A002 - SOH Plan and Reporting.pdf

PDF 166 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA Federal contract opportunity
Solicitation number
SP3300-20-R-5001
Issued by
Defense Logistics Agency Distribution

About this file

This document contains a Contract Data Requirements List (CDRL) and details of a solicitation for warehousing services. The CDRL outlines safety and occupational health reporting requirements, including submission of an initial SOH plan within 30 days of contract award and quarterly reporting. The contractor must address SOH standards compliance, hazard identification and prevention, and safety training. Distribution is required to the Contracting Officer and Contracting Officer's Representative.

The related solicitation is for warehousing and distribution support services at Defense Logistics Agency sites in San Diego, California. The contractor will provide services at Naval Base San Diego, Naval Air Station North Island, and Naval Base Coronado involving storage and handling of depot-level repairables, electronics, industrial goods, medical supplies, construction materials, clothing, petroleum, chemicals, metals, and ship/aircraft parts. The award date is unspecified.

View the file

Other files for this federal contract opportunity

Other files attached to Warehousing Services at DLA Distribution San Diego, CA, newest first.
File Type Posted
Attachment J.1 DDDC Performance Work Statement 3-12-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.11.2020 AF Responses.docx DOCX document
Amendment 0006.pdf PDF
SP330020R5001 Amend 0005 3-9-2020.docx DOCX document
Amendment 0004.pdf PDF
Attachment J.38 Staffing Matrix 2-14-2020.xlsx XLSX spreadsheet
Attachment J.2 Site Specific PWS 2-26-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 2.26.2020.docx DOCX document
Amendment 0003.pdf PDF
Attachment J.2 Site Specific PWS 2-5-2020.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training 2-5-2020.docx DOCX document
DDDC Occupancy and Density report as of Jan 2020.pdf PDF
Attachment J.33, TE 5.6, Local Delivery and Pick Up Points.rtf RTF text file
Physical Security v2.pdf PDF
Amend 0001 Attachment J.2 DDDC PWS.docx DOCX document
A031 - MPC Cargo Status Report Amend 0001.pdf PDF
Amendment 0001.pdf PDF
Attachment J.26 TE 5.0 APLs.doc DOC document
A004 - MECSP 1.28.20.pdf PDF
Final PPC Instructions DDDC Jan 2020 V1.pdf PDF
Attachment J.1 DDDC PWS.docx DOCX document
Attachment J.4, Wage Determination San Diego, Ca.docx DOCX document
Attachment J.35, TE 6.3N, MPC Home Ported Ships.rtf RTF text file
Attachment J.36, TE 5.9 DSS Load and Maintain.docx DOCX document
Attachment J.30, TE 5.5 Type Physical Inventory Code (TPIC) Matrix 07.02.2019.docx DOCX document
Attachment J.13, TE 1.2 CAC Procedures.docx DOCX document
A012 - Monthly Cost Rpt for Non-Capital Equip New or Replacement CLIN.pdf PDF
A022 - RPO Quarterly Audit Checklist 9.25.19 (003).pdf PDF
Attachment J.20 TE 3.6 GE Office Equipment.xlsx XLSX spreadsheet
A037 - MPC Non-Delivery Log.pdf PDF
A005 - Internal Order Number (ION) Reporting.pdf PDF
Attachment J.42, Past Performance Questionnaire.docx DOCX document
Attachment J.14, TE 2.1 Definitions, Acronyms, and Abbreviations.docx DOCX document
A003 - Electrostatic Discharge (ESD) Control Program.pdf PDF
Attachment J.5 DD254 DDDC 2019 Continuation Pages.pdf PDF
A013 - Monthly Cost Report for Material Support CLIN.pdf PDF
A015 - Monthly Cost Report for Special Projects and Surge and Sustainment CLIN.pdf PDF
A006 - Quality Control Plan.pdf PDF
Attachment J.26, TE 5.0 APLs.doc DOC document
A009 - Management Plan (MCCP).pdf PDF
A020 - Shipment to Restricted Country - Approval Necessary.pdf PDF
A024 - Physical Security Plan.pdf PDF
A036 - Local Delivery Refusal Log.pdf PDF
A017 - Government Cargo Recovery Effort Program (GOCARE) Program.pdf PDF
A001 - Transition Plan and Weekly Reports.pdf PDF
Attachment J.18, TE 3.4 GE MHE.xlsx XLSX spreadsheet
Attachment J.40 Draft Distribution Operations Training Schedule.xlsx XLSX spreadsheet
A027 - Monthly Contractor Employee CAC Report.pdf PDF
A004 - Surge, Sustainment, and Disaster Recovery Plan (SSDRP).pdf PDF
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
Show all 50

Warehousing Services at DLA Distribution San Diego, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A002
2_TITLE_OF_DATA_ITEM: Safety and Occupational Health (SOH) and Reporting
3_SUBTITLE: SOH Plan and Reporting
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: J1 - PWS C-1.5
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: C
10_FREQUENCY: XTime
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See block 16
13_DATE_OF_SUBSEQUENT_SUB: See block 16
addressee1: J-7
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Tailored to permit contractor's format. Submit electronically.

A. SOH program plan shall be submitted NLT 30 days prior to the start of full performance for the first submission. Changes to the SOH Plan that address the Contractor’s approach to conform to applicable Safety and Occupational Health Standards shall be submitted within 30 calendar days of the change. The SOH Plan shall address the Contractor’s approach:

1. Developing and implementing systems to effectively identify, evaluate, prevent, and control occupational hazards to prevent employee injuries and illnesses through: management leadership and employee involvement; worksite analysis; hazard prevention and control; and safety and health training.

2. For the Safety and Occupational Health Representative(s) to perform safety and occupational health management, surveillance, inspections, and safety program enforcement and how integrated into the Contractor's Quality Control Plan (QCP)

3. To establish a Hazard Reporting Program and HAZ/COM IAW DoD 6050.5.

4. Conforming to the SOH standards consistent with the most stringent of applicable Federal, State, local regulations and the DLA Distribution Occupational Safety and Health Instruction.

5. To use ESAMS

B. On a quarterly basis (date to be provided by the COR), the contractor shall provide the following data for the previous three (3) month period:

1. Date OSHA 300 Log Posted

2. Date the Abatement log was last reviewed

3. Date of Last Annual Self Assessment

4. Date of Last Quarterly Council Meeting

5. Date of Last Quarterly Supervisor Inspection

6. TCIR

7. DART

8. Percent of Hazards identified in ESAMs by the Contractor w/ Interim Controls

Block 7 - Inspection and acceptance requirements:

The Contract Specialist will review and accept the SOH plans and updates after coordination with the COR and Installation Support Safety Office review and comments. The COR will review and accept the quarterly information.

Block 14 - Distribution - Contractor to submit original to the Contract Specialist and copy to the COR.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:
2018-10-29T15:44:50-0400
CRUSEY.SHANE.M.1287981151
2019-02-13T13:51:24-0500
POWERS.CULLEN.MARTIN.1093893227

File details come from the government source that posted it. Updated .