A024 - Physical Security Plan.pdf

PDF 165 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA Federal contract opportunity
Solicitation number
SP3300-20-R-5001
Issued by
Defense Logistics Agency Distribution

About this file

This document contains a Contract Data Requirements List (CDRL) for a physical security plan and related federal contract opportunity for warehousing services at a Defense Logistics Agency distribution center. The CDRL requires the contractor to submit a physical security standard operating procedure within 30 days of contract award and updates within 30 days of any changes. The security plan must address procedures, physical security measures, prevention of unauthorized access, protection from threats, and participation in working groups in accordance with the DLA Physical Security Manual. The related federal contract opportunity is a solicitation for warehousing and distribution support services at the DLA Distribution Center in San Diego, California. Services are required at three sites supporting wholesale operations, retail support, and additional on-site support. The opportunity involves storage and distribution of a wide range of commodities including repairable parts, electronics, industrial products, medical supplies, construction materials, clothing, petroleum, chemicals, metals, and marine craft.

View the file

Other files for this federal contract opportunity

Other files attached to Warehousing Services at DLA Distribution San Diego, CA, newest first.
File Type Posted
DDDC SP3300-20-R-5001 Questions 3.19.2020.docx DOCX document
SP330020R5001 Amend 0007 3-16-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.11.2020 AF Responses.docx DOCX document
Amendment 0006.pdf PDF
Amendment 0004.pdf PDF
Attachment J.2 Site Specific PWS 2-26-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 2.26.2020.docx DOCX document
Amendment 0003.pdf PDF
Attachment J.4 Wage Determination 2015-5635, Rev 12.pdf PDF
Attachment J.38 Staffing Matrix 2-14-2020.xlsx XLSX spreadsheet
DDDC Occupancy and Density report as of Jan 2020.pdf PDF
Attachment J.2 Site Specific PWS 2-5-2020.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training 2-5-2020.docx DOCX document
Amend 0001 Attachment J.2 DDDC PWS.docx DOCX document
A031 - MPC Cargo Status Report Amend 0001.pdf PDF
Amendment 0001.pdf PDF
Attachment J.26 TE 5.0 APLs.doc DOC document
A004 - MECSP 1.28.20.pdf PDF
Attachment J.33, TE 5.6, Local Delivery and Pick Up Points.rtf RTF text file
Physical Security v2.pdf PDF
Final PPC Instructions DDDC Jan 2020 V1.pdf PDF
A013 - Monthly Cost Report for Material Support CLIN.pdf PDF
A015 - Monthly Cost Report for Special Projects and Surge and Sustainment CLIN.pdf PDF
A006 - Quality Control Plan.pdf PDF
Attachment J.26, TE 5.0 APLs.doc DOC document
A009 - Management Plan (MCCP).pdf PDF
A020 - Shipment to Restricted Country - Approval Necessary.pdf PDF
A036 - Local Delivery Refusal Log.pdf PDF
A017 - Government Cargo Recovery Effort Program (GOCARE) Program.pdf PDF
A001 - Transition Plan and Weekly Reports.pdf PDF
Attachment J.18, TE 3.4 GE MHE.xlsx XLSX spreadsheet
Attachment J.40 Draft Distribution Operations Training Schedule.xlsx XLSX spreadsheet
A027 - Monthly Contractor Employee CAC Report.pdf PDF
A004 - Surge, Sustainment, and Disaster Recovery Plan (SSDRP).pdf PDF
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
Attachment J.1 DDDC PWS.docx DOCX document
Attachment J.4, Wage Determination San Diego, Ca.docx DOCX document
Attachment J.35, TE 6.3N, MPC Home Ported Ships.rtf RTF text file
Attachment J.36, TE 5.9 DSS Load and Maintain.docx DOCX document
Attachment J.30, TE 5.5 Type Physical Inventory Code (TPIC) Matrix 07.02.2019.docx DOCX document
Attachment J.13, TE 1.2 CAC Procedures.docx DOCX document
A002 - SOH Plan and Reporting.pdf PDF
A012 - Monthly Cost Rpt for Non-Capital Equip New or Replacement CLIN.pdf PDF
A022 - RPO Quarterly Audit Checklist 9.25.19 (003).pdf PDF
Attachment J.20 TE 3.6 GE Office Equipment.xlsx XLSX spreadsheet
A037 - MPC Non-Delivery Log.pdf PDF
A005 - Internal Order Number (ION) Reporting.pdf PDF
Attachment J.42, Past Performance Questionnaire.docx DOCX document
Attachment J.14, TE 2.1 Definitions, Acronyms, and Abbreviations.docx DOCX document
A003 - Electrostatic Discharge (ESD) Control Program.pdf PDF
Show all 50

Warehousing Services at DLA Distribution San Diego, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A024
2_TITLE_OF_DATA_ITEM: Physical Security Plan
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Attachment J.1, Paragraph C-1.4
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: C
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J-7 Contract Spec
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Tailored to permit contractor's format. Submit electronically. The Physical Security Standard Operating Procedure (SOP) shall be submitted NLT 30 days prior to the start of full performance for the first submission. Changes to the Physical Security SOP that address the Contractor’s approach to conform to applicable DoD and DLA regulatory guidance shall be submitted within 30 calendar days of the change.

The Physical Security SOP shall address the Contractor’s approach:

1. For procedures and physical measures designed to safeguard personnel, property, and operations.

2. Prevention of unauthorized access to equipment, facilities, material, and information

3. Protection against espionage, terrorism, sabotage, damage, misuse and theft.

4. To address the requirements in DLA Physical Security Manual 2011, specifically Chapters 1, 2, 4; 7; 8, 10, 11, and 12.

5. Participation in working groups identified in DLA Physical Security Manual 2011, Chapter 17.

6. Education and training identified in DLA Physical Security Manual 2011, Chapter 18.

Block 7 - Inspection and acceptance requirements:

The Contract Specialist will review and accept the Physical Security SOP and updates after coordination with Installation Support Safety Office review and comments.

Block 14 - Distribution - Contractor to submit original to Contract Specialist and copy to the COR.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:
2018-11-02T12:51:03-0400
CRUSEY.SHANE.M.1287981151
2019-02-13T14:42:14-0500
POWERS.CULLEN.MARTIN.1093893227

File details come from the government source that posted it. Updated .