SP3300-22-R-5003.pdf
PDF 2 MB Posted
- Solicitation number
- SP330022R5003
- Issued by
-
Defense Logistics Agency Distribution
About this file
This solicitation requests proposals for hazardous materials support services for the Corpus Christi Army Depot. Offerors must provide logistics and distribution services for hazardous materials, including packaging, storage, transportation and disposal. Sealed proposals are due no later than June 15, 2022 and will be evaluated based on technical qualifications, past performance, and price. The Defense Logistics Agency Distribution will award a single contract for a one-year base period with four one-year options. The contractor must comply with Defense Transportation Regulation requirements for hazardous materials and possess all required permits and licenses to handle substances in Texas. The pre-proposal conference and site visit are scheduled for May 25, 2022 and interested offerors must RSVP in advance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| SP3300-22-R-5003 0001 (TRACKED).docx | DOCX document | |
| PPC Attendance DDCT 19 April 2022.pdf | ||
| Final-DDCT Pre-Proposal Slides (4-19-22).pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
62/,&,7$7,21��2))(5�$1'�$:$5'
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING 3$*(������2)����3$*(6
���&2175$&7�180%(5 ���62/,&,7$7,21�180%(5 ���'$7(�,668(' ���5(48,6,7,21�385&+$6(�180%(5
62/,&,7$7,21
�� 6HDOHG�RIIHUV�LQ�RULJLQDO�DQG FRSLHV��IRU�IXUQLVKLQJ�WKH�VXSSOLHV�RU�VHUYLFHV�LQ�WKH�6FKHGXOH�ZLOO�EH�UHFHLYHG�DW�WKH�SODFH�VSHFLILHG�LQ�,WHP����RU�LI
KDQGFDUULHG��LQ�WKH�GHSRVLWRU\�ORFDWHG�LQ XQWLO ORFDO�WLPH
�+RXU� �'DWH�
&$87,21���/$7(�6XEPLVVLRQV��0RGLILFDWLRQV��DQG�:LWKGUDZDOV���6HH�6HFWLRQ�/��3URYLVLRQ�1R�����������RU������������$OO�RIIHUV�DUH�VXEMHFW�WR�DOO�WHUPV�DQG�FRQGLWLRQV
FRQWDLQHG�LQ�WKLV�VROLFLWDWLRQ�
$��1$0( %��7(/(3+21(��12�&2//(&7�&$//6�
$5($�&2'( 180%(5 (;7�
&��(�0$,/�$''5(66
����7$%/(�2)�&217(176
�;� 6(&� '(6&5,37,21 3$*(�6� �;� 6(&� '(6&5,37,21 3$*(�6�
3$57�,���7+(�6&+('8/( 3$57�,,���&2175$&7�&/$86(6
62/,&,7$7,21�&2175$&7�)250
6833/,(6�25�6(59,&(6�$1'�35,&(6�&2676
'(6&5,37,21�63(&6��:25.�67$7(0(17
3$&.$*,1*�$1'�0$5.,1*
,163(&7,21�$1'�$&&(37$1&(
'(/,9(5,(6�25�3(5)250$1&(
&2175$&7�$'0,1,675$7,21�'$7$
63(&,$/�&2175$&7�5(48,5(0(176
&2175$&7�&/$86(6
3$57�,,,���/,67�2)�'2&80(176��(;+,%,76�$1'�27+(5�$77$&+�
- /,67�2)�$77$&+0(176
3$57�,9���5(35(6(17$7,216�$1'�,16758&7,216
5(35(6(17$7,216��&(57,),&$7,216�$1'�27+(5 67$7(0(176�2)�2))(5256
,16756���&21'6���$1'�127,&(6�72�2))(5256
(9$/8$7,21�)$&7256�)25�$:$5'
2))(5��0XVW�EH�IXOO\�FRPSOHWHG�E\�RIIHURU�
127(���,WHP����GRHV�QRW�DSSO\�LI�WKH�VROLFLWDWLRQ�LQFOXGHV�WKH�SURYLVLRQV�DW������������0LQLPXP�%LG�$FFHSWDQFH�3HULRG�
��� ,Q�FRPSOLDQFH�ZLWK�WKH�DERYH��WKH�XQGHUVLJQHG�DJUHHV��LI�WKLV�RIIHU�LV�DFFHSWHG�ZLWKLQ FDOHQGDU�GD\V�����FDOHQGDU�GD\V�XQOHVV�D�GLIIHUHQW
SHULRG�LV�LQVHUWHG�E\�WKH�RIIHURU��IURP�WKH�GDWH�IRU�UHFHLSW�RI�RIIHUV�VSHFLILHG�DERYH��WR�IXUQLVK�DQ\�RU�DOO�LWHPV�XSRQ�ZKLFK�SULFHV�DUH�RIIHUHG�DW�WKH�SULFH�VHW�RSSRVLWH
HDFK�LWHP��GHOLYHUHG�DW�WKH�GHVLJQDWHG�SRLQW�V���ZLWKLQ�WKH�WLPH�VSHFLILHG�LQ�WKH�VFKHGXOH�
����)25 ,1)250$7,21
��� �',6&2817�)25�352037�3$<0(17
��6HH�6HFWLRQ�,��&ODXVH�1R�����������
���&$/(1'$5�'$<6���� ���&$/(1'$5�'$<6���� ���&$/(1'$5�'$<6���� &$/(1'$5�'$<6����
��� �$&.12:/('*0(17�2)�$0(1'�
�0(176��7KH�RIIHURU�DFNQRZOHGJHV�UHFHLSW�RI�
�DPHQGPHQWV�WR�WKH�62/,&,7$7,21�IRU�RIIHURUV�
�DQG�UHODWHG�GRFXPHQWV�QXPEHUHG�DQG�
�GDWHG��
$0(1'0(17�12� '$7( $0(1'0(17�12� '$7(
��$� 1$0(�$1' $''5(66 2)�2))(5�
&2'( )$&,/,7< ��� 1$0(�$1'�7,7/(�2)�3(5621�$87+25,=('�72�6,*1�2))(5
�7\SH�RU�SULQW�
��%��7(/(3+21(�180%(5
$5($�&2'( 180%(5 (;7� ��&��&+(&.�,)�5(0,77$1&(�$''5(66�,6 ',))(5(17�)520�$%29(���(17(5�68&+ $''5(66�,1�6&+('8/(�
����6,*1$785( ����2))(5�'$7(
$:$5'��7R�EH�FRPSOHWHG�E\�*RYHUQPHQW�
����$&&(37('�$6�72�,7(06�180%(5(' ����$02817
����$87+25,7<�)25�86,1*�27+(5�7+$1�)8//�$1'�23(1�&203(7,7,21�
���8�6�&�������F� � ���8�6�&������F��� �
,03257$17���$ZDUG�ZLOO�EH�PDGH�RQ�WKLV�)RUP��RU�RQ�6WDQGDUG�)RUP�����RU�E\�RWKHU�DXWKRUL]HG�RIILFLDO�ZULWWHQ�QRWLFH�
$87+25,=('�)25�/2&$/�5(352'8&7,21
3UHYLRXV�HGLWLRQ�LV�XQXVDEOH
67$1'$5'�)250�����5(9�������
3UHVFULEHG�E\�*6$���)$5�����&)5���������F�
����$'0,1,67(5('�%<��,I�RWKHU�WKDQ�,WHP��� &2'( ����3$<0(17�:,//�%(�0$'(�%< &2'(
����1$0(�2)�&2175$&7,1*�2)),&(5��7\SH�RU�SULQW� ����81,7('�67$7(6�2)�$0(5,&$ ����$:$5'�'$7(
�6LJQDWXUH�RI�&RQWUDFWLQJ�2IILFHU�
���$''5(66�2))(5�72��,I�RWKHU�WKDQ�,WHP������,668('�%< &2'(
���7<3(�2)�62/,&,7$7,21
6($/('�%,'��,)%�
1(*27,$7('��5)3�
127(���,Q�VHDOHG��ELG�VROLFLWDWLRQV���RIIHU���DQG��RIIHURU���PHDQ���ELG���DQG���ELGGHU��
����$&&2817,1*�$1'�$335235,$7,21
���68%0,7�,192,&(6�72�$''5(66
6+2:1�,1����FRSLHV�XQOHVV�RWKHUZLVH�VSHFLILHG�
,7(0
Supplies/Services QTY UNIT UNIT PRICE AMOUNT
BASE YEAR
Transition Period - 27 April 2023 through 26 August 2023
Full performance - 27 August 2023 through 26 April 2024
0001 Firm Fixed Price (FFP) 8 Months -$ -$
The contractor shall provide labor to support all tasks in accordance with the Performance Work Statement.
(PSC S216) (ACRN: AA)
0002 Cost Plus Fixed Fee (CPFF) Procurement of Hazardous Material (PWS Section C-5.4)
(PSC S216) (ACRN: AA)
Estimated Cost 5,585,637.03$ Applicable Indirect Rate _____% -$
Fixed Fee _____% -$
Total Estimated Cost Plus Fixed Fee -$
0003 Cost Reimbursement (No Fee)
Material Support, MHE, MHE Maintenance, Travel and Training (PWS Section C-4)
(PSC S216) (ACRN: AA)
Estimated Cost 82,000.00$ Applicable Indirect Rate _____% -$
Not-to-Exceed (NTE) -$
0004 Contract Data Requirements List (CDRL) in accordance with DD Form 1423
(PSC S216)
NSP NSP
A001 Transition Plan
A002 SOH Plan and Reporting
A003 Environmental Facilities Assessment Report
A004 Site Specific Spill Contingency Plan (SSSCP)
A005 Training Report
A006 Quality Control Plan
A007 Weekly Transition Report
A008 Monthly CAC Report
A009 Continuation of Essential Contractor Services Plan
A010 Transition-Out Plan
A011 Site Specific SOP's
A012 Monthly Status Report
A013 Customer Service Plan and Support Procedures On-Call Response Roster
A014 Procedures for Continuity of Performance During Outages
A015 Weekly Item Order Status Report
A016 Monthly Not Carried Report
A017 Monthly Issue Report
A018 Monthly Not in Stock (NIS) Report
A019 Weekly Frustrated Material Report
A020 Monthly Inventory Report
A021 Annual Inventory Report
A022 Weekly Critical Items List
A023 SSDRP
A024 Weekly Container Inspection Report
A025 WGCP Contingency Plan IAW NAS CC Hazardous Waste Management
A026 HM for Potential Disposal
A027 Monthly Cost Report for Hazardous Materials - CLIN X002 - CPFF
A028 Monthly Cost Report for Material Support CLIN X003 - CR
A029 Small Business Participation Bi Annual Progress Report
0005 Transition (FFP) Services to perform the transition in period (PWS Section C-1.8)
(PSC S216) (ACRN: AA)
4 Months -$ -$
TOTAL CEILING - BASE YEAR -$
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SP3300-22-R-5003
OPTION YEAR ONE
27 April 2024 through 26 April 202
1001 Firm Fixed Price (FFP) 12 Months -$ -$
The contractor shall provide labor to support all tasks in accordance with the Performance Work Statement.
(PSC S216) (ACRN: AB)
1002 Cost Plus Fixed Fee (CPFF) Procurement of Hazardous Material (PWS Section C-5.4)
(PSC S216) (ACRN: AB)
Estimated Cost 5,697,349.77$ Applicable Indirect Rate _____% -$
Fixed Fee _____% -$
Total Estimated Cost Plus Fixed Fee -$
1003 Cost Reimbursement (No Fee)
Material Support, MHE, MHE Maintenance, Travel and Training (PWS Section C-4)
(PSC S216) (ACRN: AB)
Estimated Cost 82,000.00$ Applicable Indirect Rate _____% -$
Not-to-Exceed (NTE) -$
1004 Contract Data Requirements List (CDRL) in accordance with DD Form 1423
(PSC S216)
NSP NSP
A001 Transition Plan
A002 SOH Plan and Reporting
A003 Environmental Facilities Assessment Report
A004 Site Specific Spill Contingency Plan (SSSCP)
A005 Training Report
A006 Quality Control Plan
A007 Weekly Transition Report
A008 Monthly CAC Report A009 Continuation of Essential Contractor Services Pla A010 Transition-Out Plan
A011 Site Specific SOP's
A012 Monthly Status Report
A013 Customer Service Plan and Support Procedures On-Call Response Roster
A014 Procedures for Continuity of Performance During Outages
A015 Weekly Item Order Status Report
A016 Monthly Not Carried Report
A017 Monthly Issue Report
A018 Monthly Not in Stock (NIS) Report
A019 Weekly Frustrated Material Report
A020 Monthly Inventory Report
A021 Annual Inventory Report
A022 Weekly Critical Items List
A023 SSDRP
A024 Weekly Container Inspection Report A025 WGCP Contingency Plan IAW NAS CC Hazardous Waste Management A026 HM for Potential Disposal
A027 Monthly Cost Report for Hazardous Materials - CLIN X002 - CPFF
A028 Monthly Cost Report for Material Support CLIN X003 - CR
A029 Small Business Participation Bi Annual Progress Report
TOTAL CEILING - OPTION YEAR ONE -$
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
OPTION YEAR TWO
27 April 2025 through 26 April 2026
2001 Firm Fixed Price (FFP) 12 Months -$ -$
The contractor shall provide labor to support all tasks in accordance with the Performance Work Statement.
(PSC S216) (ACRN: AC)
2002 Cost Plus Fixed Fee (CPFF) Procurement of Hazardous Material (PWS Section C-5.4)
(PSC S216) (ACRN: AC)
Estimated Cost 5,811,296.77$ Applicable Indirect Rate _____% -$
Fixed Fee _____% -$
Total Estimated Cost Plus Fixed Fee -$
2003 Cost Reimbursement (No Fee)
Material Support, MHE, MHE Maintenance, Travel and Training (PWS Section C-4)
(PSC S216) (ACRN: AC)
Estimated Cost 82,000.00$ Applicable Indirect Rate _____% -$
Not-to-Exceed (NTE) -$
2004 Contract Data Requirements List (CDRL) in accordance with DD Form 1423
(PSC S216)
NSP NSP
A001 Transition Plan
A002 SOH Plan and Reporting
A003 Environmental Facilities Assessment Report
A004 Site Specific Spill Contingency Plan (SSSCP)
A005 Training Report
A006 Quality Control Plan
A007 Weekly Transition Report
A008 Monthly CAC Report
A009 Continuation of Essential Contractor Services Plan
A010 Transition-Out Plan
A011 Site Specific SOP's
A012 Monthly Status Report
A013 Customer Service Plan and Support Procedures On-Call Response Roster
A014 Procedures for Continuity of Performance During Outages
A015 Weekly Item Order Status Report
A016 Monthly Not Carried Report
A017 Monthly Issue Report
A018 Monthly Not in Stock (NIS) Report
A019 Weekly Frustrated Material Report
A020 Monthly Inventory Report
A021 Annual Inventory Report
A022 Weekly Critical Items List
A023 SSDRP
A024 Weekly Container Inspection Report
A025 WGCP Contingency Plan IAW NAS CC Hazardous Waste Management
A026 HM for Potential Disposal
A027 Monthly Cost Report for Hazardous Materials - CLIN X002 - CPFF
A028 Monthly Cost Report for Material Support CLIN X003 - CR
A029 Small Business Participation Bi Annual Progress Report
TOTAL CEILING - OPTION YEAR TWO -$
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
OPTION YEAR THREE
27 April 2026 through 26 April 2027
3001 Firm Fixed Price (FFP) 12 Months -$ -$
The contractor shall provide labor to support all tasks in accordance with the Performance Work Statement.
(PSC S216) (ACRN: AD)
3002 Cost Plus Fixed Fee (CPFF) Procurement of Hazardous Material (PWS Section C-5.4)
(PSC S216) (ACRN: AD)
Estimated Cost 5,927,522.11$ Applicable Indirect Rate _____% -$
Fixed Fee _____% -$
Total Estimated Cost Plus Fixed Fee -$
3003 Cost Reimbursement (No Fee)
Material Support, MHE, MHE Maintenance, Travel and Training (PWS Section C-4)
(PSC S216) (ACRN: AD)
Estimated Cost 82,000.00$ Applicable Indirect Rate _____% -$
Not-to-Exceed (NTE) -$
3004 Contract Data Requirements List (CDRL) in accordance with DD Form 1423
(PSC S216)
NSP NSP
A001 Transition Plan
A002 SOH Plan and Reporting
A003 Environmental Facilities Assessment Report
A004 Site Specific Spill Contingency Plan (SSSCP)
A005 Training Report
A006 Quality Control Plan
A007 Weekly Transition Report
A008 Monthly CAC Report
A009 Continuation of Essential Contractor Services Plan
A010 Transition-Out Plan
A011 Site Specific SOP's
A012 Monthly Status Report
A013 Customer Service Plan and Support Procedures On-Call Response Roster
A014 Procedures for Continuity of Performance During Outages
A015 Weekly Item Order Status Report
A016 Monthly Not Carried Report
A017 Monthly Issue Report
A018 Monthly Not in Stock (NIS) Report
A019 Weekly Frustrated Material Report
A020 Monthly Inventory Report
A021 Annual Inventory Report
A022 Weekly Critical Items List
A023 SSDRP
A024 Weekly Container Inspection Report
A025 WGCP Contingency Plan IAW NAS CC Hazardous Waste Management
A026 HM for Potential Disposal
A027 Monthly Cost Report for Hazardous Materials - CLIN X002 - CPFF
A028 Monthly Cost Report for Material Support CLIN X003 - CR
A029 Small Business Participation Bi Annual Progress Report
TOTAL CEILING - OPTION YEAR THREE -$
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
OPTION YEAR FOUR
27 April 2027 through 26 April 2028
4001 Firm Fixed Price (FFP) 12 Months -$ -$
The contractor shall provide labor to support all tasks in accordance with the Performance Work Statement.
(PSC S216) (ACRN: AE)
4002 Cost Plus Fixed Fee (CPFF) Procurement of Hazardous Material (PWS Section C-5.4)
(PSC S216) (ACRN: AE)
Estimated Cost 6,046,073.16$ Applicable Indirect Rate _____% -$
Fixed Fee _____% -$
Total Estimated Cost Plus Fixed Fee -$
4003 Cost Reimbursement (No Fee)
Material Support, MHE, MHE Maintenance, Travel and Training (PWS Section C-4)
(PSC S216) (ACRN: AE)
Estimated Cost 82,000.00$ Applicable Indirect Rate _____% -$
Not-to-Exceed (NTE) -$
4004 Contract Data Requirements List (CDRL) in accordance with DD Form 1423
(PSC S216)
NSP NSP
A001 Transition Plan
A002 SOH Plan and Reporting
A003 Environmental Facilities Assessment Report
A004 Site Specific Spill Contingency Plan (SSSCP)
A005 Training Report
A006 Quality Control Plan
A007 Weekly Transition Report
A008 Monthly CAC Report
A009 Continuation of Essential Contractor Services Plan
A010 Transition-Out Plan
A011 Site Specific SOP's
A012 Monthly Status Report
A013 Customer Service Plan and Support Procedures On-Call Response Roster
A014 Procedures for Continuity of Performance During Outages
A015 Weekly Item Order Status Report
A016 Monthly Not Carried Report
A017 Monthly Issue Report
A018 Monthly Not in Stock (NIS) Report
A019 Weekly Frustrated Material Report
A020 Monthly Inventory Report
A021 Annual Inventory Report
A022 Weekly Critical Items List
A023 SSDRP
A024 Weekly Container Inspection Report
A025 WGCP Contingency Plan IAW NAS CC Hazardous Waste Management
A026 HM for Potential Disposal
A027 Monthly Cost Report for Hazardous Materials - CLIN X002 - CPFF
A028 Monthly Cost Report for Material Support CLIN X003 - CR
A029 Small Business Participation Bi Annual Progress Report
TOTAL CEILING - OPTION YEAR FOUR -$
TOTAL -$
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION B - INSTRUCTIONS
This requirement is solicited as an unrestricted, full and open competition for the DLA Distribution, Corpus Christi, Texas (DDCT) Third-
Party Logistics (3PL) Hazardous Material (HM) Services for Corpus Christi Army Depot (CCAD). This is a hybrid Firm-Fixed-Price
(FFP), Cost-Plus-Fixed-Fee (CPFF), and Cost Reimbursement (CR) No fee type contract, with a base period of (1) year and four (4), one
(1) year options. The place of performance is at CCAD.
PRICING INSTRUCTIONS:
All CLINs shall be invoiced in accordance with SECTION G-4, INVOICING INSTRUCTIONS.
FIRM-FIXED-PRICE (FFP) ARRANGEMENT – CLINS X001: Price for labor to support all tasks in accordance with section J.1 -
Performance Work Statement shall be paid on a firm-fixed-price basis. Offeror shall insert the monthly unit price and the total extended price.
COST-PLUS-FIXED-FEE (CPFF) ARRANGEMENT – CLINS X002: Costs for procurement of Hazardous Material (HM). Offerors shall apply ONLY their applicable indirect rate(s) and fixed fee to the Government provided estimated cost to arrive at the Total Estimated Cost, Plus Fixed Fee amount. In accordance with FAR 15.404-4(c)(4)(i)(C), the fixed fee shall not exceed 10% of the contract’s estimated cost, excluding fee. The Government has provided its estimated costs.
The contractor is required to obtain competition for all material purchases, regardless of dollar value, to the maximum extent practicable, which will be monitored by the Contracting Officer’s Representative (COR). The Contractor will be required to continuously improve demand projections to enhance material availability, buying power, pinpointing improvement opportunities to reduce HM costs. The contractor will be authorized to use Government Sources of Supply (i.e. DLA, GSA and NIB/NISH).
COST REIMBURSEMENT (CR) NO FEE ARRANGEMENT – CLINS X003: Costs for Material Support, MHE, MHE Maintenance, Travel, and Training. The Contractor shall be reimbursed for actual costs and their applicable indirect rate only. No fee shall be applied.
The Government has provided its estimated costs.
REPORTING REQUIREMENTS – CLIN X004 (NSP): The reporting requirements are Not Separately Priced. While these CLINs are not separately priced, it is anticipated and it is acceptable that the Contractor will be reimbursed for the execution of this CLIN. Costs associated with this effort shall be captured under the FFP CLINs only.
FIRM-FIXED-PRICE (FFP) ARRANGEMENT – CLIN 0005: Price for contract transition in accordance with section J.1 - Performance
Work Statement shall be paid on a firm-fixed-price basis. Offeror shall insert the monthly unit price and the total extended price.
CLINS X002 and X003 INVOICING AND EXCESS FUNDS
Offerors shall invoice CLINs X002 and X003 in accordance with Section G-4. Offerors shall invoice all costs, including supplier and subcontractor costs, within 90 days from the CLIN period of performance completion date identified in the contract. Any contract expenses not invoiced within this timeframe may be determined unallowable by the Contracting Officer.
At 90 days, the Government will evaluate all costs billed and allowable for the CLINs. Any excess funds may be removed via unilateral modification by the Government.
LIMITATIONS ON INDIRECT COST RATES –CLINs X002 and X003:
(a) Pursuant to FAR 42.707, an indirect cost rate ceiling is incorporated into the contract. "Indirect cost" is defined as set forth at FAR
31.001 and 31.203. "Indirect cost rate" is defined as set forth at FAR 42.701.
(b) Notwithstanding the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), the allowable indirect cost under this contract shall be obtained by applying limitations on indirect cost rates to bases agreed upon by the parties, as specified below.
(c) Allowability of costs and acceptability of cost allocation methods shall be determined in accordance with FAR Subpart 31.2 in effect on the date of this contract, as limited by the indirect cost rates established by this requirement.
(d) The indirect cost rates contained in the Contractor's and Subcontractor’s accepted contract proposal shall be incorporated into the contract schedule as limitations on indirect cost rates for each Contractor fiscal year of contract performance. The basis to which the indirect cost rates apply shall be those contained in the Contractor's and Subcontractor’s accepted contract proposal and hereby, incorporated into the contract schedule, in accordance with the Contractor's and Subcontractor’s accounting system upon which its proposal was based.
(e) The Government will not be obligated to pay any additional amount should any final indirect cost rates for any Contractor fiscal year
(or for any different period agreed to by the parties) exceed the indirect rates incorporated into the contract schedule. In the event any of the Contractor's or Subcontractor’s final indirect cost rates are less than the indirect cost rates incorporated into the contract schedule, the incorporated rates shall be reduced to conform with the lower rates.
(f) The limitations on indirect cost rate shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. If facilities capital cost of money is proposed as an allowable cost, the rates proposed shall be subject to the limitations imposed by this requirement.
(g) The limitations on the indirect cost rate shall apply to all work performed under the contract, and to all change orders and supplemental agreements, including changes due to growth, supplemental, emergent, and new work.
(h) Notwithstanding any of the terms of this requirement, should the Contractor initiate a change to its accounting systems which would alter the composition of any overhead base or pool effected by this requirement, the Contracting Officer and Contractor shall negotiate to determine the rate ceilings to be applied to the overhead pools, provided that no agreement shall be made which would increase the costs paid by the United States under this contract. Only those rates proposed and incorporated at the time of award will be considered, no new rates will be added, and no increase in costs will be accepted.
***The Limitations on Indirect Cost Rates applies to CLINs X002 and X003. Rates subject to the limitation include overhead, material handling, and/or General and Administration (G&A).
INDIRECT RATES AFTER AWARD:
If an Offeror fails to identify or disclose as part of its proposal an indirect cost rate that would otherwise be applicable to one of the support or subcontract cost items, it shall not be allowed to invoice for the indirect rate after award since the evaluation of its offer did not include that rate.
EXCESS/WASTE:
Offerors are cautioned that hazardous materials shall be ordered and stocked to the levels determined by the Contractor to be necessary to support the FRCs and to that identified in the contract (never out listing for long lead items). Any hazardous materials ordered and unsold as part of regular stock will be considered excess/waste. Any amounts above the quantities identified in the never out list will also be considered excess/waste. Failure to adhere to First In First Out (FIFO) procedures which creates excess/waste for regular stock or never out quantities will also be considered excess/waste. These types of excess/waste will not be reimbursed by the Government and will remain the property of the Contractor. Offerors shall reference the Performance Work Statement for more details.
These unsold, excess/waste quantities are unallowable under this contract. Accordingly, the Government will not reimburse these quantities as a direct cost or indirectly through a rate which is only allocable to this contract whether or not the rate was intended to be allocable to other contracts at the time of award.
CONTRACTOR PROPOSAL:
Offeror proposal(s) will be incorporated and form a part of the contract(s), when awarded. Proposal submission and contract award are based upon commitments included in offeror submissions. Compliance to proposal(s) will be monitored along with performance to the basic contract terms and conditions.
ACCESS TO THE TECHNICAL LIBRARY AND TECHNICAL EXHIBITS (TEs):
The technical library for this RFP and TEs shall be posted to SAM.gov on a restricted basis. Below is the process for requesting access to the technical library:
a. If a package requires explicit access, when the packages sub-tab is clicked, the vendor will see a warning indicating that the controlled, unclassified documents require explicit access.
b. To request explicit access, use the “request explicit access” button.
c. If a request for explicit access was previously submitted and is pending review, the vendor will see designation that explicit access was previously requested.
d. Vendors will receive email notification once their request has been approved or rejected.
Offerors must be registered in the System for Award Management (SAM) Registration database. Registration must be completed online at https://www.sam.gov. In order to limit control of the documents, they shall be handled as “For Official Use Only.” All offerors, other than the awardee, are required to destroy the documents once contract award is announced.
https://www.sam.gov/
ORGANIZATIONAL CONFLICT OF INTEREST:
(a) The Contracting Officer has determined that this acquisition may give rise to an organizational conflict of interest (OCI). Accordingly, the attention of prospective Offerors is invited to FAR Subpart 9.5 --Organizational Conflicts of Interest.
(b) DLA has received questions regarding potential organizational conflict of interest. Industry concerns appear to raise potential issues that some firms may have gained a competitive advantage based on possession of source selection information that is relevant to the contract but is not available to all competitors, and such information would assist that contractor in obtaining the contract as defined in
FAR subpart 9.505(b).
(c) The contracting officer is inviting offerors’ attention to this this issue IAW FAR subpart 9.705-1(a), Solicitation Provisions. Pursuant to FAR subpart 9.507-1(b), the contracting officer has considered these concerns, in particular whether source selection information that is relevant to the contract is available to some competitors and not others and whether possession of such information would assist that contractor in obtaining the contract. The Government has not disclosed any source selection information prepared for use by DLA for the purpose of evaluating any proposal; however, offerors are encouraged to review the definition of “source selection information” as found in FAR subpart 2-101, Definitions, to determine whether any actual or potential organizational conflicts of interest exist at this time.
(d) Individual contracting situations shall be examined by offerors on the basis of its particular facts and any possible impact those facts may have on any future contract award. Given this awareness, DLA is hereby incorporating the requirements of FAR 9.5 into the solicitation requiring any offeror to identify any actual or potential OCIs and to submit an acceptable OCI mitigation plan addressing all
OCIs. The Contracting Officer shall not award a contract until the DLA Contracting Officer determines any conflict of interest is reasonably resolved. The Contracting Officer has the sole authority to determine whether an OCI exists and to determine whether the OCI has been reasonably resolved.
(e) The OCI plan will not be evaluated as part of technical acceptability. However, as part of its proposal submission, the Offeror shall submit an acceptable OCI plan (including mitigation plans for any identified OCIs), if applicable. In the event the Offeror determines there is no actual or potential OCI, the offeror must certify to that effect. The Plan or Certification shall be provided under Tab 9 of Volume I of the offeror’s proposal.
(f) The Government may communicate with any Offeror at any time during the evaluation process concerning the submission of any future
OCI Mitigation Plan.
(g) Termination for default. If a successful Offeror was aware, or should have been aware, of an OCI before award of this contract and did not fully disclose that conflict to the Contracting Officer, the Government may terminate the contract for default.
(h) Waiver. The agency reserves the right to waive the requirements of FAR 9.5, in accordance with FAR 9.503.
END OF SECTION B
https://advance.lexis.com/document/?pdmfid=1000516&crid=23edf484-0bd3-4c1a-89a6-a436ba2d69fc&pddocfullpath=%2Fshared%2Fdocument%2Fadministrative-materials%2Furn%3AcontentItem%3A6082-37G1-DYV0-G14M-00000-00&pdcontentcomponentid=6321&pdshepid=urn%3AcontentItem%3A607X-4D13-CGX8-550B-00000-00&pdteaserkey=sr2&pditab=allpods&ecomp=gxdsk&earg=sr2&prid=32a1dd04-2230-4cbb-a980-153dab22f329
SECTION C – DESCRIPTION/SPECS/WORK STATEMENT
C-1 See Attachment J.1: Section C – Performance Work Statement
C-2 DLAD Procurement Note C02: Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and
Obsolete Materials or Components (DEC 2016)
The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data
Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
C-3 DLAD Procurement Note C03: Contractor Retention of Supply Chain Traceability Documentation (JUN 2020)
(1) By submitting a quotation or offer, the contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph (2) of this procurement note, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source’s Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program
(CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/).
(4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
C-4 DLAD Procurement Note C04: Unused Former Government Surplus Property (DEC 2016)
To be considered for award, the offeror must complete and submit the following representation with their offer. Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer.
(1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes __ No __
The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and
Government Entity (CAGE) Code and part number, specification, etc.). Yes __ No __ The material conforms to the revision letter/number if any is cited. Yes __ No __ Unknown __ If No, the revision does not affect form, fit, function, or interface. Yes__ No __ Unknown __ The material was manufactured by:
(Name): ______________________________________________________________________
(Address): _____________________________________________________________________
(2) The offeror currently possesses the material Yes __ No __
If yes, the offeror purchased the material from a Government selling agency or other source.
Yes __ No __ If yes, provide the following:
Government Selling Agency: ______________________________________________________
Contract Number: _______________________________________________________________ Contract Date: (Month, Year):
Other Source: __________________________________________________________________
Address: ______________________________________________________________________
Date Acquired: (Month/Year) _____________________________________________________
(3) The material has been altered or modified. Yes __ No __
If Yes, the offeror must provide the name of the company that performed the alteration or modification and attach or forward to the contracting officer a complete description of the alterations or modifications.
(4) The material has been reconditioned. Yes __ No __
If Yes, (i) the price offered includes the cost of reconditioning /refurbishment. Yes __ No __; and (ii) the offeror must provide information on the company that reconditioned the material with the certifications and attach or forward to the contracting officer a complete description of any work done or to be done, including the components to be replaced and the applicable rebuild standard. The material contains cure-dated components. Yes __ No __
If Yes, (i) the price includes replacement of cure-dated components. Yes __ No __; and (ii) provide cure date to the contracting officer.
(5) The material has data plates attached. Yes __ No __
If Yes, the offeror must state below all information contained thereon, or forward a copy or facsimile of the data plate to the contracting officer.
(6) The offered material is in its original package. Yes __ No __
If yes, the offeror has stated below all original markings and data cited on the package; or has attached or forwarded to the contracting officer a copy or facsimile of original package markings:
Contract Number ____________________________________________________________________
NSN____________________________________________________________________________
CAGE Code__________________________________________________________________________
Part Number ________________________________________________________________________ Other
Markings/Data___________________________________________________________
(7) The offeror has supplied this same material (National Stock Number) to the Government before. Yes __ No __
If Yes, (i) the material being offered is from the same original Government contract number as that provided previously. Yes __ No __; and (ii) state below the Government Agency and contract number under which the material was previously provided:
Agency _________________________________________________________________________
Contract Number_________________________________________________________________
(8) The material is manufactured in accordance with a specification or drawing. Yes __ No __
If Yes, (i) the specification/drawing is in the possession of the offeror. Yes __ No __; and (ii) the offeror has stated the applicable information below or forwarded a copy or facsimile to the contracting officer.
Yes __ No __
Specification/Drawing Number _____________________________________________________ Revision (if any)
Date___________________________________________________________________________
(9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes __ No __
If Yes, (i) material has been re-preserved. Yes __ No __; (ii) material has been repackaged. Yes __ No __; (iii) percentage of material that has been inspected is ____%; and/or (iv) number of items inspected is _______; and (v) a written report was prepared. Yes __ No __; and if Yes, the offeror has attached the written report or forwarded it to the contracting officer. Yes__ No__
The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation, Inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection.
The offeror has attached or forwarded to the contracting officer one of the following, to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies):
___ For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA
Disposition Services Form 1427, Notice of Award, Statement and Release Document.
___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material.
___ When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number.
(This information has already been provided in paragraph (c)(6) of this clause. Yes __ No __.)
___ When none of the above are available, other information to demonstrate that the offered material was previously owned by the
Government. Describe and/or attach.
This only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer’s overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items.
If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted.
In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met
Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract.
C-5 DLAD Procurement Note C05: Changes to Key Personnel (OCT 2016)
Certain skilled, experienced, professional and/or technical personnel are essential for successful accomplishment of the work to be performed under this contract. These are defined as "key personnel" and are those persons whose resumes are submitted as part of the technical/business proposal for evaluation. The contractor shall use key personnel as identified in its proposal during the performance of this contract and will request contracting officer approval prior to any changes. Requests for approval of any changes shall be in writing with a detailed explanation of the circumstances necessitating the change. The request must contain a complete resume for the new key personnel and any other pertinent information, such as degrees, certifications, and work history. New key personnel must have qualifications that are equal to or higher than those being replaced. The contracting officer will evaluate the request and notify the contractor whether the requested change is acceptable to the
Government.
C-6 DLAD Procurement Note C08: Tailored Logistics Support Purchasing Reviews (FEB 2017)
(1) From the commencement of performance of this contract until 3 years after the final contract payment, the contractor must allow the contracting officer, ACO, Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), and any other duly authorized representative of the contracting officer access to all records and information pertaining to those items or services for which the
Government is relying on the contractor’s purchasing system to determine that competition was obtained or to justify that prices are fair and reasonable. The contractor must maintain records subject to this clause for not less than 3 years after the contract final payment.
(2) The contracting officer may conduct reviews of purchased items or services provided under this contract regardless of dollar value that meet the criteria in paragraph (1) to ascertain whether the contractor has obtained the best value. The contractor must obtain competition to the maximum extent practicable for all purchases. Prior to purchasing any supplies or services, the contractor must solicit a competitive quotation from at least two independently-competing firms. For other than sole source items, the request for quotations must, to the maximum extent practical, solicit offers from different manufacturers or producers. If the contractor is unable to obtain quotes for competing items from two or more independently-competing firms, the contractor must retain documentation supporting its rationale for selection of the suppliers solicited and selected and its determination that the price was fair and reasonable. The contractor is responsible for maintaining this documentation for all sole source/non-competitive actions. The following price reasonableness and documentation requirements are applicable to all purchases, regardless of dollar value:
(i) A price is reasonable if it does not exceed a price incurred by a prudent person in the conduct of competitive business. The contracting officer will examine the prices with particular care in connection with buys that may not be subject to effective competition restraints. The contractor’s price will not be presumed to be reasonable. If an initial review of the facts results in a challenge of a specific price by the contracting officer or the contracting officer’s representative, the burden of proof must be upon the contractor to establish that the price is reasonable under the standards in FAR Subpart 15.4 and FAR 31.201-3.
(ii) The contractor must keep the documentation to a minimum but must retain data supporting the purchases either by paper or electronically. At a minimum, price quotations and invoices must be retained. Should the contractor receive an oral price quotation, the contractor must document who the supplier or subcontractor is by complete name, address, telephone number, price, terms and other conditions quoted by each vendor. Price quotes for supplies must be broken down by individual items, shipping costs, and any other included expenses. Price quotes for incidental services which are not pre- priced in the contract must include labor hours and costs or prices, as applicable, including the total price of the job, individual pricing for the portions of the work if applicable, materials, and all other elements of cost, overhead, and profit. This price breakdown documentation must be made for each subcontractor performing work on this contract.
(3) When applicable, if the contractor is purchasing from subcontractors or other sources and receives a discount or rebates, the contractor must immediately pass these savings to the Government in the contract price and invoice for payment. The contractor is required to use diligence in the selection of the most economical method of delivery of the product or services by selecting a best value method of delivery based on the urgency and nature of the work or product required. When labor hours are involved in the work to be accomplished and the contractor has not already pre-priced the effort to use its own labor force, the contractor must provide the labor at rates required by the contract (for example, Service Contract Act or Davis-Bacon Act rates) or at rates based on competition if mandatory rates are not required by the contract.
(4) If the contracting officer determines that the purchased product or service is unreasonably priced, the contractor must refund to the
Government the amount the contracting officer determines is in excess of a reasonable price. The contracting officer must notify the contractor in writing in accordance with FAR 32.604 Demand for Payment, giving the basis for the determination and the amount to be refunded. The contractor must make the refund payment in accordance with directions from the contracting officer and must provide proof of the refund payment to the contracting officer. The contracting officer may collect the amount due using all available means in accordance with FAR Subpart 32.6. FAR 52.232-17, Interest, is applicable to payments not made within 30 days of the demand for payment. Any disputes arising under this provision must be handled in accordance with the “Disputes” clause of this contract.
C-7 DLAD Procurement Note C14: Correction of Nonconforming Packaging or Marking (MAY 2020)
(1) The Government may correct nonconforming packaging or marking for receipts of DLA-owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor.
Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
(2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
END OF SECTION C
SECTION D – PACKAGING AND MARKING
No Applicable Clauses
END OF SECTION D
SECTION E - INSPECTION AND ACCEPTANCE
CLAUSE(S) INCORPORATED BY REFERENCE
FAR CLAUSE TITLE DATE
E-1 52.246-3 Inspection of Supplies – Cost reimbursement
*APPLICABLE TO CLINs X002 and X003 ONLY*
MAY 2001
E-2 52.246-4 Inspection of Services – Fixed-Price
*APPLICABLE TO CLINs X001 and 0005 ONLY*
AUG 1996
E-3 52.246-5 Inspection of Services – Cost-Reimbursement
*APPLICABLE TO CLIN X002 and X003 ONLY*
APR 1984
E-4 52.246-16 Responsibility for Supplies APR 1984
E-5 DLAD Procurement Note E05: Product Verification Testing (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a
Government-designated testing laboratory.
(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause
52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor’s sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor’s signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test
Samples – Do Not Post to Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]” adjacent to the
MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:
(a) Hard copies of the contract;
(b) Material certifications/process operation sheets; and
(c) Drawings used to manufacture the units and return shipping information.
(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the
Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.
(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The
Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
E-6 Quality/Performance Evaluation
(a) The Government will use a Quality Assurance Surveillance Plan (QASP) IAW FAR 46.401, to monitor compliance with contract terms and conditions, identify…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .