Attachment 4 Questions and Answers.pdf

PDF 67 KB Posted

Attached to
One-Time Truck Scale Repair & Calibration - DLA Disposition Services San Antonio
Solicitation number
SP451025Q1047
Issued by

About this file

This document is an Amendment 1 Questions and Answers file for a truck scale repair and calibration solicitation. The document contains four key questions and answers about a scale's current configuration, including confirmation that the indicator is not running any custom programs, the scale has 12 30FT analog load cells, and no additional devices are connected to the indicator. The most substantive response addresses the structural evaluation of the scale, with the technician indicating that a comprehensive structural assessment will only be possible after load cell removal, and any additional repairs or replacements will be identified during the installation process.

View the file

Other files

File Type Posted
Attachment 3 Scale Pictures.pdf PDF
Attachment 2 Price Schedule.xlsx XLSX spreadsheet
Attachment 1 PWS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1 – Questions and Answers

Question 1: Is the indicator currently running any custom programs?

Answer 1: No

Question 2: How many load cells are connected to the scale?

Answer 2: Based on our best knowledge it has 12 30FT Analog load cells.

Question 3: Are there any additional devices connected to the indicator besides the scale base?

Answer 3: Nothing else is connected to the indicator.

Question 4: The bid mentions structural evaluation of the scale of which we would not be able to perform without direct access. Our bid will only cover replacement of load cells, mounts, electronics, cables, and indicator. We will evaluate for structural needs at the time of replacement and provide a quote if needed. Is this correct?

Answer 4: As for a structural evaluation on the scale, it was observed that they would be installing the new electronics and load cells etc. The technician also mentioned if additional repairs or replacements were necessary, they would bring it up during the installation of the new parts, but they could not assume until work started. So, they are correct in stating that’s the expectation cause until they remove the load cells they can have a better understanding on the structural evaluation of the scale.