Attachment 7 Estimated Annual Hours of Equipment.pdf

PDF 227 KB Posted

Attached to
DLA Disposition Services Gimcheon, South Korea Material Handling Equipment (MHE) Maintenance and Repair
Solicitation number
SP451025Q1056
Issued by

About this file

Attachment 7 is a detailed table listing estimated annual preventive maintenance hours for various equipment types over a 12-month base period. The document outlines 12 Contract Line Item Numbers (CLINs) for different machinery, including diesel and electric forklifts of varying capacities (3K, 4K, 6K, 15K, 35K, and 55K), an All Terrain Vehicle, Front End Loader, and two types of Scrap Shredders (Industrial and Mobile). Each CLIN specifies the equipment type, unit of issue (EA), amount, and estimated annual maintenance hours, with the most intensive maintenance requirements being 350 hours for a 4K Electric Forklift and the least being 48 hours for a 55K Diesel Forklift. The Scrap Handler with Grapple (CLIN 12) has a "N/A" notation for extended price.

View the file

Other files

File Type Posted
Attachment 1 Gimcheon MHE Equipment list.xlsx XLSX spreadsheet
Attachment 5 Questions and Answers.pdf PDF
Attachment 6 Questions and Answers.pdf PDF
Attachment 3 Price Schedule Gimcheon MHE.xlsx XLSX spreadsheet
Attachment 4 - Past Performance Questionnaire.doc DOC document
Attachment 2 PWS Gimcheon MHE Maint.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 7 Estimated Annual Hours of Equipment

CLIN BASE Period - (12 Months)

Unit of

Issue

Amount Price Extended

Price Est. Annual

Hours

1 Preventive Maintenance on 15K Diesel Forklift EA 2 398

2 Preventive Maintenance on 4K Diesel Forklift EA 4 220

3 Preventive Maintenance on 4K Electric Forklift EA 4 350

4 Preventive Maintenance on 6K Diesel Forklift EA 4 292

5 Preventive Maintenance on 55K Diesel Forklift EA 2 48

6 Preventive Maintenance on 35K Diesel Forklift EA 2 161

7 Preventive Maintenance on 3K Electric Forklift EA 2 245

8 Preventive Maintenance on All Terrain Vehicle EA 1 111

9 Preventive Maintenance on Front End Loader EA 2 287

Preventive Maintenance on Scrap Shredder (Industrial) EA 2 103

Preventive Maintenance on Scrap Shredder (Mobile) EA 2 115

Preventive Maintenance on Scrap Handler w/Grapple EA 1 N/A

File details come from the government source that posted it. Updated .