3-1689_-_19001_-__SHT_4_OF_5_-_Repair_Exterior_and_Interior_Vestibule_Entrance_Doors,_Bldg._20,_FY19-SHT__4.pdf
PDF 559 KB Posted
- Attached to
- CSC-19001 Replace Entrance Doors
- Solicitation number
- SP4702-19-R-0009
- Issued by
-
Defense Logistics Agency
About this file
Revised Drawing 3-1689 Sheet 4
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
FOR EXTERIOR DOORS - FORMED OF TWO PIECES OF CLEAR TEMPERED
AutoCAD SHX Text CONDITION A, TYPE I, CLASS 1, QUALITY q8, 0.25 INCH THICK; TOTAL
AutoCAD SHX Text
THICKNESS = 1" AND GANA STANDARDS MANUAL DESIGNATION ON THE
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text CONDITION A, TYPE I, CLASS 1, QUALITY q8, 0.25 INCH THICK AND GENA
AutoCAD SHX Text
STANDARDS MANUAL DESIGNATION ON THE DRAWING SHEET IS G/10.
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FOR INTERIOR DOORS - ASTM C 1048, KIND FT (FULLY TEMPERED),
AutoCAD SHX Text
GLASS CONFORMING TO ASTM C 1048, KIND FT (FULLY TEMPERED),
AutoCAD SHX Text
DRAWING SHEET IS G/9.
AutoCAD SHX Text
%%UGLASS TYPES
AutoCAD SHX Text
SECTION D
AutoCAD SHX Text D
AutoCAD SHX Text
SECTION A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text
SECTION B
AutoCAD SHX Text
SECTION C
AutoCAD SHX Text
HEAD
AutoCAD SHX Text
STILE
AutoCAD SHX Text
SILL
AutoCAD SHX Text
SECTION E
AutoCAD SHX Text
JAMB
AutoCAD SHX Text E
AutoCAD SHX Text
MIDDLE RAIL
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
INTERIOR
AutoCAD SHX Text G
AutoCAD SHX Text
EXTERIOR
AutoCAD SHX Text
DOORS
AutoCAD SHX Text
SEE DETAIL B/4 ON
AutoCAD SHX Text
AutoCAD SHX Text
THIS SHEET.
AutoCAD SHX Text
TOP OF DOOR FRAME 2 " 12"
AutoCAD SHX Text
DOOR FRAME
AutoCAD SHX Text
SEE DETAIL C/4
AutoCAD SHX Text
DOOR
AutoCAD SHX Text
FRAME
AutoCAD SHX Text
SIDE OF DOOR FRAME 2 " 12"
AutoCAD SHX Text
ON THIS SHEET
AutoCAD SHX Text FOR (2) INTERIOR DOORS B137NB AND B138NB - STAINLESS STEEL WITH G/10 GLASS TYPE AS INDICATED ON THIS SHEET.
AutoCAD SHX Text
AND MAIN VESTIBULE ENTRANCE AREAS AS INDICATED ON SHEET. 2 OF 5.
AutoCAD SHX Text A. BLDG. 20 - FOR (2) EXTERIOR DOORS - B137NA AND B138NA - STAINLESS STEEL WITH G/9 GLASS TYPE AS INDICATED ON THIS SHEET.
AutoCAD SHX Text
(4) TOTAL S.S. MONUMENTAL WIDE STILE DOORS TO BE INSTALLED AT POD B MAIN LOBBY
AutoCAD SHX Text
%%UBLDG. 20 NOTES
AutoCAD SHX Text
FRAMES ARE TO BE KYNAR FINISH TO MATCH VESTIBULE AND KITCHEN WALLS.
AutoCAD SHX Text
B. BLDG. 20 - ALL OTHER MONUMENTAL WIDE STILE DOORS LISTED IN THE DOOR
AutoCAD SHX Text
SCHEDULE ON SHEET 2 OF 5 ARE TO BE ALUMINUM DOORS AND FRAMES. DOORS AND
AutoCAD SHX Text
%%UBLDG. 21 NOTES
AutoCAD SHX Text
AND FRAMES ARE TO BE KYNAR FINISH TO MATCH VESTIBULE WALLS.
AutoCAD SHX Text
A. BLDG. 21 - ALL (11) EXTERIOR MONUMENTAL WIDE STILE DOORS LISTED IN THE DOOR
AutoCAD SHX Text SCHEDULE ON SHEET 3 OF 5 ARE TO BE ALUMINUM DOORS AND FRAMES WITH G/9 GLASS TYPE AS INDICATED ON THIS SHEET. DOORS
AutoCAD SHX Text
1. ALUMINUM FRAME
AutoCAD SHX Text
WITH KYNAR FINISH
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
DOOR FRAME SEE NOTE 1
AutoCAD SHX Text
DOOR FRAME SEE NOTE 1
AutoCAD SHX Text
DLA ENTERPRISE SUPPORT
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text Approved by:
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Sheet
AutoCAD SHX Text reference
AutoCAD SHX Text number:
AutoCAD SHX Text Description
AutoCAD SHX Text Date
AutoCAD SHX Text Appr.
AutoCAD SHX Text Mark
AutoCAD SHX Text
DEFENSE LOGISTICS AGENCY
AutoCAD SHX Text
DEFENSE SUPPLY CENTER COLUMBUS
AutoCAD SHX Text
COLUMBUS, OHIO 43218-3990
AutoCAD SHX Text
FACILITIES ENGINEERING OFFICE
AutoCAD SHX Text
BUILDING 308
AutoCAD SHX Text
INSTALLATION MANAGEMENT DIVISION
AutoCAD SHX Text Reviewed by:
AutoCAD SHX Text Reviewed by:
AutoCAD SHX Text Date:
AutoCAD SHX Text Date:
AutoCAD SHX Text Date:
AutoCAD SHX Text Date:
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
CSC-19001
AutoCAD SHX Text
REPLACE EXTERIOR ENTRANCE DOORS,
AutoCAD SHX Text 3-1689
AutoCAD SHX Text
AutoCAD SHX Text
GARY JOHNSON
AutoCAD SHX Text
M. RUSTAM ALI
AutoCAD SHX Text
DF-FCO (SAFETY)
AutoCAD SHX Text
FACILITIES ENGINEER
AutoCAD SHX Text
DF-FCS (SECURITY)
AutoCAD SHX Text Approved by:
AutoCAD SHX Text
DF-FCE (ENVIRONMENTAL)
AutoCAD SHX Text Date:
AutoCAD SHX Text Plot Date:
AutoCAD SHX Text Date:
AutoCAD SHX Text
PROJECT COORDINATE
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
ENGINEERING TECHNICIAN
AutoCAD SHX Text Submitted by:
AutoCAD SHX Text
CHIEF, DF-FCIE
AutoCAD SHX Text
29 AUG 18
AutoCAD SHX Text
DF-FCI
AutoCAD SHX Text
BLDGS. 20 & 21
AutoCAD SHX Text
AutoCAD SHX Text
DOOR ELEVATION, SECTIONS AND NOTES
AutoCAD SHX Text BLDG. 21 SCOPE OF WORK: 1. SCOPE OF WORK INCLUDES REPLACEMENT OF DOOR FRAMES DOORS, HANDICAPPED OPERATORS AND CLOSURES AT THE WEST AND EAST, NORTH AND ENTRANCES OF POD A, B, & C, SEE ELEVATION A/4 FOR DOOR AND FRAME SECTIONS AND SECTION B AND ELEVATION A/4 FOR VIEW OF MULLION HEAD/JAMB, AND SILL SECTIONS ON SHEET 4 OF 5. 2. CONTRACTOR IS TO REMOVE EXISTING EXTERIOR DOORS AND ASSOCIATE FRAMES OF THE NORTH, EAST, WEST, AND SOUTH ENTRANCES AND INSTALL NEW DOORS AND FRAMES. SEE ELEVATION A/4 ON SHEET 4 OF 5. 3. MANUFACTURE SELECTION OF COLOR AND MATERIAL ARE TO MATCH EXISTING AND SHALL BE APPROVED BY THE CONTRACTING OFFICER. 4. IF AT ANY POINT THE CONTRACTOR DISCOVERS AN ERROR ON THIS CONSTRUCTION DRAWING AND THE ACTUAL FIELD CONDITIONS, NOTIFY THE GOVERNMENT INSPECTOR OF THE ERROR AND RECOMMENDED SOLUTION. 5. IF CONTRACTOR HAS RECOMMENDED SOLUTIONS THAT ARE NOT PART OF THIS CURRENT CONSTRUCTION DRAWING, CONTACT THE GOVERNMENT INSPECTOR WITH PROPOSED SOLUTION FOR REVIEW BY ENGINEERS. 6. CONTRACTOR SHALL REMOVE ALL MAGNETIC AND ELECTRONIC SECURITY DEVICES, WIRES AND ELECTRONIC DEVICES. REINSTALL WIRES, WIRING TO HOOKUP ALL ELECTRONIC DEVICES AFTER COMPLETION OF NEW DOOR FRAMES AND DOOR COVERS INSTALLATION. CONTRACTOR SHALL PERFORM TESTS TO ENSURE PROPER OPERATION OF ALL ELECTROMAGNETIC LOCK DEVICES.
AutoCAD SHX Text GENERAL NOTES: 1. EXISTING FLOORING SHALL BE COVERED WITH PLASTIC SHEET OR EXISTING FLOORING SHALL BE COVERED WITH PLASTIC SHEET OR GROUND CLOTH DURING CONSTRUCTION. ENSURE THAT NO DAMAGES TO TERRAZZO FLOORING SEGMENTS. 2. DIMENSIONS/SITE CONDITIONS SHALL BE VERIFIED BY CONTRACTOR. DIMENSIONS/SITE CONDITIONS SHALL BE VERIFIED BY CONTRACTOR. 3. AT NO TIME SHALL MORE THAN ONE EXIT OR ONE HALLWAY BE AT NO TIME SHALL MORE THAN ONE EXIT OR ONE HALLWAY BE BLOCKED DUE TO THE AMOUNT OF PERSONNEL THAT WOULD NEED TO EXIT THE FACILITY IN THE EVENT OF AN EMERGENCY. COMPLY WITH NFPA 101-4.6.11. CONTRACTOR MAY WORK (1) DOOR ON EACH BUILDING SIMULTANEOUSLY. 4. ENSURE CONSTRUCTION OPERATIONS COMPLY WITH NFPA 241 ENSURE CONSTRUCTION OPERATIONS COMPLY WITH NFPA 241 SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS. 5. CONTRACTOR TO SUBMIT A SEQUENCE/SCHEDULE OF ENTRANCE CONTRACTOR TO SUBMIT A SEQUENCE/SCHEDULE OF ENTRANCE CLOSURE TO THE COR.
AutoCAD SHX Text SPECIAL NOTE: : 1. ALL WORK SHALL BE ACCOMPLISHED BETWEEN THE HOURS 0600 TO 1730 AND CONTRACTOR NEED ESCORT IN BLDG. 21. 2. THE CONTRACTOR SHALL PROVIDE SAFETY DATA SHEETS (SDS) FOR ALL GLUES, PAINTS, CAULKING, AND SEALANTS USED. 3. TOOLS, MATERIALS, GLUES, ETC, SHALL BE ORGANIZES AT THE END OF EACH WORK DAY. 4. ALL REMOVED DOORS AND FRAMES ARE TO BE RECYCLED.
AutoCAD SHX Text
DETAIL - DOOR ELEVATION
AutoCAD SHX Text N.T.S
AutoCAD SHX Text BLDG. 20 SCOPE OF WORK: 1. SCOPE OF WORK INCLUDES REPLACEMENT OF DOOR FRAMES, DOORS, HANDICAPPED OPERATORS AND CLOSURES AT THE NORTH, EAST, WEST, AND SOUTH ENTRANCES OF POD A, B, C, & D. SEE ELEVATION A/4 FOR DOOR AND FRAME SECTIONS AND SECTION B AND ELEVATION A/4 FOR VIEW OF MULLION HEAD/JAMB, AND SILL SECTIONS ON SHEET 4 OF 5. 2. CONTRACTOR IS TO REMOVE EXISTING INTERIOR AND EXTERIOR DOORS AND ASSOCIATE FRAMES OF THE NORTH, EAST, WEST, AND SOUTH ENTRANCES AND INSTALL NEW DOORS AND FRAMES. SEE ELEVATION A/4 ON SHEET 4 OF 5. 3. MANUFACTURE SELECTION OF COLOR AND MATERIAL ARE TO MATCH EXISTING AND SHALL BE APPROVED BY THE CONTRACTING OFFICER. 4. IF AT ANY POINT THE CONTRACTOR DISCOVERS AN ERROR ON THIS CONSTRUCTION DRAWING AND THE ACTUAL FIELD CONDITIONS, NOTIFY THE GOVERNMENT INSPECTOR OF THE ERROR AND RECOMMENDED SOLUTION. 5. IF CONTRACTOR HAS RECOMMENDED SOLUTIONS THAT ARE NOT PART OF THIS CURRENT CONSTRUCTION DRAWING, CONTACT THE GOVERNMENT INSPECTOR WITH PROPOSED SOLUTION FOR REVIEW BY ENGINEERS. 6. CONTRACTOR SHALL REMOVE ALL MAGNETIC AND ELECTRONIC SECURITY DEVICES, WIRES AND ELECTRONIC DEVICES. REINSTALL WIRES, WIRING TO HOOKUP ALL ELECTRONIC DEVICES AFTER COMPLETION OF NEW DOOR FRAMES AND DOOR COVERS INSTALLATION. CONTRACTOR SHALL PERFORM TESTS TO ENSURE PROPER OPERATION OF ALL ELECTROMAGNETIC LOCK DEVICES.
AutoCAD SHX Text A 4
AutoCAD SHX Text B 4
AutoCAD SHX Text
DETAIL - TEMPERED GLASS FOR VESTIBULE DOORS
AutoCAD SHX Text C 4
AutoCAD SHX Text
DETAIL - DOOR FRAME