CSC-19300 Building 308 Improvements

3-1691 Drawing Revision Notes:

G-001 - was updated to reflect the addition of sheet G-003 Environmental Notes.

G-002 - was updated to reflect current codes per the Fire Department and Physical Security Review.

General Note #16 – Added note

Fire Protection Note #6 – Building 306 was changed to Building 308

Fire Protection Note #7 – Added the requirement for submittals to be signed by a QFPE.

Fire Protection Note #11 – Added UFC 3-600-01 as an install requirement.

Special Note #5, #7 – Changed code editions and/or version years to “CURRENT EDITION”

Special Note #16 – Added note

G-003 - was created to include comments from the Environmental Department in their entirety.

M-001 - Added to drawing set.

M-110 - Expansion loops added to piping

M-111 - Expansion loops added to piping; Gas piping and make up water piping added for boiler

M-112 - Expansion loops added to piping

M-113 - Expansion loops added to piping

M-501 - Transfer air duct detail added to drawing

M-602 – Expansion Tank Schedule, Unit Heater Schedule and Fin Tube Heater Schedule all updated

M-603 – Air Device Schedule updated

M-606 – Hot water sequence of operation, point list updated

M-607 – AHU-1 sequence of operation, point list and schematic updated

M-608 – DOAS-1 sequence of operation, point list and schematic updated

M-609 – East Office AHU sequence of operation, point list and schematic updated

M-611 – Air Curtain sequence of operation, point list and schematic added

Sheet ED-102 – Power devices were not visible on original PDF, drawing revised to show the power devices on plan.

Sheet E-102 - Power devices were not visible on original PDF, drawing revised to show the power devices on plan.

Sheet E-601 – Lighting fixture schedule did not show symbols on original PDF, drawing revised to make symbols visible on the schedule.