This document is a Contract Data Requirements List (CDRL) for a Small Business Participation Quarterly Progress Report under the ASRS Maintenance contract with Solicitation Number SP3300-24-Q-0057 issued by the Defense Logistics Agency (DLA) Distribution.
The CDRL requires the contractor to submit a quarterly report on their small business participation, including the company names, CAGE codes, business categories, product/service descriptions, and NAICS codes for each small business concern, as well as the contractor's original proposed and actual small business participation dollar values and percentages for the reporting period. The contractor must provide rationale for any differences between proposed and actual small business participation. The report must be submitted electronically no later than the 10th working day after the end of each quarter (March 31st, June 30th, September 30th, December 31st). The Contracting Officer will review and accept the CDRL A001 report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SP330024Q0057_Amendment 0002.docx | DOCX document | |
| Amendment_0002_SP330024Q0057.pdf | ||
| Amendment_0002 SP330024Q0057.pdf | ||
| Amendment 0001 Attachment 4 Subcontracting Plan Includes Elements 1-15.docx | DOCX document | |
| SP330024Q0057_Amendment 0001.docx | DOCX document | |
| Amendment_0001 SP330024Q0057.pdf | ||
| TE 1.1 Contractor Personnel Security.docx | DOCX document | |
| Attachment 1 PWS and Equipment List ASRS Maintenance.docx | DOCX document | |
| Attachment 3 Schedule of Supplies and Services.xlsx | XLSX spreadsheet | |
| Attachment 2b COSR ASRS Maintenance.pdf | ||
| Attachment 2a QASP - POC Listing.docx | DOCX document | |
| TE 1.2 CAC Procedures (DLAM 1000.13 Effective 5 April 2022).docx | DOCX document | |
| SP3300-24-Q-0057.docx | DOCX document | |
| Attachment 2 QASP.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024
Page of
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024
Page of
CONTRACT DATA REQUIREMENTS LIST
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES Draft Final Reg Repro
16. REMARKS
14. DISTRIBUTION
15.TOTAL
Image of arrow pointing towards totals
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"
| CurrentPage: |
| PageCount: |
| Select Classification from drop-down list.: 1 |
| CUI Indicator Information: |
| Click on this button to attach a file(s).: |
| A. CONTRACT LINE ITEM NUMBER: n/a |
| exhibit: Attachment 5 |
| C. CATEGORY: Select for "TDP.": 0 |
| C. CATEGORY: Select for "TM.": 0 |
| C. CATEGORY: Select for "OTHER.": 0 |
| C. CATEGORY: Enter specification for "Other.": |
| System: ASRS Maintenance |
| ContractNum: SP3300-24-Q-0057 |
| Contractor: |
| 1. DATA ITEM NUMBER: A001 |
| titleDataItem: Small Business Participation Quarterly Progress Report |
| subtitle: |
| 4. AUTHORITY (Data Acquisition Document Number): |
| contractRef: |
| reqOffice: DLA Distribution J-7 |
| 7. DD 250 REQUIREMENT: |
| 8. APPROVAL CODE : |
| 9. DISTRIBUTION STATEMENT REQUIRED: |
| freq: See Block 16 |
| asOfDate: |
| dateFirstSub: See Block 16 |
| dateSubseqSub: See Block 16 |
| 16. REMARKS: Tailored to permit contractor's format. |
Submit electronically no later than the the tenth (10th) working day after the end of each quarter. The following are the Quarterly end dates applicable to each year during the life of the contract: March 31st, June 30th, September 30th, December 31st.
Contract shall include the actual small business participation during the reporting period to include the following information: Company name, Cage Code, business category(ies), description of products or services, and NAICS code for each Small Business Concern (SBC) and the current commitment with the SBC. The contractor shall include their original proposed Small Business Participation information. The contractor shall provide rationale for differences between what was proposed and the contractor's actuals.
In addition, the contractor shall include a table identifying the proposed dollar value and proposed percent of total contract value and the contractor's actual dollar value and percent of total contract value for the reporting period for each category below. The table shall also provide a column with the difference (percentage) between what the contractor proposed and the actual data for the reporting period. The contractor shall include rationale for differences between what was proposed and the contractor's actuals.
Business Category:
Total Proposed Contract Value – Prime Offeror Total Small Business Small Disadvantaged Business Woman-Owned Small Business HUBZone Small Business Veteran-Owned Small Business Service-Disabled Veteran-Owned Small Business
Block 7-Inspection and acceptance requirements:
The KO will review and accept CDRL A001.
Block 14-Distribution-Contractor to submit original to the Contract Specialist and copy to the COR.
| Click to add continuation field for Remarks: |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: COR |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: J7 Contract Specialist |
| 15.TOTAL - Total draft copies is automatically calculated.: |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: 1 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: 1 |
| priceGrp: |
| estTotalPrice: |
| remarks: |
| preparedBy: |
| J. SIGNATURE: H. SIGNATURE |
| J. SIGNATURE: J. SIGNATURE |
| J. SIGNATURE: |
| approvedBy: |
| Click to add additional data items.: |
| Click to delete additional data items.: |
File details come from the government source that posted it. Updated .