This is Amendment 0002 to Solicitation SP330027Q0003, issued by DLA Distribution's Acquisition Operations on October 21, 2026, with an effective date of October 15, 2026. The amendment addresses five vendor questions regarding inspection and testing services for specialized equipment.

The amendment provides clarification on equipment specifications and requirements. Four vehicles with aerial bucket equipment require inspection and testing: Ford F750 with Altec AA755L (Serial #0705BZ3699), RAM 5500 with Altec AT40G (Serial #0119EY4220), International 4700 with Altec D842-BC (Serial #0993-BE0524), and International 7400 with Altec A72-T. Electrical insulation testing requirements specify upper booms tested at 54/80KV DC for 1 minute and lower booms at 50KV DC for 3 minutes, with bucket liner specifications at 100KV DC for 3 minutes. The solicitation includes inspection and testing of up to 15 hot-line tools (hot sticks and shot gun sticks, 10 feet and up to 15,000V). No photographs or previous inspection reports are available. No third-party inspector certification is required; only post-inspection test reports are required upon service completion. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation or risk rejection. The contact point is Michael French at michael.s.french@dla.mil.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

SP3300

SEE CONTINUATION PAGE(S)

DLA Distribution Acquisition Operations, J7 Mifflin Avenue, Bldg 5430 New Cumberland, PA 17070

POC: Michael French michael.s.french@dla.mil

SP330027Q0003

1 2

10/21/2026

10/15/2026

SP330027Q0003

AMD0002

The purpose of this amendment is to answer the following vendor questions:

a) Q: What are the serial numbers of the buckets?

A: The serial numbers are:

a. Ford F750 – Altec AA755L Serial #0705BZ3699

b. RAM 5500 – Altec AT40G Serial #0119EY4220

c. International 4700 – Altec D842-BC Serial #0993-BE0524

d. International 7400 – Altec A72-T No electrical testing required

b) Q: What are the electrical insulation ratings and bucket liner specifications of this equipment?

A: The truck upper booms are tested at 54/80KV DC for 1 minute, and lower booms are tested at 50KV DC for 3 minutes. The bucket liner specifications are 100KV DC for 3 minutes.

c) Q: Are photographs of the equipment or previous inspection reports available?

A: This information is not available at this time.

d) Q: Can you provide an inventory of the up to 15 hot-line tools requiring inspection and testing?

A: Hot-line tools include: hot sticks and shot gun sticks, 10’ and up to 15,000V.

e) Q: Is there a specific third-party inspector certification required?

A: No third-party certification is required. No documents are required other than post inspection test reports after the service is completed.

This amendment makes no other changes.

p1