30_New_Cumberland_NOC_IT_Equipment_Move_Amendment_001_September_2016.pdf
PDF 65 KB Posted
- Attached to
- New Cumberland Network Operations Center (NOC) IT Equipment Relocation and Installation Services
- Solicitation number
- SP4701-16R-0074
- Issued by
-
Defense Logistics Agency Troop Support
About this file
Amendment 001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
001 9/19/16
6. ISSUED BY CODE SP4701 7. ADMINISTERED BY (If other than Item 6) CODE
DLA Contracting Services Office Philadelphia (DCSO-P) 700 Robbins Avenue, Philadelphia, PA 19111 Phone: 215-737-2570
Anthony.2.Amendolia@DLA.Mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) ( ) 9A. AMENDMENT OF SOLICITATION NO.
SP4701-16-R-0074
X
9B. DATED (SEE ITEM 11)
September 17, 2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; of (c) By separate letter of telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) see below Please see next page
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b) AND IN ACCORDANCE WITH THE ATTACHED MEMORANDUM FOR
RECORD.
C.
THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _ copies to the issuing office.
14. DECRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Continuation Page.
15A. NAME AND TITLE OF SIGNER (Type of print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or Print)
15B. CONTRACT/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 STANDARD FROM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA FAR (48 DFR) 53.243
Continuation Sheet
SP4701-16-R-0074
New Cumberland Network Operations Center (NOC) IT Equipment Relocation and
Installation Support Services
Amendment 001
Subject Solicitation SP4701-16-R-0074 is hereby amended as follows:
1. Page 11 of 47: The following language is change under Section 14:
DELETE:
The prime contractor supporting this SOW Infrastructure and maintenance initiative shall document past experience in the installation and maintenance of telecommunications industry standards based cabling distribution systems and must be familiar with, and be able to reference current ANSI/TIA/EIA Standards.
REPLACE:
The contractor/contractor team supporting this SOW Infrastructure and maintenance initiative shall document past experience in the installation and maintenance of telecommunications industry standards based cabling distribution systems and must be familiar with, and be able to reference current ANSI/TIA/EIA Standards.
2. Page 11 of 47: The following language is change under Section 14:
The Prime Contractor must possess the necessary expertise to work without dependency on Government IT support personnel. Unfamiliarity on the part of the contractor with the
Defense Depot Susquehanna, PA (DDSP) legacy equipment would require the assistance of Government personnel possibly extending the deployment schedule. The implementation schedule is aggressive and the unavailability of Government personnel to assist the contractor during the installation could create a work stoppage or downtime that could impact the project.
The contractor/contractor team must possess the necessary expertise to work without dependency on Government IT support personnel. Unfamiliarity on the part of the contractor with the Defense Depot Susquehanna, PA (DDSP) legacy equipment would require the assistance of Government personnel possibly extending the deployment schedule. The implementation schedule is aggressive and the unavailability of
Government personnel to assist the contractor during the installation could create a work stoppage or downtime that could impact the project.
3. Page 11 of 47: The following language is change under Section 14:
The prime contractor shall be certified and capable of providing all the product warranties and services required in direct support of the requirements through the entire
SOW to include all reseller agreements with manufacturers and /or distributors to support all the requirements in this SOW.
The contractor/contractor team shall be certified and capable of providing all the product warranties and services required in direct support of the requirements through the entire
SOW to include all reseller agreements with manufacturers and /or distributors to support all the requirements in this SOW.
4. Page 11 of 47: The following language is change under Section 14:
The prime contractor shall provide for and maintain the capability to create, update or post changes to drawings, plant records or documents using Government provided paper drawings in AutoCAD format.
The contractor/contractor team shall provide for and maintain the capability to create, update or post changes to drawings, plant records or documents using Government provided paper drawings in AutoCAD format.
5. Vendors providing a response to subject RFP SP4701-16-R-0074 shall provide a signed copy of this amendment to verify receipt, acknowledgment, and acceptance.
All other terms, conditions, provisions, and clauses remain unchanged.