
"shop drawings."
1.4.2 For Information Only (FIO)
Submittals not requiring Government approval will be for information only. For
Design-build construction all submittals not requiring Designer of Record or
Government approval will be for information only. They are not considered to be
"shop drawings" within the terms of the Contract Clause referred to above.
1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL
1.5.1 Submittals Required from the Contractor
As soon as practicable after award of contract, and before procurement of fabrication, forward to the engineering and the contracting offices submittals required in the technical sections of this specification, including shop drawings, product data and samples.
The engineering representative will review and approve for the Contracting
Officer those submittals reserved for Contracting Officer approval to verify submittals comply with the contract requirements.
1.5.1.1 O&M Data
The Facility Engineering Representative will review and approve for the
Contracting Officer O&M Data to verify the submittals comply with the contract requirements; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.
1.6 PREPARATION
1.6.1 Transmittal Form
Use the transmittal form ENG Form 4025-R for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. This form may be provided upon request or is available at the USACE Publications website:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerF orms/Eng_Form_4025-R.pdf
Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.6.2 Identifying Submittals
When submittals are provided by a Subcontractor, the Prime Contractor is to prepare, review and stamp with Contractor's approval all specified submittals prior to submitting for Government approval.
Identify submittals, except sample installations and sample panels, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_4025-R.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_4025-R.pdf
Section 01 33 00 Page 8 of 19 6/19/2019
a. Project title and location.
b. Construction contract…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.