This is a Price Schedule for Material Handling Equipment (MHE) Maintenance services at Molesworth, England, supporting DLA Disposition Services. The contract is structured with a 12-month base period and two 12-month option periods, all valued at $10,000 per period for a total contract value of $30,000 across all periods.

The price schedule establishes CLINs for preventive maintenance services on six categories of equipment: two electric forklifts (3-4k capacity), two forklifts (5-10k capacity), one forklift (20-29k capacity), one warehouse sweeper, two SUV passengers, and one 3.5-ton truck. All preventive maintenance CLINs are priced at $0.00, with costs absorbed within the labor structure. The schedule also includes a Repair/Replacement Parts CLIN valued at $1.00 per unit with a 10,000-unit quantity estimate totaling $10,000 per period, which reimburses parts at actual cost per the Performance Work Statement. Additionally, a Corrective Maintenance Labor CLIN covers unscheduled repairs at 40 hours per period, also priced at $0.00. Offerors are explicitly prohibited from modifying the price schedule, and this line item will be evaluated identically for all offerors. All quotes must be submitted in U.S. Dollars via email to the contracting officer by the specified deadline.

View the file

Other files

File Type Posted
Attachment 4 - Past Performance Questionairre.doc DOC document
Attachment 1 Molesworth MHE Equipment List.xlsx XLSX spreadsheet
Attachment 2 PWS Molesworth MHE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Price Schedule for Molesworth MHE Maintenance
*The Parts Reimbursable CLIN reimburses parts at actual cost, see Performance Work Statement (PWS). Offerors are not to change this line on the price scheduled. This line will be evaluated the same for all offerors.
BASE Period - (12 Months)
CLINDescriptionUnit of IssueQuantityEstimated PriceExtended Price
0001Preventive Maintenance: Electric Forklift, 3-4k (PWS Section 2)EA2$0.00
0002Preventive Maintenance: Forklift, 5-10k (PWS Section 2)EA2$0.00
0003Preventive Maintenance: Forklift, 20-29k (PWS Section 2)EA1$0.00
0004Preventive Maintenance: Warehouse Sweeper (PWS Section 2)EA1$0.00
0005Preventive Maintenance: SUV Passenger (PWS Section 2)EA2$0.00
0006Preventive Maintenance: Truck, 3.5 Ton (PWS Section 2)EA1$0.00
0007Repair/Replacement PartsROM - UN10000$1.00$10,000.00
0008Corrective Maintenance Labor for Unscheduled Repairs (PWS Section 3)ROM - HR40$0.00
Estimated Total Base Period$10,000.00
Option 1-(12 Months)
DescriptionUnit of IssueQuantityEstimated PriceExtended Price
1001Preventive Maintenance: Electric Forklift, 3-4k (PWS Section 2)EA2$0.00
1002Preventive Maintenance: Forklift, 5-10k (PWS Section 2)EA2$0.00
1003Preventive Maintenance: Forklift, 20-29k (PWS Section 2)EA1$0.00
1004Preventive Maintenance: Warehouse Sweeper (PWS Section 2)EA1$0.00
1005Preventive Maintenance: SUV Passenger (PWS Section 2)EA2$0.00
1006Preventive Maintenance: Truck, 3.5 Ton (PWS Section 2)EA1$0.00
1007Repair/Replacement PartsROM - UN10000$1.00$10,000.00
1008Corrective Maintenance Labor for Unscheduled Repairs (PWS Section 3)ROM - HR40$0.00
Estimated Total Option Period 1$10,000.00
Option 2-(12 Months)
DescriptionUnit of IssueQuantityEstimated PriceExtended Price
2001Preventive Maintenance: Electric Forklift, 3-4k (PWS Section 2)EA2$0.00
2002Preventive Maintenance: Forklift, 5-10k (PWS Section 2)EA2$0.00
2003Preventive Maintenance: Forklift, 20-29k (PWS Section 2)EA1$0.00
2004Preventive Maintenance: Warehouse Sweeper (PWS Section 2)EA1$0.00
2005Preventive Maintenance: SUV Passenger (PWS Section 2)EA2$0.00
2006Preventive Maintenance: Truck, 3.5 Ton (PWS Section 2)EA1$0.00
2007Repair/Replacement PartsROM - UN10000$1.00$10,000.00
2008Corrective Maintenance Labor for Unscheduled Repairs (PWS Section 3)ROM - HR40$0.00
Estimated Total Option Period 2$10,000.00

TOTAL ALL OPTIONS $30,000.00