Amendment 0002.pdf
PDF 768 KB Posted
- Solicitation number
- SP330022R5003
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document provides an amendment to a solicitation for third-party logistics hazardous materials support services. The amendment clarifies that resumes and letters of intent will be excluded from the page count for technical proposals. It also includes answers to questions from an offeror in response to the original solicitation, updating certain contract data requirement lists and documents. The underlying solicitation seeks these support services for hazardous materials at the Corpus Christi Army Depot in Texas from the Defense Logistics Agency Distribution. It provides the solicitation and attachment documents with instructions to access sensitive uploaded files. A pre-proposal conference and site visit are also planned for interested offerors to attend.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| SP3300-22-R-5003 0001 (TRACKED).docx | DOCX document | |
| PPC Attendance DDCT 19 April 2022.pdf | ||
| Final-DDCT Pre-Proposal Slides (4-19-22).pptx | PPTX presentation | |
| SP3300-22-R-5003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
N/A
The purpose of this amendment is to answer a question in response to the solicitation and update the attached solicitation documents.
Attachments:
-CDRLs A006, A009, and A029
DLA Distribution Acquisition Operations (J7) 430 Mifflin Ave, Suite 3102A New Cumberland, PA 17070-5008 POC: Tyler Houser, (717) 770-7384
SP3300-22-R-5003
1 2
06/09/2022
04/11/2022
Question RFP Page or Pre- Proposal Conference
RFP Para Reference (If question relates to the RFP)
Government Response
Discussion: Section L-4, Table 1 of the RFP stipulates a 50-page limitation for E-File II with a separate note that “all documents are included in the page count”.
Question: Due to the very tight page limitations and inclusion of the Cover, TOC, and Glossary in the page count, will the government consider revising the requirement to allow Key Personnel-resumes and Letters of Intent be excluded from the page count and included as attachments to the Technical Proposal Volume.
23 E-File II, Tab 2 E-File II, Tab 2 The Government will exclude resumes and letters of intent from the page count for the Technical Proposal.
END OF AMENDMENT 0002
SP3300-22-R-5003
Amendment 0002
| Amendment 0002X.pdf |
| Q&A2 DDCT Haz.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .